Document jBozVGV0a8XJgdB75Y9NjGd9p
FILE NAME Insulation Contractors & Distributors ICD
DATE 1970 May
DOC ICD010
DOCUMENT DESCRIPTION Article from Walls and Ceilings Trade Journal Sprayed Asbestos Viewed with Growing Alarm
Sprayed Asbestos
Viewed With
Growing Alarm
Careless spraying of asbestos insulating and fireproofing material is an pollution problem that has become a serious health hazard Dr. Irving J. Selikoff professor in medicine and environmental medicine Mt. Sinai School of Medicine warns
.
Regulations should be stringent rapidly prepared and quickly enforced Dr. Selikoff contends His dramatic presentation at the Las Vegas convention of the IAWCC
and many personal appearances since have produced
a sobering shock upon his audiences since much of his material is backed with dramatic slides scientific expenments and results of his intensive investigation of the problem
Dr. Selikoff says that one out of every 4 or 5 asbestos workers dies of lung cancer The very fine mineral
fibers are found almost invariably in the lungs of per-
sons autopsied in New York City
07412|
Once the fibers get into the lungs there is no way
to remove them and they cannot be dissolved he main-
tains Dust counts taken during spraying jobs
show on the order of 20 times the normal amount of
dust in the air he says
.
Entire buildings are sometimes
for
contaminated life because asbestos fibers are left loose on are columns and beams and these dead spaces
pipes
pipes
often
used as return air ducts for the building's circulation
system which exposes occupants of the building to con
stant peril
A means has been found observes Dr. Selikoff for minimizing the circulation of loose particles in wrapped asbestos coverings but no thoroughly satisfactory method of control for the spraying process has yet been perfected Until such a means is determined the only
procedure which can save large segments of the population from serious resperitory problems is to keep
spraying areas well protected and dampened and use the most careful housekeeping procedures in clean
and removal of loose material Workers are warned to use protective masks at all times to always apply ma-
terial away from prevailing winds and to carefully wash both their bodies and clothes as soon as possible
after exposure Exteriors of buildings should be thoroughly covered
Even at best however contends Dr. Selikoff these are interim measures for no thoroughly safe method has yet been found to control the hazards involved in the application process since after the material
dries loose particles are free to thoroughly contaminate
large areas both in and surrounding a building thus
treated
I urge manufacturers and industry to view this threat seriously and find immediate means for con-
trolling the hazards to millions of innocent citizens
cee,
Formerly INTERNATIONAL ASSOCIATIONE OF WALD & CEILING CONTRACTORSES
Formerly Re,
Contracting
Contracting
Plasterersgand~
a
Lathers International Association
:
a
iv: