Document j7DbxXXJ0QV9G2BogEV3vQ5k

5e^-<0-i333 'luoo^wii'iNnid mvil 'll 100 3WI1 QB AIB03H HUMBLE OIL St REFINING COMPANY IMO< CtRAOEU FlitCfBCCRVHICttCINt ODC,NtA*CTXrCiMCT* BATON ROUGE. LOUISIANA 70,21 March 22, 1971 raS7 OFFICE BOX At Hichola Construction Corporation Box 2750 Baton Rouge, Louisiana 70821 Amendment Mo. 1 Contract ME SO104-X 47419 / CT 55104-X 47419 Blanket Cost Plus Contracts Gentlemen; The above referenced blanket cost-plus construction contracts, each dated April 30. 1969 . are hereby amended to revise the entire third paragraph of ARTICLE 14 - CONTRACTOR'S RESPONSIBILITY to read as follows: "Contractor Ehall defend, indemnify, and save Owner, its officers, employees, agents, representatives, and insurers harmless from all claims, for injuries to or death of any and all persons, including without limitation, employees, agents, and representatives of Con tractor or its subcontractors, arising out of or in connection with or by reason of work done by Contractor, its employees, agent6, representatives, or subcontractors under this contract, expressly ' excepting claims, for Injuries or death caused by the sole negligence of Owner, its officers, employees, agents, and representatives." If you are in agreement with this Amendment No. _1___, please sign and return two copies of this letter to us, one for each contract. Very truly yours ACW:EL ACCEPTED: HltZOLS CQHSTKDCnOM C0BF0&AXX0K A. c Cont Pate March 29. 1971 200 08/28/99 TUE 11:09 [TX/RX NO 9884] 004 d`ti `a * rrs 0181 0C8 frOS XVd Ofr:0T NOW 66/TT/OT * .0 triDO 3U INIM . NdJRI '|| -150 3HI1 a3A|333s . Contract Fora BC-lX 25 (4/1/65) I . Contract No. Mg S0104--" X 47415 CONTRACT BETWEEN NICHOLS CONSTRUCTION CORPORATION (Contractor) and HPMBLB OIL & REPINING COMPMtt (Owner) .. , Covering Blanket Contract for Cose Plus Work at Owner's Facilities Bacon Rouge Louisiana Area v coo f Dated: April 30, 1969 09/28/99 TUE 11:09 [TX/RX NO 9884] @005 `0*T1 `a 9 ATH'S 0T91 0C9 fOS XVd 0^:01 NOW 66/TT/OT 'Ll'IDO 3WlI INfild M%'-U 'Ll 130 3WI1~03A1303H Contract No. MS 50104-X 47419 CONTRACT nichols CONSTRUCTION corporation a iouisianacorporation, whose address for the purposes hereof is Box 2750, Baton Rouge, Louisiana 70821, hereafter called "Contractor,11 and HUMBIS oil s refining COMPANY a. Delaware corporation, whose address for. the purposes hereof is P.0- Box 481, Baton Rouge, Louisiana, hereafter called "Owner,1* agree as of April 30, 1969 as follows: , , ARTICLE 1. THE WORK, when requested by Owner, Contractor, in an expeditious and workmanlike manner, shall perform work in Owner's facilities in the Baton Rouge, Louisiana, area of the nature described in the attached Exhibit "A". This contract establishes the general terms end conditions applicable to work performed hereunder. The specific work which Contractor shall perform and say special conditions or specifications therefor shall be described in written letters of authorization issued to Contractor by Owner. Each such letter of authorization shall be Identified wit ai\A subject to all the terms and conditions of this contract. Acceptance of each letter of authorization by Contractor, either by signing the letter of authorization or by commencing the work described therein, shall effectuate a contract between Owner and Contractor for the performance of the work described therein. The "Work" "specifications and "plans" as used hereafter in this contract mean the work-described in each letter of authorization and any specifications and plans issued in connection therewith. This contract shall be effective on the date shown above and shall continue thereafter unless cancelled by either party upon 30 days written notice. Any work covered by letter of authorization accepted by Contractor at the time of notice of cancellation shall be completed, unless terminated by Owner in accordance with the further provisions hereof. ARTICLE 2. INDEPENDENT CONTRACTOR. For the purpose of Contract and all aexvices to be provided hereunder. Contractor shall be, and shall be deemed to be, an independent contractor and not the agent or employee of Owner. Owner--shall not have any authority to supervise the employees, representatives, os subcontractors of Contractor, and the carrying out of Work shall be under the supervision and control of Contractor. Contractor shall have no authority to make any statements, representations or commitments of any kind, or to take any aetion, which shall be binding upon Owner, except as provided for herein or authorized in writing by Owner. ARTICLE 3. TIME OF PERFORMANCE. Time of performance shall be as specified in each letter of authorization. ARTICLE 4. CONTRACT PRICE. Under each letter of authorization, Owner shall pay Contractor, as hereinafter specified, a total price consisting of the sum of all chargeable costs and all fees as provided In Article 5. POO @ 09/28/99 TUE 11:09 [TX/RX NO 9884] 0006 3`T1 `d * MJH`S 0181 0C8 I'OS XVd Ot^OT NOW 66/TT/OT I ---------------------------- ~ nm~a 'll-ioo"awil'iNiiid . nm-u -inoo Immnm ARTICLE 5. COSTS AMD FEES. General The term ''cost", an used with reference ee labor, materials and services furnished by Contractor for the Work, shall consist of only those costs Incurred and paid directly by Contractor for Work. These costs shall exclude any profits to Contractor and shall be Invoiced to owner at net cost to Contractor. Contractor obligates Itself to take advantage of and credit to reimbursable coses all cash and trade discounts, freight allowances and equalizations, annual volume or other allowances, credits, salvages, commissions, Insurance discount dividends or retrospective premium adjust ments, and direct bonifications which accrue to Contractor or which would so accrue except for the fault or neglect of Contractor. All materials, labor, services, and ocher items, the cost of which are actually incurred and paid directly by the Contractor for the Work hereunder, must be certified by Contractor aa being required for the efficient accomplishment of the Work. Owner reserve! the right to provide insurance, materials, equipment, services, and any other such items. Chargeable Costa J Chargeable costs shall include the items so specified in the attached Exhibit A. In addition to the losses and expenaes specifically included in Exhibit A, chargeable costs shall also Include any other losses and expenses actually sustained by Contractor in connection with the Work which are not covered by insurance or by Contractor's Fee, or for which Contractor is not otherwise reimbursed, exclusive, however, of the following: Losses and expenses on account of loss, damage or destruction of construction tools and equipment owned by Contractor or rented from others, regardless of the cause of the loss, damage, or destruction, and whether or not caused by Owner's negligence. . Any expenses which are not reimbursable under Article 17 (Defective Material* and Workmanship); any expenses Contractor may incur on accountof obligations assumed by Contractor under Article 19 (Patents); and any expenses incurred by Contractor due to suspension or termination of the Work which are excludable or non-aeeepcable by Owner as provided by Arcido 21. Fee . Contractor's Fee shall be as provided in the attached Exhibit A. ARTICLE 6. DRAWINCS AND SPECIFICATIONS. All drawings, designs and other written documents supplied by Owner to Contractor shall remain die property of Owner and shall be returned to Owner upon completion of the Work. : All drawings, specifications, requisitions, purchase orders, and ocher pertinent documents prepared by Contractor or its subcontractor pursuant to this Contract shall become the property of Owner and may be used by Owner for any purpose. soo 09/28/99 TUE 11:09 [TX/RX NO 9884] @007 3*T1 '<! * M'M'S 0T8I 0C8 m XVH TP:0T NOW 66/TT/OT rH~I-- * m*** *ms-u 'll 106'" iwii" ini ad Wd9:2l `ll 130 31MU a3AI3D3d ARTICLE 7. INVOICING AMD PAYMENT. As soon as practicable after the end of each monthly period, or ac such other"times as mutually agreed upon with Owner, Contractor shall submit invoices covering chargeable costs incurred during that period and Contractor's fees applicable thereto. Owner, within fifteen (15) days of receipt, shall pay the full amount of the costs and fees shown in these invoices, except to the extent that it is then reasonably apparent that all or part of such costs and fees are not then due. . Contractor's Invoices shall be supported by copies of the Contractor's payrolls and such other supporting data as the Owner may request. Owner may adjust any invoice for cost included on chat invoice or for costs paid on prior invoices which are not properly allowable as costa. Payment by the Owner of costs of che Work, as shown on any Invoice shall not be considered as approval by Owner chat the costs shown are properly allowable as costs. Contractor's records shall account for coses according to classification of accounts furnished by Owner. ' Owner, or its duly authorized representatives, shall have aceess at all reasonable times to personnel, records, and documents of every nature, including, but not necessarily limited to, boohs, boohs of account, records, correspondence, instructions, plans, drawings, reports, vouchers, and memoranda related to the work for the purpose of making audits, including records and .documents of subcontractors and others who provide any labor, equipment and/or materials and equipment hereunder on either a cost-plus or time-and-macerial basis. Contractor and all of its cost-plus sub contractors shall retain all records and documents pertaining to the Work for a period of two years subsequent to its completion for the purpose of audit. Contractor agrees to write che necessary provisions in its contracts with such subcontractors that will assure access hy Owner's employees or representatives to applicable records of such subcontractors. ARTICLE 8. TAXES. Contractor shall be fully and exclusively responsible for che payment of (1) all taxes imposed by reason of the Work, including, but not by way of limitation, all sales and use taxes, licenses, fees, income, franchise and personal property taxes; and (2) all employment taxes or contributions imposed by law or trade union contracts or regulations with respect to or measured by the compensation (wage, salary, or ocher) paid to employees of Contractor and Its subcontractors for work covered by this contract, including, but not by way of limitation, taxes or contributions for unemployment compensation insurance, old age benefits, welfare funds, pensions and annuities, and disability insurance. Contractor shall defend, indemnify and hold Owner harmless from any liability for failure to pay any and all such taxes or contributions or Interest or penalties. Contractor shall timely file with the Louisiana Tax Commission all reports and information required by the Commission covering the period or periods Contractor is engaged in performance of this contract. Contractor shall include in all subcontracts a requirement that the subcontractor likewise shall file all reports and information required by the Louisiana Tax Commission for the period or periods the subcontractor is engaged in work covered by this contract. ARTICLE 9. COMPLIANCE WITH LAW. Contractor shall comply, and secure compliance by lte subcontractors, with all applicable law in connection with Work hereunder. It shall be che duty of Contractor to ascertain whether the drawings and specifications are at variance with the law before starting construction. If Contractor discovers any variance with che law and the drawings and spcelfiencions, it shall promptly 09/25/99 TUE 11:09 [TZ/RX NO 9884] @008 900 *0*T1 `d 3 M`H`S 0181 0C8 t-OS XVd TP: 0T NON 66/TT/OT WM-l\ 'll 130 3WU lNIHd m%-U 'll 100 3WII 03AI303H notify Owner In writing, and the necessary changes shall be made before proceeding with the part of Work affected. Contractor shall obtain all tcaporary permits necessary for the prosecution of Work, and shall give all required notices. Should Contractor violate any law. Contractor shall defend. Indemnify and hold harmless Owner from any liability or penalty which may be imposed on Owner by reason of any alleged violation of law by Contractor or ics subcontractors and also from all claims, suits or proceedings that may be brought against Owner arising under, growing out of, or by reason of Work with respect to such alleged violations of law whether brought by employees of Contractor, by third parties or by national or state governmental authority or any political subdivision thereof. , "Lou`' includes any lav (national, state, municipal, local or other) and any requirement or regulation of any Governmental Authority. "Governmental Authority" includes any national, state, municipal, local or ocher governmental authority or agency. ARTICLE 10. FAIR AND EQUAL EMPLOYMENT. Owner Is an Equal Opportunity Employer. It is agreed as a condition of this agreement as follows: A. That in the performance of this agreement. Contractor shall not engage ln! . any conduct or practice which violates any applicable law, order, or regulation prohibiting discrimination against any person by reason of his race, color, religion, national origin, sex, or age. - B. This is a subcontract subject to the rules and regulations approved by the Secretary of Labor under Executive Order 11246, as amended. C. A copy of the Equal Opportunity and Nondiscrimination Provision of Seetlon 202 of Executive Order 11246 is stated in full below and is made a part hereof. Equal Employment Opportunity Provision During the performance of this contract, the Contractor agrees as follows: ' 1. The Contractor will not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin. The Contractor will take affirmative action to ensure that applicants are . employed, and that employees are treated during employment, without regard to their race, religion, color, sex, or national origin. Such action shall include, but not be limited to the following: Employment, upgrading, demotion, or transfer, recruitment or reerulement advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the pro visions of this nondiscrimination clause. - 2. The Contractor will, in all solicitations or advertisements for employees ' placed by or on behalf of the Contractor, state that all qualified appli cants will receive consideration for employment without regard to race, religion, color, sex, or national origin. zoo 09/28/89 TUE 11:09 [TX/RX NO 9884] &009 `0`T1 `d 9 M'H'S 0T8Z 0C8 m XVd ZJ^OT NOW 66/TT/OT "" 'mn-ii m i3o""3wii'iN'ind WM'U ii loo '3wii mum 3. The Contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided by the agency contracting officer, advising the labor union or workers1 representative of the Contractor's commitments under Section 202 of Executive Order 11246 of September 24, ' 1963, and shall post coplee of the notice in conspicuous places available to employees and applicants for employment. 4. The Contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. . 5. The Contractor will furnish all Information and reports required by Executive Order 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by che contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, end orders. i 6. In the event of the Contractor's noncompliance with the nondiscrimination clauses of this contract or with any of such rules, regulations, or orders, this contract may be cancelled, terminated, or suspended in whole or in part and che Contractor may be deelared ineligible for further Government contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law. , 7. The Contractor will include the provisions of paragraphs 1 through 7 In every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon eaeh subcontractor or vendor. The Contractor will take such action with respect to any subcontract or purchase order as the contracting agency may direct as a means of enforcing such provisions including sanctions for noneeapliance: Provided, however, chat In the event the Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor sa a result of such direction by the contracting agency, the Con tractor may request che United States to enter into such litigation to protect the interests of Che United States. Contractor acknowledges chat he may be required to file Standard Form 100 (EE0-1) promulgated jointly by the Office of Federal Contract Compliance, che Equal Employment Opportunity Commission and Plane for Progress with Joint Reporting Committee, Federal Depot, Jeffersonville, Indiana, within thirty (30) days of the date of contract award if such report has not been filed for the current year and otherwise comply with or file such other compliance reports as may be required under Executive Order 11246, as amended and Rules and Regulations adopted thereunder. Contractor further acknowledges that he may be required to develop a written affirmative action compliance program as required by the Rules and Regulations approved by the Secretary of Labor under authority of Executive Order 11246 and supply Owner with a coov of such orOcram if Owner so ronusrs. _ . __ _ -- _ . 