Document jNeO4Jj9No12aax83b4naMr4Z

(Conoco) INTEROFFICE communication TO: D. R. Unruh FROH: W. 0. Lukens DATE: April 10, 1990 SUBJECT: SAFETY MEETINGS/SAFETY TRAINING - MARCH 1990 OPERATIONS SUPERVISORS # Of Cumul. Mtgs. Attend. Group Total Topics 18 Lockout, Tagout" - Film SAFETY MEETING 102 Shutdown Considerations by George Braxton TOTAL 120 Units; ACID/THERMAL #1 COKERS/SLUICERS DOCKS (LOADING) 96 43 "Lockout, Tagout" - Film, "What If" Alky Acid Oil Pump Blew, Proper Procedures For Reporting And Handling Accidents In Company Vehicles, Progress on W-12 Davit Project, Discussed Incident at Sulfur/Acid Loading Rack - Spot 10, Discussed Mechanical parking lot, Discussed checking out jobs and permits before work begins, Discussed the hazards of faulty equipment when using pure oxygen 52 40 Discussed Work Permit Codes, H-27 Start-up and H-26 Shutdown, Incident at Sulfur/Acid loading rack. Upcoming plant shutdown, Gas Release Drill 21 14 Near Miss Instrument Technician #2 Coker, "Tie Up/Turn Loose" vessels during high winds/stormy conditions, Wearing Life Jackets, Shut down loading/unloading during electrical storms REPOR: SMST039O.DOC COMMITMENT LEADERSHIP TEAMWORK vie? QO<o- C^ 4S68 Safety Meetings - March 1990 Page 2 April 10, 1990 OPERATIONS, (cont'dl EFS FCC laboratory # Of Cumul. Mtgs^ Attend, Group Total Topics 3 19 27 "What If" discussion on pinhole leak at heater tube & rupture of heater tubes. Emergency Heater Shutdown, Unplugging bleeders safely 4 23 30 New lab sample tags, CL in flare system - Procedures manual, Blown seal - P-402 Big Slurry Pump 29 POWER PLANT 3 26 14 "Lock-Out & Tag-Out", Discussed Shelter-In-Place Olln release PUMPHOUSE REFORMER SC/RC 4 35 25 Discussed Safety Procedures in Issuing Permits and changing conditions day-to-day, Procedure painting contractor is to follow. Unsafe practices by contractors S 49 21 JSA - "Leaking Seal" reformate splitter pump, Discussed near-elss at the #2 Coker drum A the importance of lock-out devices. Soil And Water Emissions Procedures, Excess 0^ Guidelines for H-15 by R. Truelove, Beruene safety 4 57 33 Near Miss Accident - #2 Coker Drum #3, Mechanical work on the super structure, Preparing Hot oil pump for mechanical work DEPARTMENTAL TOTAL 44 498 276 REPOR: SMST0390.DOC Safety Meetings - March 1990 Page 3 April 10, 1990 MECHANICAL SUPERVISORS SAFETY MEETING # Of Cumul. Attend. Group Total T9E.ics 1 41 -- Stress" - by B. Terry * *-- TOTAL Crafts; CARP/INSUL-PAINT/JANITOR ELECTRICIANS 1 1 I INSTRUMENT TECHNICIANS 1 MACHINISTS (OS/IN)/TOOLROOM 5 PIPEFITTERS TRANSPORTATION UTILITY HELPERS 1 1 1 41 -- 19 25 Video on Benzene, Safety belt & respirator inspection, Standard *13 Benzene Compliance Plan handed out 20 20 Switch racks in Tank Farm water problems, Discussed procedure for working on cooling tower fans, safety procedure for working on lights on towers 29 30 Industrial Hygiene Standard #13 Benzene Compliance Plan, Nomex clothing standard and replacements, Use of pesticides for combating wasps 40 27 Industrial Hygiene Standard #13, HAD pump P466, On-the-job and at-home safety, Managing Stress, Us* of safety belts, Caring for respirators 25 32 Film - "Benzene", Handed out Industrial Standard #13, Nooex policy 12 14 Pipeline manifold near-miss accident, Work Permit Procedure requirements 26 26 Film - "Benzene", Emergencies * Major Leak or Spill, Identifying levels of restrictions at physical locations REPOR: SMST0390.DOC ^ _-fety Meetings - March 1990 Page 4 April 10, 1990 MECHANIC^!- fcontlnued_lL WELDERS COMBINED CRAFTS # Of Mtgs^ Cumul. Attend. Group Total Topics 1 19 21 Jacks, welding leads on welding machine. Faulty tools to be returned to tool room, Benzene safety standard 2 86 -- General Safety - by D. R. Unruh DEPARTMENTAL TOTAL 15 317 195 SUPERVISION/TECH SERVICES # Of Mtgs. Cumul. Attend. Group Total Topics TECH SERVICES 4 60 Near miss accident investigation, Review of sulfur railcar unloading & how designs can be made safer, Vessel Entry and Inspection by Mike Abshire INSPECTIONS 1 6 6 Film - "Turnaround 86", Discussed upcoming turnaround DEPARTMENTAL TOTAL 5 66 6 REPOR: SMST0390.DOC MC^ 0QQQl4S7l Safety Meetings - March 1990 Page 5 April 10, 1990 ACCOUNTING/CLERICAL Departmental; # Of Cumul. Mt&s,, Atggna. Group Total Topics ACCTG., CLERICAL, SECRETARIAL, PROJECT GROUP, CREDIT UNION 1 32 35 "911" - by Gary Hayes WAREHOUSE ACCTG. 1 14 16 "What Are You Afraid Of?" Phobias DEPARTMENTAL TOTAL 2 V. 0. Lukens Safety Director Lake Charles Refinery am cc: ESJ DHB SHD ORB DDF REPOR: SKST0390.DOC