Document jNVnO1Gxx5JemrOOaevpJLdm2

ST007I 994 - b57,A/ *! DOW CHEMICAL U.S.A. April 9, 1907 MIDLAND. MICHIGAN 4B674 L. w. Alexander, Michigan Division, 47 H. M. Bell, Louisiana Division, Plaquemine, LA B. O. Bowley, E&CS, Houston, TX T. S. Christensen, Field Distribution, 2020 WHDC A. R. Custer, Western Division, Pittsburg, CA T. B. Craig/P. J. Fisher, 2020 WHDC J. D. Dawson, CD Medical, Inc., Miami, FL J. B. Dudney, Texize, Greenville, SC W. A. Fluke, Merrell Dow, Cincinnati, OH L. A. Jasper, Consumer Products, Indianapolis, IN J. M. Szollosi, Eastern Division, Strongsville, OH D. D. Worman, Texas Operations, B-101, Freeport, TX J. D. Young, COBA, 2010 WHDC cc: K. R. Davis, 2020 J. A. Gray, 2030 R. D. Olson, 1803 P. M. Pankratz, 2020 R. A. Smith, 2030 Attached is the summary of OSHA/MSKA inspection activity in Dow U.S.A. during 1986. Dick Falk U.S. Area Safety lr Attachment AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY RESTRiceO FOR USE WTm!N TMg OOW CHEMICAL COMPANY Meant More At Dow 1986 OSHA Inspections Dow Contractor Safety Health Safety Health E&CS Marketing Product Departments/COBA CD Medical Inc. Merrell Dow Consumer Products Dept. Texize Western Division Michigan Division Eastern Division Texas Operations Louisiana 0 1 0 0 0 No Inspect. No Inspect. No Inspect. No Inspect. No Inspect. No Inspect. No Inspect. 1 0 1 1 1 0 8 1 0 0 0 0 0 0 2 Total (OSHA) (16) 1 4 9 -2 ST007I995 Houston Dow Center Total (MSHA) (2) 1986 MSHA Inspections Dow Safety Health 20 20 9 6 6 1 L001S DOW CHEMICAL U.S.A 1986 OSHA AND MSHA INSPECTIONS DATE LOCATION/PLANT 09/29/86 to 11/13/86 Western Division Pittsburg Plant Chlorine Cal/OSHA 01/02/86 Ludington Site Michigan Division (Contractor) Dept, of Labor 01/06/86 to 01/10/86 Midland Site Michigan Division (Contractor) Dept, of Labor 03/13/86 Ludington Site (Same as 01/02/86) 04/01/86 Midland Site Michigan Division 9001 Building Dept, of Labor 05/22,23, Midland Site & 28/86 Michigan Division (Contractor) Dept, of Labor 05/29/86 Midland Site Michigan Division (Contractor) Dept, of Labor 10/13/86 Midland Site Michigan Division (Contractor) Dept, of Labor 11/17/86 to 11/20/86 Midland Site Michigan Division (Contractor) Dept, of Labor REASON FOR INSPECT. Special Emphasis Program CITATION 11 - "Other than Serious" PENALTY $250.00 MIOSHA Construction General Inspection (Contractor - Northern Boiler) NONE MIOSHA compliance NONE Construction Inspectior New Aspirin Plant (Same as 01/02/86) NONE Accident Investigation YES - 2 Items "Other than Serious" MIOSHA Compliance NONE Construction Inspectior (At the AFA Project Hovel New Analytical Lab) MIOSHA Construction Accident Investigation (Contractor DAW Hydaker-Wheatlake) NONE General Inspection MIOSHA 4 - Proposed NONE NONE NONE NONE NONE NONE Unknown General Inspection MIOSHA 3 - Proposed Unknown __________________________________ S T 0 0 1 1991 DOW CHEMICAL U.S.A. 1986 OSHA AND MSHA INSPECTIONS DATE LOCATION/PLANT 12/01/86 to 12/11/86 Midland Site Michigan Division (Contractor) Dept, of Labor 01/28/86 Magnolia Plant Eastern Division Calcium Bromide Plant (Contractor) 04/24/86 Columbus Operations Columbus, Ohio Eastern Division 01/29/86 to 03/05/86 Texas Operations LaPorte Site Phosgene REASON FOR INSPECT. General Inspection MIOSHA CITATION 16 - Proposed PENALTY Unknown Routine NONE NONE Compliance W/OSHA "Workers Right-To-Know" Program (Haz Com) Special Emphasis Program NONE NONE SERIOUS Section 5 (a) (1) Valve below safety Valve was not chained open OTHER 1910.151 (c) Safety shower location OTHER 1910.20(g)(1)(ii) Access to records OTHER 1910.20(g)(1)(i) Availability of Records OTHER 1910.1200(d)(5)(ii) MSDS did not include exposure limits OTHER 1910.1200(g)(2)(iv) MDSD did not include symptoms OTHER 1910.1200(g)(2)(vi) MSDS did not include exposure limit data $560 $-0$-0$-0$-0- $-0- $-0- ST007I998 DOW CHEMICAL U.S.A. 1986 OSHA AMD MSHA INSPECTIONS DATE LOCATION/PLANT 02/12/86 Louisiana Division Vinyl I Plant REASON FOR INSPECT. Ethylene Dichloride Release of 02/11/86 CITATION NONE PENALTY NONE 03/26/86 Louisiana Division (Contractor) Asbestos Removal NONE NONE 09/30/86 to 10/03/86 Louisiana Division Cell Service Block (Contractor) Complaint from Contract Employee against contractor involving the handling of Asbestos I - Serious II - "Othar-than Serious" $ 400.00 $1680.00 01/08/86 & 06/13/86 Houston Dow Center Lignite Cleaning Facility-Fairfield Texas (Energy Resources Dept.) MSHA Routine Inspection (EVERY 6 Months) NONE NONE ST007I990 'pdU 0 5 ^ E DOW CHEMICAL U.S.A. 2020 Willard H. Dow Center May 2, 1988 MIDLANO. MICHIGAN 48674 