09/28/98 TUE 11:09 [TX/RX NO 9864] @010 800 `D`T1 `d 9 M`3TS 0T81 0C8 m XVd Cl^OT NOR 66/TT/OT DMS'-Zl 'll 100 3WU mu Wd9S;3l 11100 3WU 03AI303H X>. By accepting this agreement, Contractor agrees to be bound thereby. E. If a Certification of Nonsegregated Facilities signed by Contractor has sot been received by Owner at the time this instrument is executed. Contractor agrees to complete and forward promptly such Certification to Owner for Inclusion in Owner's files prior to performance under this agreement, and such Certification of Nonsegregated Facilities when executed shall be incorporated Into this agreement by reference. ARTICLE 11. CONTRACTOR'S PERSONNEL. The regular working schedule of Contractor's employees and employees of a subcontractor working hereunder at the site shall be forty (40) hours per week, eight (8) hours per workday, Mondays through Fridays (both Inclusive); no work on Saturdays and Sundays or on the holidays stipulated in labor contracts applicable to Contractor's and subcontractor'a employees, except on prior written approval of Owner. No employee of Contractor or of any subcontractor doing work hereunder under a sub contract shall work overtime except upon prior written approval of Owner. Overtime is work which is outside of the employee's regular working schedule or vhleh is paid for at a rate in exeeaa of straight time rate. Upon request of Owner st any time. Contractor shall immediately furnish Owner a list showing the name and address of its subcontractors, of the employees of the Contractor and its subcontractors, and of all others who have performed or will perform services under this contract. . . Owner may refuse a particular person admission to its premises. If Owner designates any particular person for exclusion from performing services under this contract, Contractor shall promptly exclude such person. Contractor shall require every person entering Owner's premises to perform services under thio contract to be identified by badges satisfactory to Owner. These badges shall be fumiahed by Contractor at its expense and must be worn at all times by Contractor's employees* At Owner's request. Contractor shall also require every person entering Owner's premises to perform work hereunder to be identified by a complete fingerprint record. ' Contractor shall comply with regulations and requirements established by Owner with respect to Contractor's employees, subcontractors and the employees of subcontractors, and all others engaged or to be engaged in Work on Owner's premises. Contractor shall require Its employees and employees of its sub contractors, who work on Owner's premises to go to and from Work Site via a route within said premises prescribed by Owner and not to deviate therefrom. ARTICLE 12. GENERAL CQNPITONS. Contractor shall have a competent Superintendent satisfactory to Owner on the Work Site at all times. The Superintendent shall represent Contractor and all directions given to him shall be binding on the Contractor. If any work by Owner's forces or by other contractors employed by Owner is contiguous to the Work, the respective rights of those involved shall be established by Owner to assure general harmony. Insofar as shall be feasible and practicable. Contractor shall give preference to Louisiana labor, material and services. Contractor shall,reauire these same _ 09/28/89 TUE 11:09 [TX/RX NO 9884] @011 600 @ `0*1*1 `d 9 M`X`S 0181 0C8 *0S XVd Cl'tOT NOW 66/TT/OT mtt-u `ii 100 awn mu ` . m%'ll 'll 100 3WI1 Q3AI333}) preferences from subcontractors ia all subcontracts under this contract. Residents of Louisiana shall be given preference among persons hired at the site of the Work to the extent possible under applicable labor contracts and consistent with the skills needed. ARTICLE 13. SAFETY REGULATIONS. Contractor shall comply with all fire and safety regulations prescribed by Owner. Before starting construction work. Contractor shall obtain from Owner eoples of these regulations and become familiar with them. Contractor shall provide proper night lights, and shall be responsible for and in direct control of the use of any and all lights, torches, forges and ocher fires. Compliance with Owner's fire and safety regulations shall not relieve Contractor of its obligation elvays to use due care in performing vork hereunder. Contractor shall furnish Owner a written report of any disabling injury to, or fatality of, employees of the Contractor or Its subcontractors* ARTICLE 14. CONTRACTOR'S RESPONSIBILITY. Contractor shall be responsible for all construction tools and equipment, inclusive of all motor vehicles, ^ owned by Contractor or rented from others used in connection with work here- * under, and shall Indemnify and save Owner harmless from any claim for damage, destruction, or loss thereof from any cause whatsoever, including, without limitation. Owner's negligence. ' Contractor shall be responsible for any loss of or damage to existing structures and ocher properey belonging to Owner or for which Owner is responsible (other than the Work) and for any loss or damage to property of others arising out of or in. connection with or by reason of work done by Contractor, its employees, agents, representatives or subcontractors under this contract, expressly excepting any loss or damage caused by the sole negligence of Owner, its employees, agents or representatives. Contractor shall be responsible for all claims for injuries to or'death of any and all persons, including, but not limited to, employees, agents 'and servants of Contractor or its subcontractors, arising out of or in connection with or by reason of work done by Contractor, its employees, agents, repre sentatives or subcontractors under this contract, expressly excepting any loss or damage caused by the sole negligence of Owner, its employees, agents or representatives, subject to the provisions of the succeeding paragraph. Contractor*3 responsibility for damage to property and injury to or death of persons as sec forth in the preceding paragraphs of this article Includes damage, injury or death caused in whole or In pare by any machinery, tools or equipment belonging to Owner and used by Contractor, or its subcontractors, lu the performance of this contract, or caused by acts of any employee of Owner while such employee is acting under the direction or control of Contractor or its subcontractors and in it3 behalf carrying out for it any work to be performed under this contract. ARTICLE 15. INSURANCE. Contractor shall earry and maintain Insurance under terms and with companies satisfactory to Owner, as follows: Workmen's Compensation and Employer's Liability Insurance for all of Contractor's employees engaged in the performance of this contract. If any of the Work is 010 08/28/99 THE 11:09 [TZ/RZ NO 9884] 0012 *D`T1 `d 9 M`X`S 018L 0C8 *0S XVi pp:0T NOW 66/TT/OT mwii 'll loo'^wii'iNiad mvu *ii *ioo awil aaAiaoaa *" sublet. Contractor shall require the subcontractors eo provide Workmen13 Compensation and Employer's Liability Insurance for the latter's employees, unless such employees are covered under Contractor's insurance. Contractor's Public Liability, and, in addition, if any of the Work is sublet. Contractor's Protective Liability Insurance for amounts not leas than $100,000 to cover injury or death of one person and not less than $300,000 to cover all persons injured or killed as a result of one accident, and for an amount not less chan S100,000 to cover loss or damage to property resulting from one accident. Automobile Liability Insurance (required only if motor vehicles are used in the performance of the Work) for an amount not less than S100,000 to cover injury or death of one person and not less than $300,000 to cover all persons injured or killed as a result of one accident, and for an. amount not less than $25,000 to cover loss or damage to property resulting from one accident. . contractor shall have its insurance carrier or carriers furnish to Owner certificates certifying Chat all insurance required under this Contract is In full force and effect, reciting the expiration data of each policy and that the insurance will not be cancelled without ten (10) days prior written notice by registered mail to Owner. On request. Contractor shall permit Owner to examine the original insurance policies. If the insurance required herein is cancelled, Owner may procure it and deduct the cost from moneys Chen due or thereafter to become due Contractor. In the event any third party claims are filed against Contractor and such claims are not covered by Insurance or are in excesa of che amount of insurance applicable. Contractor shall immediately notify Owner concerning such claims. Contractor shall defend itself and Owner against such claims and Owner shall pay che expenses for such defense, Co che extent that such expenses are not recovered from the Insurance carrier, as a reimbursable cost of che work. However, Contractor shall consult with and obtain approval from Owner concerning all details of the defense against such claims or any negotiations for settlements. Owner shall have che privilege of joining with Contractor in any such defense or In any negotiation for settlements, and Contractor agrees to cooperate fully