Document jNgRXbeXgrODvKny8Rq0j9dap

I iJ Il i1 Ii V u r* t: r >1 n L fP p n & IT' 4. Adjust Hydraulic Chuck Pressure Move lever 1 Fig. 8 to position. Adjust regulating valve at 6 Fig. 6 to proper tension as indicated by gage 7 Fig. 6 according to the value etched on the arbor. If no value is given on. the arbor, use the value given in the table 3 Fig. 6. Fig. 8. This view locoted ot 3 Fig. 1. head to the desired value on the scale and vernier 4 Fig. 7 by inserting an Allen wrench in pinion 5 Fig. 7. Tighten the three nuts. 5. Install Chuck and Drawrod Move lever 1 Fig. 8 to the dechuck position. Turn off the main line switch and install the chuck 1 Fig. 9 in the work spindle, according to the pro cedure outlined on Page 27. Then install and tighten the drawrod onto the chuck stem 2 Fig. 9 by inserting an Allen wrench at 8 Fig. 6. Thread the nut 5 Fig. 9 on the drawrod against the shoulder of the piston. Tighten the nut 4 Fig. 9 and adjust the nut 5 Fig. 9 for the amount of travel according to the chuck layout. Hold nut 5 Fig. 9 and tighten jam nut 6 Fig. 9. 6. Install Index Gears Consult the 22.5/N index chart sent with the machine for the index change gears. The driver shaft is identified in the change gear compart ment shown at 6 Fig. 10. Be sure , to allow just enough backlash in each gear mesh to prevent the gears from binding. These gears determine how many teeth will be cut in the gear blank. A set-over clutch is provided on the shaft 1 Fig. 10. It is used for turning the work spindle. Loosen the thumb screw 4 Fig. 10, open clutch by rotating knurled handle 3 Fig. 10, and turn clutch dial 5 Fig. 10 by rotating knurled handle 2 Fig. 10 lii 13 B fT f.i it GLEASON-000223