Document jBddyKXy34J8YRLpao5JdL7kR
9
Arapahoe Station Jan. 30, 1
Mr. Harry Toung Ifarrh Chief Denver Malnt. Pool.
The following work was dona at Arapahoe during the month of January 195U
>- 3 The warmup line on 3A feed pump failed. The 1" line was leaking
'go thin that puap had to be taken out of serfice for safety. When the standby
no. 3C was put on line the oil circulator did not start to circulate oil for
several minutes, by the time puap was shut down the Kingsbury thrust had burned
out on the inboard thrust. I was called out at 10 PM to repair thrust. The thrust
disc was OK. The outboard thrust was OK. New thrust shoes were installed on the
inboard side of thrust after cleaning all oil lines and bearing boxes. The motor
to puap coupling seemed to move free eneugh. The line bearings were both OK.
No. 3 boiler had been held at a one pump loed while pump was out of service. New
oil put in pump. Puap test ran and reaqy for service at 2 AM.
Jan U Ralph Johnson from EBASCO came out and welded in a new 1* warmup line
on 3A feedwater pump. We made an orifiep of heat treated steel U" long with
socket weld for 1" pipe. The orifice size was 3/16". Schedual 160 pipe mas used
for the warmup line and a crane angle valve 2000 lb. was installed next to the pimp
discharge. On no. 2B feedwater the motes: was running rougher than normal. Coupling
inspected and found OK as far as alignment. Bearing clearance on motor was outboard
012" to .013" Inboard .Oil*" to .016" fhaft size 2.750" This was AUie-Chalmers
motor no. 337UUC630 - ESN -3-1. Mew beatings were installed. Clearance outboard
now .006" to .006" Clearance Inboard no# .006 to .008 Motor vibration now .001".
Puap back in service 5 fM Jan. 1;. Installed new section of 1" line 3 feet long in
Calgoo system. This Calgan line is all letting bad. Inspect no. 3 control air
comp. A small amount of carbon was found on discharge valves. No change in cyl.
walls. No mud or scale was found in water Jackets. Oil has been cut to two drops
per min to cyle. This has helped the carbon condition some.
Jan. 5 Start pulling runner and volut# no. 1C feedpump to install new cover to
barrel gasket. We got the cover to barrel flange off Jan. 6. When inspected we
found two cute in face of cover, gasket surface. The seat on barrel wae OK.
The cover wae sent to Pair and Binderup wlre gasket face was machined to remove
cute. The gasket face was then built back to standard with metal spray using
Molybdenum as the spray metal. Pump assembled Jan. 9* Tested and put in service
5*30 PM Jan. 9.
Jan. 6 Inspected no. 1 and no. 2 control air compressors. No carbon on valves,
no change in cyls. no mud or rust in water jackets. These compressors had been
running under no load all month. A new Dellinger air filter was installed on no. 1
control air compressor as a test. This is the comp that will be working during
IHIfrMt Jan. The filters that we now have on these comps, will only atop very
course material from entering the compressor as the screen size runs from about
3/16* to 1/8" mesit. Jan. 6 we finished thp l* sootblowing air line to the dust
collector no. 1 unit today. This is a blowing tube installed in air duet just
upstream of a row of dust separators about center of the bank of separator tubes.
The line has 5/16" holes drilled 6" apart And directed at the separator nozzles.
This is supplied with sootblowing air. This will be blown each time the soot
blowers are used to see what the effeet will be in the duet collector. Inspeoted
no. 1 eootblowing air compressor today. VAlves, cylinders and water jackets
clean and in good condition.
Jan. 7 Tear down portable fire pump foH inspection. Shaft sent to Qair and
Binderup for metal spray at packing g
of shaft. Fire puap assembled
and ready for test Jan. 28. Jan. 7
sootblowing air comp. Very
little carbon on valves almost no sil
water jacket. Ve also started
building a duct from the mirror on the firing level to the West water gauge glass
WAD00301
(2)
on no. 1 boiler. This is a test, it is supposed to keep out the light and let operator in control room have a better view of the gauge.