In such defense and negotiations. ' Contractor shall not commence field construction work under this contract nor penult any subcontractor to commence field construction work on a subcontract until all of the insurance required under this Article shall have been obtained by Contractor end approved by Owner. ' Contractor shall not be required to furnish insurance other chan, or in excess of, the minimum amounts above stated, but Owner shall have Che benefit of all ocher or excess insurance which Contractor may have in effect. Except to the extent of Insurance which Contractor la required to carry hereunder and except to the extent of any additional coverage which Contractor may have in effect, chough not required to carry. Owner shall be responsible for and shall indemnify and hold Contractor harmless from any losses, damages, and claims of any nature and kind whatsoever sustained by Contractor in connection with the Work; provided, however. Owner shall not be responsible for, nor indemnify Contractor from, the losses and expenses which are excluded from chargeable costs under . Article 5 - Cost and Fees - hereof. The losses, damages, and claims in excess 08/28/99 TUE 11:09 [TX/RX NO 9884) 121013 D`T1 `d 9 M`S`S 0181 0C8 frOS XVd n = 0T NON 66/TT/OT nm-ii 'it 130 3WU lNIHd M9:[ `[i loo 3wu aunm of che Insurance coverages of Contractor for which Owner herein assumes responsibility and indemnifies Contractor from; include, but are not limited co, actions by third parties or other insurers. Ineluding Insurers under policies paid for by Owner or for Owner's benefit, whether or not such losses, damages, or claims involve damages to Contractor's property, Owner's property, or property of others, other than construction tools end equipment (inclusive of all motor vehicles) owned by Contractor or rented from oehers, or Involve personal injuries to any person whomsoever. Including but not limited to employees of Owner, Contractor, or e third party. It is the intention of the parties chat che losses, damages, and claims in excess of che insurance coverages carried by Contractor for which Owner herein assumes responsibility and agrees to indemnify Contractor from applies even If sueh losses, damages, and claims should reaulc from the negligence of Contractor or any of Contractor's employees or any other person for whom Contractor is responsible. j < ARTICLE 16. INSPECTION. Owner, at any time, may inspect any part ef the Work, che materials Co be used in the Work and the construction tools and equipment furnished by Contractor and its subcontractors for use in performing the Work. Contractor shell give Owner timely notice when parts of the Work which are required to be tested or approved are ready for test or inspection, and Owner shall promptly test or inspect. . If any tool or item of cons trueCion equipment furnished by Contractor or its subcontractors is, in the opinion of Owner, unsafe, it shall be replaced or repaired to Owner's satisfaction by Contractor. However, neither inspection by Owner nor che failure by Owner to inspect shall relieve Contractor of its obligation co provide construction Cools and equipment which are safe and adequate in all respects. . ARTICLE 17. DEFECTIVE MATERIALS AND WORKMANSHIP. Contractor shall repair or replace, as may be necessary during the progress of che Work, materials and equipment furnished or any workmanship performed by it or its subcontractors which do not conform to che plans and specifications. Contractor shall also repair or replace defective materials, equipment or workmanship discovered within one (1) year from che dace of final acceptance of the Work or within one (1) year from the date of first use by Owner of any self-contained system in the Work, whichever is earlier. If the Work or any part ehereof la terminated prior to completion, Contractor shall repair or replace defective materials, equipment or workmanship discovered within one (1) year from the effective date of termination. If Contractor's field force has been removed from the Work Site, Owner sc its option may undertake such repairs or replacement, but such action shall not relieve Contractor of its responsibility to complete Che necessary repairs or replacements as above provided at Owner's request. Materials, labor, services and other expenses incurred by Contractor -necessary co repair or replace defective materials or equipment or workmanship shall be allowed os chargeable costa under. Article S except that reimbursements of sueh expenses shall not be allowable for cost of repairs or replacement which is recoverable on vendor's guarantee or where such defects of materials, equipment or workmanship are due to the failure of Contractor's corporate officers, or other representatives having supervision or direction of the Work as a whole ZT0@ 09/28/99 TOE 11:09 [TI/RI NO 9884] @014 D`T1 `d 3 M`H`S 0T8Z, 088 MS XVd p:0T NOR 66/TT/OT nm-ii 'ii 100" BWiI'iNu'd mt-u 'irioo 3wu a3AlTo3>i' ` co observe the standard of cera vhleh Contractor normally exercises in the conduct of its business. For any work which is a chargeable coat under this Article, Contractor shall receive only such additional fee as represents Contractor's expenses not chargeable as costa. Contractor shall not be responsible for material or equipment which fails as a result of wear and tear, corrosion or erosion, resulting from operating conditions more severe than contemplated in the plans and specifications. ARTICLE 18. LIENS. Owner may retain out of any payments due Contractor an amount sufficient to indemnify Owner against any lien or elalm chargeable to Contractor for which it appears Owner or its property may become liable. Unless Contractor timely furnishes Owner a release of the lien or claim. Owner may pay it out of moneys so retained or out of payments that may thereafter become due Contractor. If any lien or claim against Contractor remains unsatisfied after all payments hereunder have been made to Contractor, Contractor shall refund to Owner any amounts Owner may have to pay to have the lien or claim released. ' ARTICLE 19. PATENTS. Contractor shall defend and hold Owner harmless from any elalm made against Owner and alleging infringement of any patent or patents, to the extent chat such alleged infringement arises from: (1) performance of the Work by Contractor or (2) use by Owner cf materials or designs supplied by Contractor and not expressly specified by Owner* Contractor agrees to grant and hereby grants to Owner an Irrevocable, non-exclusive, royalty-free license, under any patent rights now or hereafter owned or controlled by Contractor, to use the facilities resulting from Che Work and to sell anywhere In the world the products made by such uaa, together with the right to extend such license to any successor In title to Che facilities resulting from the Work. Contractor hereby grants tc Owner an irrevocable, non-exclusive, royalty-free license bo use, anywhere in the world, any invention made by Contractor or its employees in or aa a result of performance under this Contract and based upon Information (not In the public domain at the time such invention is conceived) which is disclosed to Contractor by Owner. Owner may extend this license to any company of which Standard Oil Company {New Jersey) owns at lease 50Z of the stock having the tight to vote for directors thereof, and to Toa Nenryo K.K.K. (a Japanese corporation) and lea wholly-owned subsidiaries. ARTICLE 20. CONFIDENTIAL INFORMATION. Contractor agrees Chat it will not disclose to Owner any Information related to the Work which is considered by Contractor to be confidential, or which Contractor possesses under obligations of confidence to third pareies, unless Owner has, prior to such disclosure, agreed In writing to accept such information aa confidential under elearly defined obligations of confidence, and thae in the absence of such agreement in writing all information disclosed by Contractor to Owner in connection with the Work Is to be deemed to be non-confldential information. Contractor agrees to hold in confidence and not to disclose to others any information disclosed to Contractor by Owner in connection with the Work, except for such information as is or may become (through no fault of Contractor) part of the public domain. Contractor further agrees that information chua held in confidence will not be used by Contractor without Owner's written consent. These obligations of confidence and non-use shall survive completion of the Work or termination, of this Contract. - 10 - 09/28/99 TUE 11:09 [TX/RX NO 9884) 12)015 '0*1*1 `d 9 M`H`S 0T8Z, 0C8 t-0S XVd SJ^OT NOW 86/TT/OT mfau 'ifioo iwuiNfad- wd9:n moo ,mlm\hif"LO' ARTICLE 21. SUSPENSION AMD TERMINATION OP WORK, Owner at any time, by written notice to