.Januar7 29 1981
TO R. L. MC CLURE - BEAUMONT
J J. C. LEW - CHAMBERS WORKS
W. G. FISHER - CIRCLEVILLE H. W. GAUSS - CLINTON D. L. LESER - FAYETTEVILLE W. P. SPRAGUE - FLORENCE J. F. GLEITZ - GERMAY PARK J. M. HOBBS -HOUSTON H. R. DEUTSCH- LOUISVILLE S. M. NEMSER - PENCADER G. E. BURGE - PONTCHARTRAIN W. E. THOMAS - SABINE J. T. KEATING - SENECA R. L. BAIRD - SPRUANCE J. A. STOKES - TECUMSEH C. R. DEWEY -TULSA J. F. DOUGHTY - WASH. WORKS
FROM: HOWARD A. SMITH
R. R. BRINDLEY - WILLOW BANK R. C. MONSON - WURTLAND L. E. AMBORSKI - YERKES
K. J. HUISMAN - DORDRECHT J. ANDERSON - HILCOTE F. LENGLER - LUXEMBOURG L. APPLEBY - MAYDOWN H. BOL - MECHELIN
T. E. FARLEY. - CHESTNUT RUN T. E. NEAVES - CHESTNUT RUN L. R. PERKINS - EXP. STATION V. MUELLER - DISA GENEVA J. E. ROURKE - HEMEL HEMPSTEAD G. K. WALKER - STOW
M. L. GANNAWAY - BELLE D. B. SCHIEWETZ - GLASGOW R. E. DEVISH - MEMPHIS
GUIDE FOR ADMINISTERING CONTRACTS WITH OFF-SITE CONTRACTORS
Attached is the company Guide for Administering Contracts With Off-Site Contractors, prepared by the Energy & Materials Department and the Legal Department.
Please review this carefully, and see that others at your site receive copies and become familiar with this procedure. Your existing plant procedures should be reviewed in light of this guide.
Please call if problems develop. v
DUP 0501783
\ c \j^_s 5 * A
^ '*"**^^'* o*-
A v.
^*-**-5 A?
o- 'n*
HAS/sab Attachment
wiijCoi^
t
oA/<- eo.A cvAd
"tUn-s-e. #
A oA\nix% A&
nj---
^
UO 1----
^ V-^3k/Co
There s a woria of thipgs',we'V doing something about
Wc~<> wiA Wc-.s
V? M-' 2 /1 a, /s V
DU 001486
t
GUIDE FOR ADMINISTERING CONTRACTS WITH OFF-SITE CONTRACTORS 1. INTRODUCTION AND SCOPE This document sets forth performance guidelines for administering our contractual relationship with off-site contractors. (On-site guide lines are covered in ER-8629). 2. POLICY 2.1 The financial responsibility and ability to perform the services safely and competently'are important in contractor selection. 2.2 Contractor service arrangements should be formalized by written contracts, negotiated and prepared by_&M, approved by the Industrial/ Staff departments. Legal, and executed by the contractor and Du Pont, E&M. 2.3 A contractor should be given all available information concerning the use and disposal of Du Pont products and other materials specified bv Du Pont which are not normally used by the contractor. 2.4 Supervision by Du Pont representatives of contractors' operations generally should be avoided to preserve the independent contractor relationship. 2.5 If we become aware of contractor's failure to perform its services in accordance with our contract, the situation should be brought promptly to the attention of the contractor's supervision. Should the contractor fail to remedy the situation, the industrial department and E&M should be informed to determine appropriate action. 3. ESM, with assistance from industrial departments, have responsibility for selecting qualified contractors who are capable of safely performing requested services.
(
DUP 0501784
DU 001487
December 5, 1980
3.2 Selection criteria should include:
contractor's financial soundness,
technical and managerial capability
7 competent personnel and equipment to perform in an environ mentally sound manner
contractor's reputation and previous Du Pent experience, and
7# contractor's possession of permits necessary to perform waste disposal required by the contractual arrangement.
3.3 An evaluation of a proposed contractor should include an on-site
inspection of his facilities.
-
4. CONTRACT P33PA3ATZ21T
4.1 Although ESM is primarily responsible for the negotiation and development of contracts with contractors, the party requesting the service (Xr.dustrial/Staff Departments) is responsible for providing the scope of work and specifications. Where the work to be performed
is outside the scooa of the contractor's usual business and where Du Pont has che special expertise, the recuisitioner is responsible for acvisir.g SSJt cf all hazards concerning the requested service and Du Pent materials to be used, alone with recommended procedures and
sufficient information to enable the contractor to sarelv deal with
such hazards.
4.2 The industrial departments, in cooperation with E&M have the responsibility for determining the technical capability of the con tractor.
>/4.3 Contracts should specify that the contractor will follow hygienic and safety practices which are generally acceptable in his industry. Provisions should be included which permit Du Pont to take appropriate action if improper contractor practices are discovered.
DUP 0501785 DU 001488
December 5, 1980
4.4 All pertinent safety, health and environmental information should be communicated in writing to the contractor as cart of the contract. Where appropriate, this information should be personally discussed with the contractor to insure that such information is understood. 4.5- When new information concerning hazards of the operation and/or materials is accuired and Du Pont has reason to believe that contrac tor does not have it, S&M should promptly provide such information to the contractor either through a contract amendment or a letter referring to the contract. ^4.5 If the services include disposal of wastes from materials supplied by Du Pont, the considerations in Section 7 of this guideline become aoolicable to that oortion of the contract. 4.7 If tha contractor will supply a oroduct directlv to Du Font's customers, the contractor should orooerlr label it, be required to oerform adequate testing to assure that the oroducts meet specifi cations and maintain adequate quality control records and samples. 4.3 Standard General Conditions EM-5535 should be incorporated into all off-site service contracts except those, such as waste disposal, which have specialized standard conditions EM-5637, Rev. November 1380 and trash disposal EM 6534 rev 9/30.
5. CONTRACT ADMINISTRATION 5.1 Industrial departments have primary responsibility for field administration of contracts for both on- and off-site contract services. 3.2 The contract administrator should take reasonable steps to insure that the contractor performs in accordnace with the terms of the con tract. Every effort*should be made to preserve the independent contrac tor relationship. 5.3 Communications with the contractor should be made through con tractor management or his supervision.
3
DUP 0501786
DU 001489
December 5, 1980 5.4 The Du Pont administrator shall:
Have a copy of the contract document, Be thoroughly familiar with the contract Terms/Conditions
and the requestedservice, Verify that insurance coverage required by the contract is
obtained by the contractor and kepu in effect for its duration, Identify the contractor's supervision or management through
whom communications to the contractor should be made,
Maintain strong liaison with SSM and promptly advise ESM of unacceptable contractor performance that is not promptly corrected upon the request of- the administrator, and'
\|e Periodically reevaluate any safety, health and environmental information previously transmitted to the contractor to assure its adequacy and completeness.
5. SITS VISITATION 6.1 To determine that the contractor's performance is in accordance with the contract, periodic visits to his site may be advisable. Each department, with assistance from its legal advisor, should develop'a list of criteria for determining when such visits are appropriate. 6.2 visits to contractors should generally be coordinated through the S&M Department to avoid overlapping visitations. 6.3 Du Pont representatives visiting the contractors should have a business purpose for the visit and be familiar with the requested service and if appropriate have an understanding of the contract. 6.4 Contractor supervision should accompany the Du Pont representative during such visits.
4
DUP 0501787
DU 001490
December 5, 1980
6.5 The Du Pont representative should generally limit his involvement to observations and avoid giving the contractor any directions concer ning his operation. However, when a breach of any contractual obligation is observed, the contractor's supervision or management should be promptly advised of such breach.
6.5 If a site condition and/or operational problem is observed which poses danger to property, health or the environment, such as noncompli ance with contractual obligations, the absence of safety, monitoring and emergency-response equipment, inadequate maintenance of operating equip ment, or poor*safety procedures, the Du Pont representative should direct the contractor's supervision to correct the situation immediately. If the danger is imminent," in the absence of the contractor's supervision, the Du Pent representative should attempt to correct the situation or to stop the work.
6.7 After visitations, a record of the date of the visit and the name of tha Du Pont representative should be forwarded to the Department. ea-sraztor administrator. Normally the contractor also maintains a fscord cf feach visit.
>/s.3 Questionable observations concerning environmental conditions mads during the visit should be discussed with the Departmental Environ mental Protection Coordinator and E&M. If additional written records are deemed advisable, tha intended subject matter should be reviewed by Estt and legal before their creation.
5.9 If, the contractor does not take prompt, reasonable steps to correct a breach of any contractual obligation, appropriate action which may include termination of the contract should be first discussed with 25M.
7. MASTS DISPOSAL (IN ADDITION TO THE GENERAL GUIDELINES HEREIN, THE POLLOWING KEY POINTS APPLY TO OPP-SITE MASTS DISPOSAL CONTRACTING)
4/7.1 Administration of off-site waste disposal contract shall be the responsibility of the designated sita waste coordinator, and shall follow the guidelines of wl G. Simeral's waste disposal policy letter. (See reference 3.3)
5
DUP 0501788
DU 001491
December 5, 1930 ^7.2 Off-sita contract wasta disposal should be considered only after
datemining that a waste stream cannot be recycled or disposed of on site due to technical, economic or environmental reasons or cannot be sold to a party capable of using it in a safe and environmentally sound manner'. 01.2 First consideration should be given to other Du Pont plants with suitable waste disposal facilities when it becomes necessary to send wastes off-sits. ^7.4 Ail contracts should be negotiated and executed only by e&M. They should require that title to and responsibility for the wasta passes to the contractor and that the waste will be disposed of in an environ mentally safe manner in compliance with all laws and regulations. J 7.5 contracts for disposal of waste other than general trash shall include descriptions of the wastes and their properties. J 7,5 Site visitations will be conducted at least annually in accordance with tuidaiir.es established by individual operating departments. Such visi-s, by :<nowledgeabla Du Pont representatives, should be made prior oo renewing the contract, or whenever new information comes oo our attention which raises a question as to the adequacy of the contractor's oerfomar.ee.
6
DUP 0501789
DU 001492
i, *
t
c
u.ujl-'U-jfcif i. ^^.ftMifcisaaiuB
December 5, 1980
8. REFERENCES 8.1 "Guide for Non-Company Personnel on Company Sites" ER-8629, Du Pont Safety and Fire Protection Division Guidelines, Section 17.1.
8.2 "Contracting Services Procedure", Energy and Materials Department.
8.3 "Waste Disposal", Environmental Quality Committee policy statement letter, '7. G. Simeral, August 22, 19 80 .
WVHswis (
7
DUP 0501790 DU 001493