Jan. 9 The UO HP Allis-Chalmers motor on no. 3 control air comp, burned the bearing on the pulley end of motor. Compressor had been put in service because of same control trouble on no. 1 compressor. No. 3 motor ran only about 10 to 20 min. when it failed. The bearing melted and let rotor down on the statfer. This burned out the winding. Allis-Chalmers was tied in end the failure. The oil level was normal no reason was found for the bearing burning. The belts have not been adjusted. The compressor had run under boad during the month of Dec. with no trouble. Service was changed frca no. 3 to no. 1 comp, for Jan. No. 3 put on standby. The compressor was inspected for any cause of overload. Everything was OK. One of the original 30 HP motors was installed and compressor test ran. Operation OK. No repairs have been made on the kO HP motor as Allis-Chalmers indicates that they will do the Job. They are now looking into bearing design. We have started installing Oits oil caps on all Allis-Chalmers motors now so that the oil rings may be inspected. This will be done on all compressor motors. Primary fan motors on no. 1 and no. 3 unit ml 11 a. High press, drip pumps, low press, drip pumps, fire pump, and condensate tr&msfer pumps.
Jan. 12 We built and installed a chute in no. 3A coal bunker. This was to try to get the coal to feed farther out into the bunker in an ateopt to fill bunker a little fuller. This didn't work. The coal level was the same before and after.
Jan. 12 & 13 We installed grease fittings on all the gate valves on the ash handling and hydroveywr on ash handling systems. Also the pyrites hydroJet valves. We raised the baffle bar on the West apron coal feeder to get more coal capacity. We increased the feed a lot, but we also got ourselves into a good cleanup job aa the hopper loading no. 3 belt could not get rid of the coal fast enough. This dumped several ton of coal at the no. 3 belt tail pulley. We set the baffle bar back where it was and cleaned up the coal.
Jan. 13 The recirculating line on no. 1A feed pump cut through the pipe just down stream of the orifice. A new section of line was welded in between the orifice and valve at the deaerator. We also tore down the motor on 2A low prees. drip prop so that elect, could clean winding motor assembled and coupling lined up back in service Jan. 13 h %
Jan. lit Installed new skirting on coal belt hoppers. Removed one of the baffle plates from the hopper to no. 3 coal belt. Raised the feed regulating bar in West apron feeder. Hopper still couldn't take care of the extra lftad. Bar again lowered to cut feed. The stroke on the south reciprocating feeder was increased from U 3A" to 6 1/2" Dec. 28. This seems to be about the limit of feed that no. 3 hopper can taka care of with the present baffle setup. As soon as we have some good weather where it is safe to play with the coal feed, 1 will take out more baffle and see what it will do.
Jan. 15 Inspect no. 3 sootblcwing air compressor. Some carbon on HP discharge valves. Water Jacket clean. Started to install explosion doors on no. 1 turbine oil tank. Job could not be done while machine is on line due to lose of neg. press, in oil tank. This lots of vacuum lets oil spurt from the front bearing against the steam chest.
Jan. 18 The thrust bearing no. 2A feed prop wore out. Inboard line bearing started to wipe. Tou have complete details on a separate report on this job. Remove no. 1 control air compressor after cooler because of air leaking into cooling water. Almost all tubes were plugged with small rocks and carbon. Tubes roded out and rollsd. Cooler back in service U PH. All tubes OK. li men sent to 2uni to remove gas heaters from old shop, for installation at Arapahoe warehouse. Allan on coal today. Gardner off sick. Repack 3A low press, drip prop.
Jan. 19 Started installing gas heaters in Arapahoe warehouse. Inspect coal mills no. 1 unit. The condition is good. The new wear plates show no wear. All mills on no. 3 unit needed tightening down on the pressure springs. This was also done. All mills on No. 3 unit look OK. Britton on coal. Reed off sick.
Jan. 20 No. 3 sootbltxring comp, blew a gasket on HP disch. valve seat. This was replaced. Started building a cabinet for the turbine operators coffee.
WAD00302
(3)
Clean out hydroJet* no. 1 and 3 units.
Jan. 21 Started inspection and repair of no. 2 engine on locomotive. This "v started adding fuel to the crankcase oil, about 2 gal. last week.
Cummins sent a man out Jan. 26. New injectors were put in and engine tuned up. We have found no fuel in the oil since. Thile the service man was here the injectors were also set on no. 1 engine, also the Bay City crane and Tournadoser* We had to clean up breaker house again today. A check was ran on coal over the scale 252 ton per hr. This is too low. Replace clutch disks and bolts in reverse trans mission clutch on Tournadoser. Thaw atemperator sample lines no. 1 & 2 units.