M. Bator, 47 Building H. M. Bell, Louisiana Div T. S. Christensen, 2020 T. B. Craig, 2020 J. D. Dawson, CD Medical J. B. Dudney, Texize J. J. Fasone, 2020 W. A. Fluke, Merrell Dow L. A. Jasper, Consumer Products H. McCall, E&CS A. G. Mundt, Freeport R. J. Rouse, Pittsburg J. M. Szollosi, Strongsville J. D. Young, 2010 cc: K. R. Daivs, 2020 J. A. Gray, 2020 R. D. Olsen, 1803 P. M. Pankratz, 2020 R. A. Smith, 2030 Attached is the summary of OSHA Inspections at Dow facilities during 1987. Dick Falk U.S. Area Safety sm Attachments AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY RESTRICTED FOR USE WITHIN THE DOW CHEMICAL COMPANY =Qualltv= rci im iiiancc Means More Al Dow DOW CHEMICAL U.S.A. 1987 OSHA AND MSHA INSPECTIONS 00 O o VjO DATE 2-2-87 and 2-3-87 LOCATION/PLANT REASON FOR INSPECT. Ilerrell Dow, Cincinnati Contractor - Special 44 Building (Contractor Emphasis Program CITATION PENALTY 6 Citations $1250 Serious No guardrail on temporary platform(2 > Other-Than--Serious e non approved flammable can e no backup alarm on vehicle (2) e exposed electrical receptacle 1 3-3-87 Western Division Pittsburg Plant Syra-Tet Injury with Hospitalization (Dow DAW Case 3-1-87) None 3-31-87 Eastern Division Riverside Plant Randomly selected for recordkeeping audit. Special Emphasis Pro gram None 5-15-87 DCPInc. Indianapolis Routine None 2-19, 25, Michigan Division General Inspection & 26, 1987 Midland Site (Contractor (MIOSHA) 6 Citations 4-2-87 Michigan Division Follow-up to February Midland Site (Contractor Inspections None None ' None I ! } None Unknown I i l ' 1 I None ; 5-20-87 & 6-1-87 to 6-5-87 Michigan Division General Inspection Midland Site Contractor) (MIOSHA) 7 Citations e demolition con Unknown tractors failed to have "demolition !i survey" report on ! job site e no crane inspectioi i report with crane or on job site e swing radius of crane not barricadt id Continued ST007I 992 DOW CHEMICAL tJ.S.A 1987 OSHA AND MSHA INSPECTIONS DATE LOCATION/PLANT REASON FOR INSPECT. 5-20-87 S Michigan Division 6-1-87 tc Midland Site (Contractor) 6-5-87 General Inspection (MIOSHA) 7-14-87 Michigan Division Midland Site 433 C bldg (Contractor) 10-1-87 Michigan Division Midland Site 239 bldg (Contractor) 10-27-87 Michigan Division Midland Site Dewatering Pond (Contractor) Asbestos Removal Demolition Project Employee Complaint CITATION PENALTY 7 Citations (Cont. Unknown No back-up alarm on construction equipment (end loader) grinders being used without guards worker in condor i without safety belt and lanyard attached inappropriate lighting in work area Yes None 3 proposed Unknown None None 7-14-87 Louisiana Division Cellulose Plant (Contractor) 8-31-87 Louisiana Division Chlorine Plant Contract Employee Complaint - Exposure to asbestos fibers Chlorine Release of 8-29-87 1 - "Other-thanserious" None None None STO17591 DOW CHEMICAL U.S.A. May 21, 1987 LOUISIANA division p. o. box iso PLAQUEMINE. LOUISIANA 70765-0150 304 3B9-S000 Ray Gaska, 3701 Mike Nevill, 3502-E Henry Bell, 4701T cc: Roddey Peebles, 5601 ASBESTOS HANDLING AUDIT RESULTS The attached letter contains the findings of the audit team that visited Cell Service on May 6, 1987. The auditors included Rich Chauviere from the Chlor-Alkali Tech Center in Freeport, Fred Sabel, industrial hygienist from the Michigan Division, and Stan Gorgacz, Industrial Hygiene Manager of the Michigan Division. The audit findings were generally very favorable. Five recommendations were made as outlined in the attached letter. I would like to inform you of our decisions and/or corrective actions that resulted from these recommendations. Recommendation number one: We have installed labels on all tanks, containers and pipes that contain or are used to transport asbestos. The labels contain the proper wording as specified in the asbestos standard. Recommendation number two: All portable drinking water containers have been moved out of the work area. They are now restricted to an area beside the soft drink machines next to the office area. Recommendation number three; This has been implemented exactly as recommended. Recommendation number four: This was discussed in depth and the decision was made to continue to have showering at the end of the work period as an option. Protective clothing is requiredin all areas where asbestos is handled and decontamination facilities (boot washers and high efficiency vacuum cleaners) are installed for use when employees leave the work area. If employees wish to shower in addi tion to this then they may do so. AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY