Document j7VXOnK69XXOgaRLaODzmrEy

OTHER LOCATIONS C. F. Buckley - WGK H. M. Galloway - Nitro , C. G. Hoffman - Delaware R. J. L. Solari - JFQ E. S. Tdcker - So. 2nd St. COMPANY CONFIDENTIAL GENERAL OFFICES M. E. Batz P. B. Hodges D. B. Hosmer W. A. Kuhn R. J. Stratmeyer J. N. C. K. ANNISTON % CarpentervW.B. Eastmeri\}.0. . Papageorge Severson L. L. Faulkner- W.F..Taffee R. A. Haydel H.L, Williams V. R. Haupt L. C. Lahman J. C. Landwehr A. G. McCarty G. W. Miller ,, PROGRESS REPORT TECHNICAL SERVICES DEPARTMENT ANNISTON, ALABAMA PLANT JOB NO. 370:740 REPORT NO. 2 DATE 7/23/69 TITLE: OBJECTIVE: Aroclor and HC1 Department Waste Audits To identify the sources of waste in the Aroclor and HCl Departments and to quantify these losses. PERSONNEL: E. G. Wright (W. F. Taffee) REPORTED BY: E. G. Wright SUMMARY: The major sources of organic (primarily Aroclors but with smaller amounts of Biphenyl, Santowax and HB-40) and acid waste in the Aroclor and HC1 departments have been identified and quantified. The average total losses of organic material from these departments is approximately 27#/day. The new warehouse drumming and flaking area accounts for almost half of the organic losses with an average daily loss of ll#/day. The remainder of these organic losses comes from the Aroclor still room sewer (2#/day), the chlorinator sewer (8#/day) and the HC1 department (6#/day). The acid losses from these departments came from two sources. The chlorinator sewer and the HCl department sewer. The chlorinator sewer showed an average loss of 1,100#HCl/day and the HCl department losses were an aver-* age of 15,500#/day. To provide facts on the effects of P.C.B. in plant effluent water. Snow's Creek and Choccolocco Creek were investigated, Snow's Creek was checked visually for two phase systems (i.e. Aroclor and water). None was noted more than one block from the plant boundaries. Six samples of mud and water were collected downstream from the plant (see attached map for locations of sampling points). These samples are now being analyzed by organic research. The results of these samples will be communicated as soon as they are received. ANNISTON . DSW 378601 STLCOPCB4099853 Anniston Plant Progress Report $370:740 (2) Company Confidential Page 2 FUTURE WORK 1. Continue to monitor organic losses periodically on the total plant outflow. 2. A decision will be made on continuing to sample on Choccolocco and Snow's Creek as soon as the results from the first set of samples are received. 3. Collect one set of fish samples from Choccolocco Creek and have these analyzed for P.C.B. levels. 4. Continue to look for a better method to collect samples from two phase (i.e. Aroclor and Water) systems. 5. Conduct a correlation study between the organic research method for P.C.B. and the Anniston method for total organics. Technical Services Department DSW 378602 STLCOPCB4099854 Anniston Plant Progress Report #370:740 (2) Company Confidential Page 3 DETAILS 1. Sampling and Analysis All samples taken during this audit were 24 hour composite samples with the exception of the "grab" samples taken from Snow's and Choccolocco Creeks. Two very definite two phase systems were noted during this audit. These were located in the warehouse sewer and in Snow's Creek about one block below the plant outfall. Sampling this two phase system has proven to be very difficult. We tried two methods. The first method was the slow peristaltic (Randolph type) pump. We then tried a high speed peristaltic pump. Both of these were unsatis factory. We are presently trying to trap the Aroclor phase in a sump located at the corner of the warehouse. This sump is being measured everyday and should provide a much better estimate of the volume of the second phase than we now have. ' The samples which were collected in the plant were analyzed for total organics by a method which was developed by the Anniston plant labora tory. The six sets of samples which were collected in Snow's and Chocco locco Creeks will be analyzed specifically for F.C.B. by Organic Research. There were two reasons for doing these analyses differently. The first reason was that the laboratory at Anniston did not have the proper faci lities such as a "clean room" and also that they did not have the correct type of election capture detector which was specific for P.C.B. To pur chase this detector and provide "clean room" (Aroclor free) working space would have cost approximately $16,000. The second reason was the time element involved. The P.C.B. method in the P.P.B. range required approxi mately 2-3 hours per sample. It was felt that running total organics on the in-plant {samples would be sufficient for determining exactly where the losses were originating. r 2. Flow Measurements . The flow from the HC1 department was measured by the Lithium chloride dilution method. This flow was verified by actual physical measurement. The flows from the Aroclor still room and the warehouse were determined by physical measurement. These flows were measured twice during the time which the waste audit was being conducted. HC1 Department Audit The HC1 department receives anhydrous HC1 from the chlorinators in the Aroclor department. This gas passes through a falling film type absorber where it is absorbed in water to form Muriatic Acid. The HC1 gas stream during the past has contained entrained organics which have caused problems in the production of Water White,organic free Muriatic Acid. During 1968 approximately one-third of the production was sewered in an attempt to solve this organics problem. This amounted to approximately 3^ M #/day of HC1. In mid-1969 a catch tank and a membrane type coalescer were installed to trap out and remove these organics. These two units are operating satis factorily and the plant is now producing Water White Muriatic Acid. The DSW 378603 STLCOPCB4099855 Anniston Plant Progress Report #370:740 (2) Company Confidential Page 4 HC1 Department Audit (Cont'd) organic material is composed of Biphenyl, Santowax and the lower chlori nated Biphenyls. This material is presently being drummed out and sent to the toxic dump. Sample Data These samples were collected for a period of 26 days. They were analyzed for pH, 7 HC1 and organics. Listed below are the daily high and low and an average value for the 26 day period. A complete list of all of the data is on the attached data sheets. The sampling point is noted on the attached process sewer map. ........... HC1 4/day Orgaincs Daily High 31,200 # 24 # Daily Low Average 1,200 # 15,500 # .1 # 6.0# Average Flow = 100 G.P.M. Warehouse Audit This sewer collects the wastes from the Aroclor drumming and flaking area in the new warehouse. It was found to be the largest singular contributor of organics to the sewer with an average daily loss of approximately 11.0 #/day of dissolved organics. The 2nd (organic) phase of this sewer is presently being trapped in a sump located at the north-east corner of the warehouse. During a one week period we collected approximately 2.5 gallons of organics or 27# for the 7 day period. This average 3-8 #/day plus the 11 #/day of dissolved material brings the total from this source to 14.8 #/day. We will continue to monitor this sump to gather long term data. These organics came from two major sources. These are the wet scrubber which was installed to scrub the vents from the Biphenyl and Aroclor flakers. The organic material and water is drained from the scrubber once per day. It is drained by drop ping the material into a drum and allowing the aqueous layer to overflow to the sewer. The other major sources are leaks and spills which are washed directly to the sewer when the floor is steam cleaned in the warehouse. Sample Data These samples were collected for a period of 28 days. They were analyzed for pH, 7. HC1, and organics. When it was found that the samples were neutral, pH and 7. HC1 was discontinued. Listed below are the daily high and low values and an average daily value for the sampling period. A complete list of the data is on the attached data sheets. The sample point is noted on the attached process sewer map. DSW 378604 STLCOPCB4099856 Anniston Plant Progress Report #370:740 (2) Company Confidential Page 5 Sample Data (Cont'd) Organics #/day Organic 2nd Phase 4/day High Low Average 65# 2.2# 11.0# 5-8# Average Flow = 90 G.P.M. Chlorinator Sewer This sewer catches the cooling water from the chlorinator and also the water from the drowning jets on the vents of the crude Aroclor blowing tanks. The major source of organics in this sewer are pump leaks from the circulating pumps on the chlorinators. The primary sources of HC1 are the drowning jets on the blowing tanks. Sample Data These samples were collected for only 13 days because repairs were being made on this Sewer when the audits were begun in the other parts of the Aroclor department. They were analyzed for pH, % HC1 and organics. Daily highs and lows and a daily average are listed below. A complete list of all data is shown on the attached data sheet. The sampling point is noted on the attached process sewer map. HC1 #/day High 3,000 # Low Average Daily 300 # 1,100 # Average Flow = 250 G.P.M. Aroclor Still Room Sewer This sewer receives all of the water used on the jets on the Aroclor stills. These samples were also analyzed for pH, 7. HC1 and organics. The pH and HC1 were discontinued when there was no HC1 detected in a number of samples. Sample Data ' These samples were collected for a period of 14 days. The average daily organics loss from this sewer was only 2 #/day. Listed below are the daily highs and lows as well as the average daily loss for the sampling period. A complete list of the data is located on the attached data sheet. The sampling point is noted on the attached process sewer map. STLCOPCB4099857 Anniston Plant Progress Report#370:740 (2) Company Confidential Page 6 Sample Data (Cont'd) Organics #/day High 8.9 # Low 1.6# Average Daily 2# Average Flow = 65 G.P.M. Choccolocco and Snow's Creek Due to the recent developments concerning P.C.B. in water and its effects upon wildlife, we decided to begin sampling the streams which receive our waste water from the Aroclor Manufacturing Process. We began sampling by first checking Snow's Creek for definite globules of Aroclor lying in the bottom of the creek. We were only able to detect this a distance of about 1 block from the plant boundaries. Other points further downstream were checked but no Aroclor layer was found. Samples were collected at six points downstream from the Anniston plant. One sample was caught upstream from the confluence of Snow's and Choccolocco Creeks. This sample is to be used as a blank. Both mud and water samples were caught at each of these locations. The exact locations where these samples were collected are shown on the attached map of the Choccolocco Creek watershed. The data from these samples will be published as soon as it is received. During September of 1968 two sets of samples (mud and water) were collected from Snow's Creek. These samples were analyzed for P.C.B. by organic research. Listed below are the results from these samples. Sample Location Sediment Water Plant Outfall 0.20 + 0.027. 58 + 2 P.P.B. 1 Block Below Plant Outfall 1.64' + 0.047. Sample Broken Calculation of the above data into #/day yields a value of approximately 1 #/day of P.C.B. which is actually lost to Snow's Creek. The probable reason for the difference between 27#/day which we lose in the plant and the l#/day which shows up in Snow's Creek is that the analytical method used to measure losses in the plant measures total organics losses. The'losses in Snow's Creek were measured using the Organic Research method which is specific for P.C.B. DSW 378606 STLCOPCB4099858 WASTE AUDIT DATA SHEET Department Aroclor Department rri*l UK Date PH 7.HC1 ganicE ffurgan LCS / day Sampling Point Aroclor Still Room Sewer Prod. Flow Rate Comments 6/S 6.6 NDA 2.0 1.6 65 GP1 6/4 6.7 NDA 11.3 8.9 - 6/5 6.7 NDA 2.5 2.0 - 6/6 7.2 NDA 5.5 4.2 - 6/7 6.3 NDA 6.0 4.7 -" 6/8 6.2 NDA NDA - - 6/9 6.3 NDA NDA - -- 6/10 6.2 NDA NDA - - 6/11 6.3 NDA NDA 6/12 7.1 NDA NDA ^- - 6/13 7.1 NDA NDA. - - 6/14 7.1 . NDA NDA - - 6/15 7.4 NDA NDA - ' - 6/16 7.5 NDA 7.5 - 5.8 - AVER; GE #/l AY = - 2 DJ5W 378607 STLCOPCB4099859 WASTE AUDIT DATA SHEET Department: Date PH Aroclor Department %HC1 [PPM. Or James 6/4 3.2 *10. 2.4 Sampling Point Chlorinator-Sewer #HC1 FOrgam .cs /day /day Prod. Flow Rate Comments 3 j 000 7.2 250 GP i. 6/5 6.2 NDA NDA -- - 6/6 10.8 NDA 1.1 - 3.3 - 6/7 3.6 .09 1.8 .2, 800 5.3 - 6/8 4.1 .10 10.9 3,000 32.8 -' 6/9 2.7 .01 S.O 300 24.0 - 6/10 3.7 NDA 2.0 - 6.0 -- 6/11 5.7 NDA 8.5 - 25.5 - 6/12 3.5 .04 NDA 1,200 - - 6/13 3.5 .04 NDA 1,200 - - 6/14 3.5 .04 NDA 1,200 - - 6/15 4.! NDA NDA -- - 6/16 2.7 .05 NDA 1,500 - .- AVERA 3E #/E AY = 1,100 8.0 -* DSW 378608 _______ L1-------------------------------- --- STLCOPCB4099860 WASTE AUDIT DATA SHEET Department Hcj- DeP^t-m^nt_________ rrn ui Date pH % HC1 ganic: //Organics /Day ifHC1 / dav Sampling Point HC1 Sewer Prod. Flow Rate Comments 5/20 .9 1.1 NDA ~ 13,200 loo gp: 1 5/21 .7 1.7 .5 .6 20, 400 - 5/22 .9 1.2 NDA - 14,400 - 5/23 .8 1.4 .5 6 16,800 - 5/24 .8 2.6 2 2.5 31, 200 - 5/25 .8 2.6 2 2.5 31,200 - 5/26 2.0 .1 4.0 4.8 1, 20C - 5/27 2.4 .1 5.9 7.1 1, 20C - 5/28 1.5 .3 2.5 3.0 3, 60C - 5/29 1.0 .6 12 14.4 7, 20C - 5/30 1.2 .6 7.3. 8.8 7, 20C - 6/2 .4 . 2.3 .1 .10 27,60C - 6/3 .8 1.9 3.3 4.0 22,80G - 6/4 1.1 .7 20 24.0 8, 40C - 6/5 .8 1.3 4.6 5.5 15,60C - 6/6 .8 2.2 8.6 6/7 .7 2.1 5.7 6/8 .9 1.3 5.7 - 10.3 26, 40C 6.9 25, 20C 6.9 15,600 - DSW 378609 STLCOPCB4099861 Depar tment KC1 Department PPm Oi Date pH % HC1 ganics 6/S .8 1.4 KDA WASTE AUDIT DATA SHEET /Day Sampling Point I-1C1 Sev;er Prod. FI ow Rate Comments 16,800 L00GPM 6/10 1.1 .5 5.0 6.0 6, 000 - 6/11 .8' 1.2 6.0 7.2 14,400 - 6/12 .7 1.2 4.5 6/13 .7 1.2 4.5 6/14 .7 1.2 4.5 6/15 .8 .8 5.0 6/16 .2 2.1 1.5 5.4 14,400 5.4 14,400 5.4 14,400 6.0 9,600 1.8. >5,200 - - - - ' . AVERA 3E #/D :\Y = 6.0 15, 000 * * DS'i/V 378610 STLCOPCB4099862 WASTE AUDIT DATA SHEET Department Date PH 5/20 - Aroclor Department PPM Or - 7J1C1 panics - 32 '* - . . ^rgan: rcs /day 35.0 Sampling Point Warehouse Sewer Prod. FI ow Rate Comments 90 GPN 5/21 - - 11 12.0 - 5/22 - - NDA - - 5/23 - - 7.2 5/24 - - NDA 5/25 - - NDA 5/26 - - 25 5/27 - - 7.5 5/28 - - 3.0 5/29 - - 2.7 5/30 - - 4.0 _ 5/31 - _ - 4.0 6/1 - - 4.0 6/2 - - 2.0 6/3 5.8 NDA NDA 7.8 .... 27.0 8.1 8.7 29.2 4.3 4.3 4.3' 2.2 - -' - 6/4 6.4 EDA 15 6/5 6.7 NDA 10 -* 6/6 7.2 NDA 13.3 16.2 11.0 14.4 - - DSW 378611 STLCOPCB4099863 WASTE AUDIT DATA SHEET Department Aroclor Department Date pH 7oHCl PPM Or " ganic ' 6/7 6,4 NDA 32.6 ifOrgan ICS / day 35.2 Sampling Point Warehouse Sev/er Prod. FI ow Rate Comments 90 C-Pl 6/8 6.2 NDA 12.0 13.0 - 6/9 - - 5.0 5.4 - 6/10 - - 8.0 6/11 6.2 NDA 5.0 8.7 5.4 -` 6/12 5.6 NDA NDA - - 6/13 - - NDA - .- 6/14 - - NDA 6/15 4.5 NDA 60 65.0 - 6/16 6.1 NDA 2.5 2.7 - AVER/ c-E #/r 3 11 { !11.4 - -* D SW 378 612 ------------------ STLCOPCB4099864