Contractor, nay suspend or terninate any work then being parfamed by Contractor hereunder. If work la suspended, Owner ahalX pay Contraeeor In accordance with Article 5 (Costa and Fees) CD expenses Incurred for enployeea necessarily retained by Contractor during the period of suspension, provided Contractor can shew that It was not reasonably practicable to move these employees to other points where they could have been employed and (2) rental charges for construction cools and equipment furnished by Contraeeor for the Work which are necessarily idle during such suspension. If work is terminated, toner.shall pay Contractor all ehargeable coats incurred to dace of termination and the applicable fee. Zn the event of suspension or termination, in addition to the payments above provided fori Owner shall pay Contraeeor such other costs or expenses to Contraeeor resulting from the suspension or termination, as mutually agreed upon, provided toner shall not be liable to Contractor for any damages or loss of anticipated profit resulting from the suspension or termination. ARTICLE 22. RPiOVAL OF EQUIPMENT. Upon termination of this contract. Contractor, If eo requested by Owner, shall promptly remove all or any part of Its equipment and supplies from the property of Owner, and on Contraeeor*s failure to do so. Owner may remove and store such equipment and supplies at the expense of . Contractor. ' ARTICLE 23. ASSIGNMENT OF CONTRACT. Contractor shall not assign or sublet this contract, or any part thereof, (except for the delivery of material) without the prior writtea consent of Owner. Such consent shall not release or relieve Contractor from any of its obligations or liabilities under the contract. Owner, without the consent of Contractor, may assign this contract eo any corporation, affiliate or subsidiary of Standard Oil Company, a New Jersey corporation. , ARTICLE 2$. NOTICES. Exeept as otherwise specifically provided in this contract, any notice by Owner to Contractor shall be mailed to Contractor sc its office address sec forth above or delivered personally to Contractor's superintendent, and any notice by Contractor to Owner shall be mailed to Owner at its office addreaa set forth above or delivered personally to Owner's authorised . representative. This contract shall Inure to the benefit of and be binding upon the legal repre sentatives and successors of the parties hereto. IN WITNESS WHEREOF, the parties hereto have executed this contract as of the date and year first above written. NICHOLS CONSTRUCT!Pi CORPORATTQW (Contraeeor) HO *0`T1 `d 9 M`H`S Om 0C8 POS XVd 9H0T NOW 66/TT/OT 'll 100 3WI1 lNlHd Wd9Vl\ `ll -Derail1.01 3SA3IiW3D<*3-rX* 47419 EXHIBIT A A. The Work - Construction work, including the furnishing of all labor, supervision, tools and equipment, temporary building and facilities, construction supplies, transportation, field material procurement service and incidental materials required B. Chargeable Costs 1. (a) Wages and salaries of all Contractor's employees engaged in the actual - construction of the temporary and permanent facilities at the job site, ` including skilled and unskilled labor, sub-foremen, craft foremen, and Contractor's field supervisory and field office personnel. . (b) Wages and Salaries of Contractor's employees excluding indirect shop labor,' engaged in pipe and pipe support fabrication done by pipefitters in Contractor's shop. ` (c) Wages and Salaries of Contractor's employees engaged in drafting, detailing and listing materials for all types of shop work as authorized by the Owner. (d) wages and Salaries of Contractor's employees, excluding indirect shop labor, engaged in steel fabrication done in Contractor's shop. This will include time spent by non-working foremen, as well as actual time spent in shop fabrication. (e) Not chargeable as wages and salaries without Owner's prior written approval are the amount of compensation paid to Contractor's field supervisory and field office personnel and any amount by which compensation paid to other employees of contractor or of any subcontractor exceeds prevailing rates for the area where the Work is to be performed and any amount paid to any employees of Contractor or any subcontractor adopting a policy with respect to absences with pay which is more liberal than the practice prevailing in the area where the Work is to be performed. (f) Not chargeable as wages and salaries are; salaries of Contractor's executive officers and home office personnel. 2. Premium Pay bn overtime, when such overtime is authorized by Owner. 3. Indirect Labor Costs paid with respect to wages and salaries paid under B.l (a), (b), (c), and (0) above, t Contractor's employees engaged in the work including, but not by way of limitation, required payments to union heal th and welfare funds and other fringe benefits covered by bargaining agreements and federal and state unemployment insurance and RCA taxes at net cost to Contractor. Excluded are any benefits, not required by law, paid with respect to wages and salaries paid to Contractor's staff and supervisory personnel. 4. Cost of Qualifying Welders as determined by invoices rendered contractor by the welder testing laboratory. 5- Cost of Construction Materials furnished by Contractor, inclusive of transporta tion charges"to job site, and "sales and use tax applicable thereto. Excluded specifically are small tools costing less than $300.00 each, and consumable supplies as shown on Exhibit B. All purchases by Contractor or any of its subcontractors in excess of $100.00 shall have prior approval of Owner. ST0 - 1- 09/28/89 TUE 11:09 [TX/RX NO 9884 J @017 `O'Tl `d V Ik'TS 0T8L 0C8 MS XVd 9l-:0T NOW 66/TT/OT xhibit A ~~ Wdfi:tl 'll 100 ilTlfi^d M%-1\ 'll 100 3WU Q3A1333H 6. Cost of All Subcontracts approved by Owner. All lump'sum subcontracts shall be on & bid basis and be approved by Owner. 7. Cost of Sandblasting carried out at Contractor's shop in connection . with shop fabrication work. This shall be billed on tbe following unit price basis with the price covering the cost of sandblasting plu6 application of one coat of primer. Sand shall be furnished by Contractor at its expense; primer shall be furnished by Owner at its expense. Material Steel Pipe Unit Price 4-l/2c7pound 4t/pound 8. A Charge for All Equipment used in the performance of the work (exclusive of that used la Contractor's fabrication shop) with a unit cost of $300.00 or more at the rates shown on Exhibit C. If equipment other than the equipment listed on the schedule is required. Contractor shall submit rates for Owner's approval prior to use. On equipment rented by Contractor from others, sales and use taxes payable by Contractor and fuel costs. If applicable, shall be chargeable costs. 9. Coat of Repairs and Replacements required because of defective materials and workmanship, as provided in Article 17. 10. All Taxes, in addition to sales and use taxes on materials and payroll taxes, directly imposed on Contractor by reason of the Work. C. Contractor's Fees 1. On all wages and salaries chargeable as costs under paragraph B-l (a) ` of this Exhibit A, Contractor's fee shall be as outlined below: a. 202 for single shift jobs b. 22.52 for jobs scheduled for more than one shift The fee shall include, but not be limited to. The following items: (a) Contractor's profit. . (b) All home office supervision and general overhead, including interest on borrowed capital. (c) All small tools costing less than $300.00 each. (d) All consumable supplies as described in Exhibit B. (e) All field office equipment, supplies, and expenses, excluding salaries of field office personnel. () Contractor's expenses in providing badges and fingerprint records for Contractor's employees. -` 09/28/89 TUE 11:09 [TX/RX NO 98841 @018 9T0@ `d M'H'S 0T8Z 088 m XVd LV0T NOW 66/TT/OT xhibit A mtt'U 'll 100 3WI1 INIHd- Wd9Rl 'll'100 3WI1 Q3AI3338 (e) AH indirect shop labor, such as shop superintendent, clean-up labor* and coordinator of materials, drawings and schedules* (d) All shop tools and shop equipment. (e) All consumable supplies as described by Exhibit B plus such major consumable items as welding rod (stock and wire), welding and cutting gases* utilities and telephone service. () Supplies and equipment required for all engineering, drafting and office uses. (g) Use of Contractor's shop building and all associated facilities, excluding sandblast equipment. (h) Employee benefits, such as retirement plans, vacation allowances, and costs of' hospitalisation or hospitalisation insurance for Contractor's permanent staff and supervisory personnel engaged in the work, but excluding holiday pay when the job is shut down for the holiday and permitted absences when approved by Owner's Field Engineer. . (i) Contractor's Standard Insurance coverage, which coverage shall not be less than the coverage and amounts Contractor is required to carry under this contract. t 4. On all construction materials and welder qualifications furnished by Contractor as covered by paragraph B.4 and 5 of Exhibit A, Contractor's fee shall be five per cent (5%). 