Jan. 22 Motor bearings on no. 1A condensate reported hot and rough. Motor was pulled and dismantled. Bearings were inspected and found to be in good condition. Both bearings were very much overlubricated. Grease cleaned out and winding on motor washed. Motor assembled and reinstalled. Gap between couplings .053" at all points. Test ran made on pump, and turned back for service 5<30 PM. Bearings run cool. Bearing in 3A low pressure drip pump reported hot. Bearing removed and inspected. Bearing in good condition. We also found ths pillow block in this pump full to the top with grease. All grease removed from bearing and changed over to oil. An oil level indicator was installed in housing and turbine oil used. We have bean changing from grease to oil on the antifriction bearings where possible. They all seem to run cooler and more trouble free so far. Allan, Rogers, Connell off sick.
Jan. 25 We had to remove the 2urn service water filter for repair to the plug stem today. This is the filter that cleans the water to the circulating p"aps. Whan we work on this filter we have to run 3 hoses from the city water to the circ. pump glands. We changed this set-up this time. We installed valves in the service water line so that the Zurn filter may be cut out and one hose connected to the service water line which supplies the pumps. This is much faster and safer. Ths recirculating line header cut out between the deaerator and the valves. We had to weld a patch on the back side of header as doaerator could not be cut out. This patch was mads of U" pipe cut in half and abcut 30 inches long. A hole was cut in patch and a 1" coupling welded on where the patch covered hole in header. This relieved the pressure till weld was made. Then the coupling was plugged and seal welded. Savage, Jensen off sick.
Jan. 26 Myself, Jackson and Garts called out at b AM to weld patch over hols in no. 2 HP flash tank. The tank had cut through on the opposite side from the inlet line. There seems to be a large section of this tank that is thin. A patch 12" X 20" was shaped and welded on tank. Ready for service 9 <30 AM. We also had ths recirculating line on 2B boiler feedwater pumps cut out today, between the orifice and valve at deaerator header. A new section of schedule 120 pipe 6 in. long was welded in here. Back in service U<30 PIT.
Jan. 27 We installed the 3" meter on the city water line to the service water basin. The meter only lasted a few hours then came apart. I guess we were running too much water through it. Ths vent line from the bottom of ths 7th stage heater no. 1 unit cut through at the first ell from the heater shell. We removed the ells and built 2 expansion bottles. Thsse were installed and a new section of line welded in. Heater back in service 3>00 ?M Connell off sick at 2 PM.
Jan. 23 Connell off sick. Started building sediment bottles for orifice lines on gas headers no. L-2-3 units. Reed and Jensen to Dr. 10 AM to 12 N. Garts, Allan, Jackson attending Eutectic welding clinic.
Jan. 29 Build shields to cover packing glands on feed pumps. Remove and repair meter no. 3 Zeolite water softener.
Two men were busy all month insulating where we nave made repairs. They also paint ed insulation where it was replaced. Britton busy all month painting blr. fronts, deaerators, evaporators, vent condensers, evaporator preheaters, handrails and plant doors. One man spent several days painting pump bases and pumps. We did the oil changing on the locomotive, cat, and tournadoser this month because coal crew
WAD00303
(U)
**re busy most of the tine*
ar*
one man each Friday or Monday to clean
the warehouse. Ve didn't hare much water glass trouble on the heater* this month.
W* only replaced 2 on# on 7th stage no. 1 unit, one on Uth stage no. 2 unit. On#
on West side of no. 3 blr. One on no. 2 deaerator. We had to clean the hydro Jets
on no. 1-2-3 unit# several times due to wet flyash in noasles. Ve replaced one
inspection door no. 3 blr *et ash bottom. Painted the lines in acid roaa where acid
spray had removed paint. Cleaned the sampling coils on no. 1-2-3 unite also removed
and cleaned the scale from drain lines on sample tables. Freed up a few primary
and secondary air dampers and installed new pins in shafts where needed. Replaced
damaged grease fittings in coal conveyors. Freed up and greased frosen idler,
return and troughing pulleys on coal conveyors. Did some cleaning in plant building,
shop, and yard. This about covers everything for the month of Jan. 195U*
John Donaldson
WAD00304