Document jNeO4Jj9No12aax83b4naMr4Z
(Conoco) INTEROFFICE communication
TO: D. R. Unruh
FROH:
W. 0. Lukens
DATE:
April 10, 1990
SUBJECT: SAFETY MEETINGS/SAFETY TRAINING - MARCH 1990
OPERATIONS SUPERVISORS
# Of Cumul. Mtgs. Attend.
Group Total
Topics
18 Lockout, Tagout" - Film
SAFETY MEETING
102 Shutdown Considerations by George Braxton
TOTAL
120
Units; ACID/THERMAL
#1 COKERS/SLUICERS DOCKS (LOADING)
96 43 "Lockout, Tagout" - Film, "What If" Alky Acid Oil Pump Blew, Proper Procedures For Reporting And Handling Accidents In Company Vehicles, Progress on W-12 Davit Project, Discussed Incident at Sulfur/Acid Loading Rack - Spot 10, Discussed Mechanical parking lot, Discussed checking out jobs and permits before work begins, Discussed the hazards of faulty equipment when using pure oxygen
52 40 Discussed Work Permit Codes, H-27 Start-up and H-26 Shutdown, Incident at Sulfur/Acid loading rack. Upcoming plant shutdown, Gas Release Drill
21 14 Near Miss Instrument Technician #2
Coker, "Tie Up/Turn Loose" vessels
during
high
winds/stormy
conditions, Wearing Life Jackets,
Shut down loading/unloading during
electrical storms
REPOR: SMST039O.DOC
COMMITMENT LEADERSHIP TEAMWORK
vie? QO<o- C^ 4S68
Safety Meetings - March 1990
Page 2 April 10, 1990
OPERATIONS, (cont'dl EFS
FCC
laboratory
# Of Cumul. Mtgs^ Attend,
Group Total
Topics
3 19 27 "What If" discussion on pinhole
leak at heater tube & rupture of
heater tubes. Emergency Heater
Shutdown,
Unplugging
bleeders
safely
4 23 30 New lab sample tags, CL in flare system - Procedures manual, Blown seal - P-402 Big Slurry Pump
29
POWER PLANT
3 26 14 "Lock-Out & Tag-Out", Discussed Shelter-In-Place Olln release
PUMPHOUSE REFORMER
SC/RC
4 35 25 Discussed Safety Procedures in Issuing Permits and changing conditions day-to-day, Procedure painting contractor is to follow. Unsafe practices by contractors
S 49 21 JSA - "Leaking Seal" reformate
splitter pump, Discussed near-elss
at the #2 Coker drum A the
importance of lock-out devices.
Soil
And
Water
Emissions
Procedures, Excess 0^ Guidelines
for H-15 by R. Truelove, Beruene
safety
4 57 33 Near Miss Accident - #2 Coker Drum #3, Mechanical work on the super structure, Preparing Hot oil pump for mechanical work
DEPARTMENTAL TOTAL
44
498
276
REPOR: SMST0390.DOC
Safety Meetings - March 1990
Page 3 April 10, 1990
MECHANICAL SUPERVISORS
SAFETY MEETING
# Of
Cumul. Attend.
Group Total
T9E.ics
1 41 -- Stress" - by B. Terry
* *--
TOTAL Crafts; CARP/INSUL-PAINT/JANITOR
ELECTRICIANS
1 1 I
INSTRUMENT TECHNICIANS
1
MACHINISTS (OS/IN)/TOOLROOM
5
PIPEFITTERS TRANSPORTATION UTILITY HELPERS
1 1 1
41 --
19 25 Video on Benzene, Safety belt & respirator inspection, Standard *13 Benzene Compliance Plan handed out
20 20 Switch racks in Tank Farm water problems, Discussed procedure for working on cooling tower fans, safety procedure for working on lights on towers
29 30 Industrial Hygiene Standard #13 Benzene Compliance Plan, Nomex clothing standard and replacements, Use of pesticides for combating wasps
40 27 Industrial Hygiene Standard #13, HAD pump P466, On-the-job and at-home safety, Managing Stress, Us* of safety belts, Caring for respirators
25 32 Film - "Benzene", Handed out Industrial Standard #13, Nooex policy
12 14 Pipeline manifold near-miss accident, Work Permit Procedure requirements
26 26 Film - "Benzene", Emergencies * Major Leak or Spill, Identifying levels of restrictions at physical locations
REPOR: SMST0390.DOC
^
_-fety Meetings - March 1990
Page 4 April 10, 1990
MECHANIC^!- fcontlnued_lL WELDERS
COMBINED CRAFTS
# Of Mtgs^
Cumul. Attend.
Group Total
Topics
1 19 21 Jacks, welding leads on welding machine. Faulty tools to be returned to tool room, Benzene safety standard
2 86 -- General Safety - by D. R. Unruh
DEPARTMENTAL TOTAL
15 317 195
SUPERVISION/TECH SERVICES
# Of Mtgs.
Cumul. Attend.
Group Total
Topics
TECH SERVICES
4 60
Near miss accident investigation, Review of sulfur railcar unloading & how designs can be made safer, Vessel Entry and Inspection by Mike Abshire
INSPECTIONS
1 6 6 Film - "Turnaround 86", Discussed upcoming turnaround
DEPARTMENTAL TOTAL
5 66 6
REPOR: SMST0390.DOC
MC^ 0QQQl4S7l
Safety Meetings - March 1990
Page 5 April 10, 1990
ACCOUNTING/CLERICAL Departmental;
# Of Cumul. Mt&s,, Atggna.
Group Total
Topics
ACCTG., CLERICAL, SECRETARIAL,
PROJECT GROUP, CREDIT UNION
1
32 35 "911" - by Gary Hayes
WAREHOUSE ACCTG.
1 14 16 "What Are You Afraid Of?" Phobias
DEPARTMENTAL TOTAL
2
V. 0. Lukens Safety Director Lake Charles Refinery
am
cc: ESJ DHB SHD ORB DDF