5. On all subcontracts as covered by Paragraph B.6 of Exhibit A, Con tractor's fee Shall be five per cent (5%), except a fee shall not be charged when Contractor subcontracts to National Instrument Company. no `0`T1 `d S 00/28/98 TUE 11:00 [TX/RX NO 0884] 0019 0T8i 0C8 m XVd IK-01 NOW 66/TT/OT , Exhibit A mti'U 'll 100 3WIi iNIUd . M9Vl\ 'll 100 3WU fl3AI303 (h) Employee benefits, such aa retirement plane, vacation allowances, and costs for hospitalisation or hospitalization insurance for Contractor's permanent staff and supervisory personnel engaged in the Work, but excluding holiday pay when the job is shut down for the holiday and permitted absences when approved by Owner's field Engineer. (i) Premiums on Contractor's Standard Insurance coverage, which coverage shall not be less than the coverage and amounts Contractor Is required to carry under this contract. 2. On all wages and salaries as outlined under Paragraph B-l (b) and (c). Exhibit A, Contractor's fee shall be 74%. The fee shall include, but not be limited to the following items: - (a) Contractor's profit (b) All heme offiee supervision and general overhead, including interest on borrowed capital, * (c) All indirect shop labor, such as shop superintendent, non-working foreman, clean-up labor, and coordinator of materials, drawings and schedules. (d) All shop tools and shop equipment. (e) All consumable supplies as described by Exhibit B plus such major consumable items as welding rod (stock and wire), welding and cutting gases, utilities and telephone service. (f) Supplies and equipment required for all engineering, drafting and office uses. (g) Use of Contractor's shop building and all associated facilities, excluding sandblast equipment. (h) Employee benefits, such as retirement plans, vacation allowances, and costs of hospitalisation or hospitalization insurance for Contractor's permanent staff and supervisory personnel engaged in the work, but excluding holiday pay when the job is shut down for the holiday and permitted absences when approved by Owner's Field Engineer. . (1) Contractor's Standard Insurance coverage, which coverage shall not be less than the coverage and amounts Contractor is required to carry under this contract. 3. On all wages and salaries as outlined under Paragraph B-l (d) of Exhibit A, Contractor's fee shall be 60%. The fee shell include, but not be limited to the following items: (a) Contractor's profit. (b) All home office supervision and general overhead. Including .interest on borrowed capital. 08/28/99 TUE 11:09 tTX/RX NO 9884] @020 $T0@ 3`T1 `d 'S M'H'S 0T81 0C8 m XVd NOW 66/TT/OT ' 'll *106--3Wii'lNlW - "Wd9E:Zl 'll `IDO 3WU Q3AI303S contract Pom rc-LA 25 (4/1/69) EXHIBIT B Contract MB 50104-X 47419 . CT 55104-X 47419 CQWB0MABU3 50FPUES Consumable supplies are those supplies consumed during the progress of the Work vhich are not directly Incorporated Into any work of a temporary or permanent 'nature. It Is understood that several items have multiple end uses and, there* fore, in specific situations may he classified as materials of construction or consumable supplies, depending on actual use. The following list, although not all-inclusive, is considered to be representative of the type of items capable of being consumable supplies. Acids Adapters Adhesives Alcohol Babbitt .Badges Bags, Water Bands, Elastic Helmet Barrels, Trash Barrels, Water Batteries Belting Belt Dressing Bits Blades, Cutting Brads Brooms Brushes, Paint, Scrub and Wire Bulbs, Light Cables Cans Carbide Carborundum Chalk Chamois Chisels Clamps Cleaning Compound Clips Cloth ing Coal and Coke Connectors Cord . Cotter Pins Couplings Crayons Creosote Cups Dies Dippers Drills Hacksaws and Blades Handles Hasps Helmets Hoods, Welder Hinges Hooks Hose . Hydrated Lime Electrode Holders Kerosene Ells, Stove Pipe Extractors, Screw , Keys Lanterns Face Shields latches Fasteners Lenses Faucets levels Files Lighters Filters Line, Chalk Fittings, Alemite .and Hose Liquefied Petroleum Gas Flashlights lugs Flints Flux, Sraslng Masks, Gas Funnels Mandrels Fuses _` Gaskets, Hose . Measurers . Menders, Hose Mirrors Gasoline Mops Glasses Globes, Lantern Nails Gloves Needles, Acetylene - Glue Nipples, Hose Glycerin Nozzles Goggles Graphite Grease Grinding Compounds Grinding Wheels 09/28/99 TUE 11:09 [TX/RX NO 98841 0021 D*TT M V M`H`S 0T81 0C8 08 XVd 81^01 NOW 66/TT/OT IMS:1 'll'130 3WU lNIM Exhibit b - Page 2 mn-U 'll 130 3WIJL Q3AI333H Contract Fora rc-LA 25 (4/0/69) 011b, Lube -Oils, Cutting - Oils, Diesel Oils, Fuel ' - . Padlocks Pails ' Paper, Sana, Toilet, Writing, etc. Paste '- Patterns Pencils Pins, Drift Pulleys Punches Bags Rakes Respirators Rollers Rope Rubber Boots Rules . Safety Goggles Salt Tablets and Dispensers Sandpaper . Save Screens Screws . Shields, Face Soap Soapstone Solder Stakes Stencils ' Stove pipe .Supplies, Medical Supplies, Office Supplies, Wash Room ' Tacks ' Tags Tapes Taps, Bolt Tarpaulins Thimbles, Wire Rope Tips, Cutting and Welding Tovels Twine Washers Wastes, Wiping Water, Drinking Wedges Wheels, Cutting, Grinding, and Emery Wire NOTE: Lubricants required for breaking in and operation of process equipment shall be supplied by Owner. ' .. 09/28/89 TOE 11:09 [TX/RX NO 9884] 0022 *D*T1 `d 9 M`H`S 0181 0C8 *0S XVI 6*:0T NOW 66/TT/OT Mtt'll ll'lOO 3WU INISd VIM-U EXHIBIT C SgOIFMBWT BATES 'll 130 3WI1 Q3AI333H . contract Form RC-L& 25 (4/1/69) Contract kE 50104-X 47419 CT S5104-X 47419 All equipment is to be fueled, maintained, and operated fay Contractor. In addition to the rates herein shown,, the operators* wages and salaries are chargeable costs under paragraph B-l of Exhibit A. All equipment shall be delivered by Contractor to the Work site when and as needed for use. For the purpose of the rates herein specified, time for selfpropelled equipment shall begin when the equipment leaves Contractor's storage yard and shall terminate upon return to their yard unless an agreement to the contrary is reached by the Owner and Contractor. Time for equipment that must be hauled to the Work site shall begin when actual use of the equipment in connection with the Work begins and shall terminate upon cessation of such use. Vo charge shall be made on any equipment which is in transit or out of service for repairs for more than 24 hours. For minor routine repairs, the cost of labor shall be chargeable to the Work and reimbursible as labor under the contract, The cost of all repair parts and supplies are included in the equipment rates and shall not be chargeable directly to the Work. * When the total labor required to repair an item of equipment exceeds four roanhouse, the cost of all labor, repair parts, and supplies are included in the equipment rates, and shall not be chargeable directly to the work. Owner's prior approval shall be obtained for the proposed date of arrival of equipment at the Work site. Any item of equipment no longer needed for the Work shall be removed from the work site or, with consent of Owner, stored on Owner's property and thereafter no rent shall be charged. Equipment is subject to inspection by Owner and Contractor shall remove and replace any item found unsafe. Contractor shall maintain a perpetual inventory of construction tools and equipment costing S300.00 or more. Bates listed are monthly rates, unless otherwise specified, daily rates shall be the1 monthly rate divided hy twenty-two (22), and there shall be no time less than one (1) day. Also, rates are based on eight-hour work day plus incidental unscheduled overtime. Transportation Costs Transportation costs to and from the job site shall be paid by Owner: (a) for all equipment owned by Contractor provided such cost shall be the actual cost determined by application of rates and fees outlined in this contract, but not to exceed the cost of transportation from and to Contractor's storage yard, except for large crawler cranes and tractors where a mutually agreed upon basis shall apply. ` (b) for all equipment rented from third parties provided such cost shall be approved by toner prior to rental of said equipment by Contractor. - 109/28/99 TUE 11:09 (TZ/RZ NO 9884] @023 TZO @ `D'Tl `d 9 M`M`S om 0C8 frOS XVd OT NOW 66/TT/OT ---------Wd&ll 'll'iOO^iWlIiNiad. - Exhibit C - Pago 2 . VU%:1\ 'll 100 3WI1 03AI303^ Contract Form RC-LA 2! . (4/1/69) In both (a) ana (b) above, the costs of unloading, assembly, and placing in commission on arrival at the work site and for disassembly, boxing, and loading in preparation for shipment from the Work site, excluding in each case all costa for reconditioning, are also chargeable to the cost of the Work where such is necessary. . Equipment Rates for Miltiple Shifts On scheduled shift or 'scheduled overtime, work rates for each additional shift are to be 7S% of approved rates for the first shift. Description of Equipment and Applicable Rates for the First Shift Attached: Schedule A - Bates . Schedule B - Detailed Description Heavy Equipment `D`T1 `d 'S 09/28/98 TUE 11:09 [TX/RX NO 9884J @024 cm 0C8 K)S XVd OS'-OT NOW 66/TT/OT ; Exhibit C 'll 130 3W11 lNlUdaSiQISDOUE A Wd9E:Zl 'll IDO^BWU Q3A1333d)X04-x 4741s * CT 55104-X 47419 NICHOLS CONSTRUCTION CORPORATION FUELED AND MAINTAINED. BUT NO? OPERATED EQUIPMENT RENTAL RATES DESCRIPTION LIFTING POLES ` . '. DAILY RATES - S WEEKLY MONTHLY ,. 