Document jBpNDwd3DvJ9DB0GR5qRy4E45
? iaiij
Monsanto
FROM * NAME fc LOCATION)
N. Thompson - WGK
DATE
:
SUBJECT
:
REFERENCE
:.
TO
:
April 18, 1973
Scrubbing of Dept. 246 HC1 Off-Gas with C/S Acid
-' A. E. Leisy
CC-
E. R. Billen
' K. E. Boucher
D. K. Lynch
R. L. Fields
yW,,-----
C. Engman
J. K. Grant
J. R. Shafer
. J. F. Quinn - T3B
D. H. MacDonald -
F4WC
During the week of 4/9 Dept. 246 HC1 Off-gas was scrubbed using the C/S acid scrubber in Dept. 217. The scrubbed gas was drowned in water and sewered. Operation conditions during this period were:
Dept. 246
- Running 50% of capacity
C/S Acid Scrubber - 50 gallops C/S Acid
Drowning Water - 70 GPM well water
Ssimples of the sewered aqueous HC1 were collected and the analyses are presented below. Samples of the C/S acid were collected just prior to changing and analyzed for % assay.
DATE 4/11 4/11 4/12 4/12 4/13
TIME . 9:30 am
3:00 pm 7:30 am 1:30 pm 7:30 am
PCB(ppb) 410 4 iO -4 10 ' <10 <10
S04(ppm) 24.5 45. 5 22. 0 35.7 23.4
% HC1 Assay C/S Acid
2. 0
95. 21 (after 12 hrs.)
2. 83
2. 98 2. 00
75. 28 (after 24 hrs.)
2.59
The low S04 values indicate that essentially no gas stripping or degrada tion of the C/S acid occurred during the scrubbing process.
emc
. Neil Thompson
IN - 10 REV. 1/72
i
DSW 353126
'
STLCOPCB4085317