Document jEGYpg88YRE8aaeZ43abGqwp

r- ' OWINS FlBERGLAS to Hr* 0* Preston subject K-l? Door Core - Process intra-company corresponden from A. K. Weaver date September 13, 1971 cc; Initial Process A. Raw Materials - For the remainder of 1971, we are planning to use those rev materials currently being used in Berlin* Ingredient Vendor Grade S-33 Amosite Asbestos ?DCbrysotile Asbestos lif Chrysotile Asbestos Quicklime Supersii Korth American Asbestos Lake or Carey Asbestos Lake or Carey Asbestos Warner Lime Co Penns. Glass Sand Co. B* Mill, - Our present mill is adequate. The S-33 and the k T fibers will be "dry grilled" with the ?D added in bulk to the miser. C. Mixer - Our present small (18Q cu. ft.) mixer will be sufficient with a slight increase (to iiO - !i5 rpa) in agitator speed re* commanded. Mixing time * 30 minutes. D. Pouring * 1. Pump - The 3" x $n Moore and White Centrigugal on loan from Berlin with our variable drive is to be used. 2. Piping - The piping is to be at floor level from the pump to the pouring area. A two inch diameter flexible hose with pouring nozzle will be used. 3. Pouring Area - The pouring area to the west end of the Tjrcor press will be adequate to service our 1971 business. Our capacity at this location will be approximately L50 boards/month (12 boards/ hour. This will enable us to begin marketing the product for only the cost of the molds and the installation of pipe from the pump to the pouring area. The screwed-off slurry can be captured with sheet metal troughs emptying into 5 gallon buckets for the short tejm* 1*. Molds - The temporary (angle iron on autoclave plates) rs>lds will be used for the C. L. trials scheduled for 9/16 - 17. Plans are to purchase 6 molds of Pershing's 8/25/71 design for approximately $313/ibo14 for production of 50 boards for Mohawk's first order in late October. 5- Mold Release - Continued use of urethane strips and motor oil/5/5 polyethylene is seen. 01 501 1281 VWMH177