1 - Set 160* American Hoist & Derrick ' Minimum of One Mdnth Company Gin Poles, total 500 ton capacity, complete with' 2 - Manitowoc Model 390E "Vicon" 2-Drum Diesel Hoists . $15,000 ' . GUY DERRICK . 1 - Guy Derrick, 35-ton capacity, complete with Skagit 2-Drum Gas Driven Hoist, 16,000# Line Pull * CRAWLER "LIFT" CRANES $275 $635 $2,500 ,40-ton capacity 50-ton capacity 60-ton capacity 100-ton capacity MOTOR CRANES/CABLE . . ' $240 300 400 485 $960 1,200 1,500 1,700 $3,000 3,600 4,600 5,100 30-ton capacity 35-ton capacity 50-ton capacity 55-ton capacity 60-ton capacity 140-ton capacity MOTOR CRANES/fIYDRAULIC . $200 225 $700 750 360 1,400 375 1,465 400 1,600 ' 975 ;% 2. ,900 m - 40-ton capacity 45-ton capacity HYDRAULIC CRANES $295 $1/175 315 ` 1,265 k . 5-ton capacity 7-1/2 to 8-ton capacity 12-1/2 ton capacity 14 to 15-ton capacity . 1 $72 82 105 ` 115 * $280 325 410 450 $2,700 3,000 4,200 4,4004,8008,750 , $3,500 .3,890 * $1,100 1,225 1,600 1,750 DRAGLINE AND CLAM CRANES WITHOUT BUCKETS 3/8 cubic yard 3/4 cubic yard 1 - cubic yard 1-1/2 cubic yard ` $105 115 120 ' 175- $370 430 480 700 $1,300" 1,600 1,900 2,600 czo 09/28/89 TUE 11:09 [TX/RI NO 98841 02S D`T1 *d 9 M`H`S Om 0C8 K)S XVd OS;0T NOW 66/TT/OT .TeHois"ciw,rpc: 7. rv 1 [ ThGlS m%-l\ 'll 130 3WI1 Q3A1333H-- FUELED and maintained, bet not operated equipment rental rates . DESCRIPTION ' DAILY CRAWLER BACKHOE MACHINES. DISSSL DRIVEN 3/8 cubic yard 3/4 cubic yard 1 - cubic yard '' $110 * 120 ' 145 .* RATES -- $ WEEKLY * MONTHLY $385 440- 510 * $1,350 1.665 2,050 CRAWLER TRACTORS WITH DOZER BLADES Model JD-350 John Deere, Diesel-, Direct Drive, Manuel Shift D-4 Caterpillar 70 w/straight.Blade D-6 Caterpillar 9U w/Angle Blade ' with Winch HD-11E Allis Chalmers w/Angl-e Blade D-7 Caterpillar 17A w/straight Blade D-6C Caterpillar Power Shift with Angle Blade ` D-8H Caterpillar 46A power Shift with Angle Blade $45 72 105 110 110 220 240 CRAWLER TRACTOR WITH SIDEBOOM ATTACHMENT D-7 caterpillar. Series 3T $100 a . $180 285 420 43S 450 665 960 * $400 $720 900 1,6.75 . 1,750 1,800 2,000 3,840 _- ' $1,600 CRAWLER FRONT END LOADERS * 1-1/2 cubic yard. Direct Drive . 1-3/4 cubic yard. Power Shift ROBBER TIRED BACKHOE W/FRONT END LOADER $95 125 $330 440 $1,125. 1,500 Hydraulic Backhoe, Case Model 580CK, . or Ford Model 4500, Diesel GRADALLS * ' $70 .' $280 . $800 ' - Model 2460, Rubber Tired $180 Model G-600, Crawler * . 170 $625 585 DIRT MOVING AND COMPACTING -9 $2,500 2,350 DW-15 caterpillar Scraper $180 LeTourneau, 12 cu.yd. Towed Scraper 55 Model 12 caterpillar Motor Patrol 100 Cleveland Model 110 Ditching Machine 80 42" Double Drutf Sheepsfoot Roller 25 Wobble Wheel Roller - Towed 25 Tandem Cutter no. sc 25 - . 54" vibrating l-olleri Single Drum 40 $720 190 400 320 65 65 .65 135 . $2,520 625 1,320 1,100 185 185 195 475 PZ 0@ 09/28/99 TUE 11:09 tTX/RX NO 8884] 028 *D`T1 `d V M`H`S 0T8Z 0C8 MS XVd OS: 0T NOK 66/TT/OT > NICHOLS COE^J l \j Li J1 LLJ-Alllj)N. PAGE 11 130 3WI i__0.3 AJ_LQJ , schedule, FUELED AND MAINTAINED. BUT NOT OPERATED EQUIPMENT RENTAL RATES DESCRIPTION t . 9 float and lowboy trailers w/tractors HOURLY 20. ton Float *. 30 ton Float . Tandem Axle Pole Trailer . ' 30 ton Lowboy . 40 ton Lowboy ` 60 ton Lowboy 100 ton I-Beam Lowboy w/10-ton Dolly . 75 ton 16-Wheel Dolly w/o Tractor $10 12 12 12 16 22 40 RATES - S DAILY WEEKLY " `a ** . ' $120 $360 MONTHLY $1,000 PICKUPS-FLATBED-DUMP-WINCH TRUCKS/ INC!. ' Pickup Truck Flatbed/Flatbed Dump, 3-ton * Winch Truck, 2-ton Winch Truck, 3-ton (Fifth Wheel Tractor w/toinch). 5 cubic yard Dump Truck . 10 cubic yard Tandem Dump Truck 6-passenger Sedan Passenger Bus . .- Ambulance ' FORKLIFT TRUCK. CONSTRUCTION TYPE - $3 4 4 9 ' ' .4 9 * - - 4000# Lift Model IT-40, pneumatic Tires 6000# Lift Model IT-60, Pneumatic Tires $18 28 32 . 32 72 18 18 18 $45 60 $55 $175 112 400 128 ' 500 - 128 288 55 55 55 * 500 875 175 175 175 $160 . 215 $550 725 WELDING MACHINES -200 Amp Gasoline 300 Amp Gasoline ` , $11 14 ' 300 Amp Electric 400 Amp Electric . 6 * *7 600 Amp Electric -- 12 Welding Cable ($ per ft.) .01 300 Amp Water Colled Heliarc Welding Machine 32 . $44 56 19 25 . 33 ' ' 04 86 $160 185 55 67 86 , 257 WATER BLAST MACHINE 4800# water Blaster, trailer- mounted with Hose and control Valve Nozzle . $75 $220 ` $660 air compressors . 75 CFM Air Compressor, Gas 125 CFM Air compressor. Gas 315 CFM Air Compressor, Diesel ' 600 CFM Air Compressor, Diesel ` *3/4" Air Hose, 50' Lengths/Each $15 $50 $170 21 63 75 196 250 591 a 95 300 1,000 1.45 3. 45 8 00/28/09 TUE 11:09 tTZ/RZ NO 9884] @027 szo D`T1 `d 9 M'JTS 0T8i. 0C8 f'OS XVJ IS:01 NOW 66/TT/OT .'NICHO LS CWdS:lJ"< 'l l IDO--C3WI1 INIddCON. 1 PAGBM9:l 'll. 130 Mil Q3AI333dc. sc.h( edule ' FUELED AND MAINTAINED. BUT HOT OPERATED EQUIPMENT RENTAL RATES . DESCRIPTION PUMPS - ` *. DAILY 'RATES - S "WEEKLY MONTHLY Air Sump Pump Sludge Steam Test. $9 '- 5 . 10 water Pumps, Gas Driven, Centrifugal or Diaphragm ` ` $27 18 - - 34 ^ $80 54 105 . 2" Water Pump 3" Water Pump * . 4" Water Pump Hose:. Discharge 2" x 50* Section . 3" x 50* Section 4W x 50' Section . .> q 4 . $8* ' 11 15 $2 3 5. $25 32 45 $7 9 14 $76 97 135 $20 27 42 Hose: Suction . 2" x 25* Section . $2 3" x 25* section 3 " 4" x 251 Section 5 $7 10 14 . $22 29 43 B UCKETS * * Clamshell (Material Handling/or General purpose) 3/8 cubic yard ' 5/8 cubic yard . $1* 17 $37 50 3/4 cubic yard 18 . 55 1 - pubic yard 20 . 59 1-1/2 cubic yard 29 ,x 86 1-3/4 cubic yard . 30 90 . -2 - cubic yard 32 95 3 - cubic yard 44. 133 Concrete, Bottom Dump 1/2 cubic yard 1- - cubic yard 2 - cubic yard . -- $6-- - $17 9 26 , 13 38 Dragline 3/8 cubic yard 1/2 cubic yard 3/4 cubic yard 1 - cubic yard 1-1/4 cubic yard 1-1/2 cubic yard 2 - cubic yard 2-1/2 cubic yard ` ` * $8 ' 11 14 16 20 - 21 26 31. $25 32 42 48 59 62 77 92 . $112 149 165 177 258 270 . 285 400 . $52 79 113 $74 97 126 145 177 187 231 276 920 09/28/99 TUE 11:09 [TX/RX NO 9884] @028 `D`T1 `a 9 M`H`S 0T82. 0C8 I'OS XVH 12 = 01 NOW 66/TT/OT M1CHOL5 CQNST^-^.^JK-U- '130r|djN, page 5 l^ld9 ^ i . * . ....i^bi, i^wmouuIg A FUELED AND MAINTAINED. BUT NOT OPERATED EQUIPMENT RENTAL RATES DESCRIPTION . _____________RATES - $_____________ DAILY WEEKLY MONTHLY .vtlSCELLANEOUS TOOLS AND EQUIPMENT Bender, .Hydraulic Electric Conduit Bender, 1 1/4" to 2" .*2 Beveling Machine, 8" to 12" Either H&M or Mathey :3 Beveling Machine, 14" to 20" Either H&M or Mathey Breaker, Under 50# Paving Breaker Breaker, 6o# Paving Breaker Breaker, 70# Paving Breaker Buster, Rivet Buster 28# with 11" Piston Stroke 9.00 $ 29.00 19. 00 39.00 23.00 6.00 6. 00 7. 00 77. 00 18. 00 19- 00 22. 00 6.00 21.00 $ 88.00 65. 00 150. 00 51.00 55.00 63.00 57. 00 Cutter, #250 Toledo Geared Pipe cutter w/holders & cutting tools . 8.00 23. 00 68.00 Drill, Air, 1" to 1 1/4" Drill, Magnetic Electric 1 1/4" H. D. 2 - speed Magnetic Drill Drill, Rock, Air 25 to 40# Black & Decker Model 1554 6.00 9.00 6,00 19. 00 26. 00 20. 00 53.00 77. 00 57. 00 Electronic Tube Rollers :i4.oo 40. 00 , 119. 00 Hammer, Air 70 to 90# Hammer, Sheeting (90# Hammer w/Sheeting Head) Hammer, Skill Rotary Drill, 3/4" Hammer, Vulcan #3, 3000# Single Acting Sheeting Hammer Hoist, 3 to 4 1/2 ton Chain Hoist, 5 to 6 .1/2 ton Chain Hoist, 9 to 12 ton Chain Hoist, Coffing, 6 Ton Ratchet & Pawl Type Load Binder Hoist, Single Drum, Gas Driven Hoist, Air, 2000# Line Pull Single Drum Less Cable Hoist, Air, 4000# Line Pull Single Drum Less Cable Hoist., Skagit 2-Drum with 16, 000# ' Line Pull - Hose, Air, 3/4" x 50' .. * Hose, Whipline, 1/2" x 10' 7.00 22. 00 63.00 9.00 4.00 27.00 11.00 80.00 32.00 35.00 8. 00 11.25 12.00 100. 00 22. 00 26, 80 33. 00 330.00 63. 00 72.00 90. 00 8,00 8.00 20. 00 ' 24. 00 58. 00 68. 00 13.00 40. 00 119. 00 2L00 63. 00 184.00 120.00 360.00 1080. 00 2.00 5.00 12.00 1. 00 2. 00 5. 