Document jBvqXEG1rZ76gzmpbbLj2VpN9

PLAINTIFF'S EXHIBIT S-500 PLANT SHUTDOWN OR DEMOLITION POLICY: Plants or process equipment shutdown without known intent of restarting, or plants shutdown for eventual demolition shall be put in a clean and safe condition. SCOPE: This standard defines the minimum requirements for leaving a plant, process equipment, warehouse or pipelines in a clean and safe condition. DEFINITIONS: Owner: the owner of the plant, equipment, c'` pipeline or building is the present, or last Major Managers' Department using the facility. Normally the Plant Superintendent or his designated representative will be considered the "owner". In the absence of a Plant Superintendent the Major Manager or Section Manager of the Department shall assure that a desig nated "owner" is identified. Clean and safe condition: condition such that appropriate persons not familiar with the process could dismantle lines and equipment without possibility of chemical exposure, electrical shock, or thermal bums. OWNER RESPONSIBILITY: 1. Take appropriate steps to prepare facilities, which are to be shutdown, so as to be left in a clean and safe condi tion. A shutdown checklist (example attached) shall be completed, with additional documentation related to the shutdown condition attached, signed by the Owner and the Section or Major Manager and a copy sent to the Safety Department. 2. Take appropriate steps to prepare facilities, which are to be abandoned or scheduled for eventual demolition, so as to be left in a clean and safe condition. Abandonment, demolition or removal shall follow the procedure of Engineering Practices Ml-900, Kl-910, Ml-920, Ml-921, Ml-922. Appropriate survey forms (attached to practices) shall be completed, with additional documentation related to the shutdown condition attached, signed by the Owner and the Section or Major Manager and a copy sent to the Safety Department. EFFECTIVE DATE: December 8, 1986 Page 1 of 4 SHUTDOWN CHECKLIST Building No.__________________ Shutdown Date_ Shutdown of: Department Assistance From: Person Contacted: Safety Engineer ________________________________________ Environmental Services ________________________________________ Industrial Hygiene ________________________________________ Security/Fire Dept. ________________________________________ Process Engineering ________________________________________ Control Systems _______________________________________ Loss Prevention ________________________________________ Investment Recovery _______________________________________ Div. Engineering ________________________________________ Rail Fleet Adm/Maint ~_________ Checklist 1. Chemicals removed from process ri-nraia yes i ] no C ] yes L ] no C ] 2. Lines, tanks, equipment cleaned. open and status tagged lines equipment tanks yes C ] yes [ ) yes [ 3 no [ ] no no c c 1] Attach list of items, previous chemicals and cleaning method 3. Drums cleaned and properly disposed yes [ ] no [ ] EFFECTIVE DATE: December 8, 1986 Page 2 of 4 ae >i Ho V <nt0 8 0 Q l 4 Sludge, heels or other remain* removed roa tanka, tank cars, tank trucks, dempsters tanks tank cars tank trucks dempsters yes [ 3 yes [ 3 yes C 3 yes L 3 no [ 3 no t 3. no [ 3 no [ 3 5 shutdown at plant done before C 3 no C 3 6. Changa of status racordad at N.O.T. for vassals, relief devices, sight gl< electrical grounds, flax-joints, roll equip., aanlifts, fork trucks yes [ ] no C 3 7. Waste materials properly disposed of in accordance with environmental standards. yes [ ] no [ ] 8. Raw materials properly stored or disposed of. yes [ ] no t ] 9. Radioactive sources removed or shutdown S-477 yes [ ] no C 3 Appropriate electrical switch gear off, fuses pulled and tagged. yes [ ) no C ] ii. Utilities, water, air, sewer, etc. left in safe status. cyes ( J no 3 12. Fire protection systems reviewed for correct status. cyes [ ] no 1 13. Operating procedure changes resulting from shutdown reviewed with appropriate people. yes [ ] no t 3 14. Inter-plant pipelines reviewed for compliance with S-645. yes ] no [ ] 15. Cylinders, tank cars or other equipment with demurrage released. yes [ 3 no [ 3 16. Asbestos on site removed identified cyee [ 3 no cyes [ 3 no ] 3 17. Additional documentation related to shutdown attached, (also information related to "no" responses) yes [ ] no [ 3 EFFECTIVE DATE: Decanter 8, 1986 Prepared by (Owner) Date Section Manager _Date (or) Major Manager Page 3 of 4 Copy to Safety Department - Date Other Distributions: _______________ EFFECTIVE DATE: Decenber 8, 1986 Page 4 of 4