00 09/29/99 TUE 11:09 [TX/RX NO 9884] @1029 LZ 0 D`T1 `d 'S M'JTS 0T8i 0C8 tOS XVd ZS`-0T NOW 66/TT/OT MfCHOLS CONST&ui' iooB jwu mu'' PAGE, omvi\ 1x1 .x-lOmOb^irJWil Gs3cAnI3eDo3Hule A DUELED AND MAINTAINED. BUT NOT OPERATED EQUIPMENT RENTAL RATES :SCRIPTlON DAILY RATES - $ WEEKLY MONTHLY Hot Tap Machine, 1" to 2" Hot Tap Machine, 3" to 12" Level, Tripod and Rod-Engineering Light Plant, 7.5 KVA, Diesel, Portable Mats, Dragline (Per Calendar Day) Size 6" x 4' x 16' thru 12" x 51 x 30` $ 46.00 141.00 5.00 25. 00 $ 114.00 418. 00 15.00 76.00 5. 00 $ 342.00 I, 254.00 45.00 229.00 Mortar Mixer, Jaeger, Gas 11.00 32. 00 ` 90. 00 Sand Blast Pot - 251 to 300# Sand Blast Pot - 301 to 500# * 3/4" x 501 Air Hose Coupled * 1" x 50' Air Hose Coupled , * 3/4" x 50' Sand Blast Hose * 1" x SO1 Sand Blast Hose * 3/4" x 10' Whipline Hose * Hood, Canvas - Nozsle, Short * Valve, Control Saw, Abrasive, 16" Electric Saw, Clipper, Masonry, 14" Saw, Power Hacksaw, w/Clamps and Blade Guide, Model MOT 6-13 . Saw, Metal Cutting Band Saw. Wells Model 1000, 110 Volt Saw, Radial Arm, 5 HP, Electric Spade, 30# Pneumatic Clay Spade (Digger w/spade) 11.00 12.00 2. 00 4. 00 3.00 *4. 00 2. 00 2. 00 4,00 8. 00 9.00 9. 00 6. 00 12.00 11.00 7. 00 32. 00 35.00 5. 00 10. 00 7. 00 11. 00 6. 00 5.00 9.00 23, 00 28. 00 26. 00 18. 00 ' 36.00 34. 00 20.00 90. 00 100.00 13. 00 24. 00 24.00 30. 00 13.00 12.00 27. 00 59. 00 83.00 73. 00 '55. 00 99.00 101.00 58.00 Tamper, Gas Engine Driven Wacker Model GRV-100 or Racine Model 101 - 112# Tamper., Pneumatic, Single Unit Over 35# Transit and Tripod - Engineering Threader, Pipe 1/S" to 2" Troweling Machine, Floor, 36" Troweling Machine, Floor, 40 to 50" Vibrator, Air, 1 7/8" to 3" Vibrator, Gas, 7 Horsepower 28. 00 6. 00 5.00 9. 00 11.00 18.00 n. oo 14.00 83. 00 18. 00 15.00 28. 00 34.00 53,00 35. 00 36.00 220. 00 50.00 45.00 84.00 94.00 144.00 97. 00 100.00 8Z0@ 09/28/89 TOE 11:08 [TX/RX NO 9884] @030 `D`T1 `d ? M`K`S 0T8Z 0C8 frOS XVd ZS 01 NOW 66/TT/OT NICHQTS CONST^ffi^lLlA 'IOQirPHPAGE 7^^ '<U l i 100,^31^1 II^Q3AJL12L^ilc A FUELED AND MAINTAINED, BUT NOT OPERATED EQUIPMENT RENTAL RATES DESCRIPTION Wrench, Impact, 3/4n Drive Wrench, Impact, ]" to 1 l/4' Drive Wrench, Torque Controlled Temperature Recorder, Minneapolis Honeywell, with Single Pin, Model 153X-64P8-X-41 Trailer, Portable Instrument Shop for instrument repairs, Atlantic Office Trailer Model AD-30, 8* x. 30' "Bil-Jax" Swinging Stage Scaffold, complete w/winches, bails, hooks DAILY RATES - $ WEEKLY $ 10.00 11.00 13.05 $ 29.00 33.00 41.20 ' 11.00 35.00 20. 00 MONTHLY $ 83.00 100.00 115.20 100. .00 .360.00 6o. 00 *Note: Rate applies even though unit cost is les6 than $300, 00. Cable and hose are accessories and as such are part of systems having costs in excess of $300. 00. 6Z0@ 09/28/89 TUE 11:09 [TX/RX NO 9884] @031 `D`T1 `d 9 M`H`S 0T8Z 0C8 tOS XVd ZS:0T NON 66/TT/OT "Exhibit C Mtt-ll `l 1130. 3WU INIHj-HHpqm a .NiK-ll '11100 3WI1 03AI303^ -. NICHOLS CONSTRUCTION CORPORATION , < > ii !> i * Description of Heavy Construction Equipment Available for Rental DESCRIPTION CAPACITY MAXIMUM BOOM/JIB TYPE ENGIh CRAWLER "LIFT1* CRANES Manitowoc, Model 3000 Manitowoc, Model 3500 Manitowoc, Model 3900 Manitowoc, Model 39005 40-ton 50-ton 60-ton 100-ton 140' boom 25' jib 140' boom 20` jib 140' boom 25' jib 210' boom. 49* jib Diesel Diesel Diesel Diesel (Above cranes equipped with Torque Converter and Independent Boom Hoist) MOTOR CRANES/CABLE CONTROLLED Link Belt, Model HC-98 "b ' Lima, Model 54-T . Link Belt, Model HC-98A Bueyrus-Erie, Model 30B Lima, Model 500-T - Equipped with Hydraulic Outriggers, Torque Converter, Reverse Friction on Load Line . . ` Lima, Model 550-T - Equipped with Hydraulic Outriggers, Torque Converter, Reverse Friction on Load Line Lima, Model 6Q0-T ' Equipped with Hydraulic Outriggers, Reverse Friction on Load Line P & H, Model 9125-TC Equipped with Hydraulic Outriggers, Torque Converter, Reverse .Frictions on Both Drums 30-ton 35-ton 35-ton 35-ton 50-ton 55-ton 60-ton 140-ton 100* boom 30* jib 100' boom 20* jib 100* boom 30' jib 120* boom 30* jib 180* boom 40* jib 150* boom 20* jib 180* boom 40' jib 270' boom 60* jib Gas Gas Gas Gas Diesel Diesel Gas Diesel (Above eranes equipped with Indepen4ent Boom Hoist) MOTOR CRANES/HYDRAULIC CONTROLLED - Telescoping/Swinging Boom Sargent, Model HT-8440 . Equipped with Hydraulic Outriggers Sargent, Model HT-8445 Equipped with Hydraulic Outriggers 40-ton 45-ton 100* boom 20* -jib 100' boom 25* jib Diesel Diesel SELF-PROPELLED HYDRAULIC "LIFT" CRANES Austin Western, Model 210 Low Shipper 5-ton 35' boom Gas 09/28/99 TUE 11:09 [TX/RX NO 8884] @032 oco `0`T1 `d 'S M`H`S 0T8Z 0C8 tOS XVd CS=0T N0K 66/TT/OT - - ^.^'^l^lLAwlj^l-L^JlI^AUCTIOW C&.^1:'130* 3IAII1 QBAi333H.`. * i . " * -,, Description of Heavy Construction Equipment Available for Rental . DESCRIPTION ' CAPACITY MAXIMUM BOOM/JIB TYPE ENG- SELF-PROPELLED HYDRAULIC "LIFT0 CRANES ' (continued'from previous page) Austin Western, Model 210 High Shipper Grove, Model RT-38A Grove, Model RT-48 Pettibone-MulliJean, Model 25 Grove, Model RT-58 Pettibone -Mullikan, Model 30 > 7-1/2-ton 35* boom - . ` 7-l/2?ton 40* boom 14* jib ,, . 8-ton 30* boom 14* jib 12-1/2-ton 48' boom . 14-ton 58* boom 20' jib 15-ton 70* boom - Gas Gas and Diesel Gas Gas Gas Gas (Above cranes equipped with 4-Wheel Drive, 4 - Outriggers) *" DRAGLINE AND CLAM CRANES WITHOUT BUCKETS Schield -Bantam, Model C-35, 3/8 cubic yard machine .Bucyrus-Erie, Model 22B, Series-3 3/4 cubic yard machine Lima, Model 44 ` 1 cubic'yard machine Bucyrus-Erie, Model 38B ' 1-1/2 cubic yard machine Northwest, Model-6 . 1-1/2 cubic yard machine 5-ton 35' boom 13-1/2-ton 60* boom 25-ton 60* boom 35-ton 85* boom 30* jib 3 5-ton 130` boom Diesel Diesel Diesel Diesel Diesel (Above cranes equipped with Independent Boom Hoist) CRAWLER BACKHOE MACHINES BUCKET CAPACITY Schield Bantam, Model C-35 Bucyrus-Erie, Model 22B, Series 3 Lima, Model 44 3/8 cubic yard 3/4 cubic yard * * 1 cubic yard Diesel Diesel Diesel CRAWLER TRACTORS WITH DOZER BLADES John Deere Model JD-350, Direct Drive, Manuel Shift, Drawbar Horsepower 30, Net Engine Horsepower 42 Caterpillar Model D-4, Series 7U, Hydraulic Controlled with straight blade. Drawbar Horsepower 50 . . * Diesel . . * Diesel ICO 09/28/99 TUE Ur09 ITX/RX NO 9884] <2)033 0`TI `d *8 M`H`S 0184 0C8 t'OS XVd CS: 01 NOW 86/11701 . .:?*!'**** cr scta':lB'll 100 3WU ININd , 'll `IDO 3WU a3AI333V<T " . *- ECHOLS CONSTRUCTION CORPORATION ` 9 . It !> lit | Description of Heavy Construction Equipment Available for Rental DESCRIP.TION ' TYPE ENGIN Caterpillar Model D-6, Series 9U, Direct Drive, , with. Angle Blade'and Winch, Drawbar Horsepower 75 * Allis-Chalmers Model HD-1 IE, Direct Drive, with . - Angle Blade, Drawbar Horsepower 95, Net Engine Horsepower 122.5 .. Caterpillar Model D7, Series 17A, Direct Drive, with : Straight Blade, Drawbar Horsepower 102 . ` Caterpillar Model D-6C, Series 76A, Torque Converter Drive, . Power Shift, 120 Drawbar Horsepower, with Angle Blade Caterpillar Model D-8H, Series 46A, Torque Converter Drive, Power Shift, 270 Drawbar Horsepower, with Angle Blade . *. Diesel ' Diesel Diesel Diesel Diesel CRAWLER TRACTOR WITH SIDEBOOM ATTACHMENT Caterpillar Model D-7, Series 3T, Direct Drive, Drawbar Horsepower 90 - Diesel CRAWLER TRACTOR WITH FRONT END LOADERS DESCRIPTION BUCKET CAPACITY TYPE ENGINE Allis Chalmers Model HD-6G, . Direct Drive, Manuel Shift * Allis Chalmers Model HD-7G, Torque Converter Drive, Power Shift Caterpillar Model- 955-H, Torque " Converter Drive, Power Shift 1-1/2 cubic yard 1-3/4 cubic yard '. 1-3/4 cubic yard , . ' Diesel Diesel . ' Diesel FOUR-WHEEL, RUBBER TIRED TRACTOR W/FRONT END LOADER & BACKHOE ______ __________________ /` attachment______________________ -- ---------------------------------- ' Case Model 580CK, Direct Drive, . Manual Shift, Engine Horsepower RI ated 52 V Ford Model 4S00, Direct Drive, Manual Shift, Engine Horsepower Rated 52.9, Drawbar Horsepower 42 t ' ' ` ' Diesel . - Diesel GRADALL MACHINES (MULTI*PURPOSE HYDRAULIC EXCAVATOR) Warner & Swascy Rubber Tired Gradall Model M-2460, Diesel Engine Powered on Upper structure. Gasoline Powered n Carrier. . ' * .. ' .. 09/28/99 ' TUE 11:09 \ Diesel [TI/RX NO 9884] 121034 SCO `0*T1 `d 8 M`H`S 0T81 0C8 tOS XVd J^OT NOW 66/TT/OT .^hlbitc, S=l*ivtdjs:n,'irj.30 3Wii INiad . : HJ9E = Zl 'll 100 3(111 03AH038 NICHOLS CONSTRUCTION CORPORATION * * 4` - m. w * * Description of Heavy Construction Equipment Available for Rental GRADALL MACHINES (MULTI-PURPOSE HYDRAULIC EXCAVATOR) ' continued from previous page * DESCRIPTION Warner & Swasey Crawler Gradall Model . G-600, Double Hydraulic Motor. 23 Horsepower. Powers each track through enclosed gear box reducer, gear and chain final drive . :TTPE ENGINI Diesel ( Both of the above machines rated -5/8 cubic yard' capacity- Equipped with either 36*' Trenching (Digging) or &0M Ditching (Smooth) Bucket.) CC0@ I 08/28/99' TUE 11:09 [TX/RX NO 9B84] 0035 "D`T1 `d 9 M`S`S 0T8Z 0C8 tOS XVd tS:QT NOW 66/TT/0T