Document gwpVLXwQbXVdKNQoRpn1E6QJ
Inter Office*
Personnel and Organization Staff
March 9, 1981
Mr. J. Woodward General Services Plant Engineering Research and Engineering
cc S. Pant, M.D. / R. Quarles
Subject: Materials Analyses for Asbestos
The fifty-five bulk samples you submitted to Industrial Hygiene and Toxicology Laboratory were analyzed for presence of asbestos dust and fiber. A quali tative analytical test was used to screen samples into "negative" (less than one percent asbestos) and "positive" (greater than one percent asbestos). The test includes six major mineral forms of asbestos (i.e., chrysotile, tremolite-, actinolite, crocidolite, anthophylite, amosite). Results are attached.
Forty-two samples are negative for asbestos. Normal, good industrial hygiene practices to minimize airborne dust generation from these materials during main tenance activities should be practiced. These controls include wet methods, vacuuming, local exhaust ventilation, and use of appropriate dust respirators.
Thirteen samples gave a positive presumptive test for asbestos. It should be noted that this screening test, while sensitive to as little as one percent asbestos, gives the possible presence or definite absence of asbestos. Handling these materials must be in accordance with OSHA asbestos standard regulations (attached). If you indicate, we will arrange X-ray diffraction analyses of these thirteen materials to confirm and determine percent asbestos of each type in each sample. These testB are performed by a commercial industrial hygiene laboratory. Industrial hygiene surveys for airborne asbestos dust will be scheduled for those locations where asbestos positive materials were identified.
dt Attachments(3)
Roger Wabeke, Supervisor Industrial Hygiene Services Section Employe Health Services
8004 1138
SCF-ALLF-08471
Table I
POSITIVE ASBESTOS TEST RESULTS (yl%)
Sample Designation
Data Retrieval No.
Dyno, 1st floor hallway to wing D
RLV-5048
Building No. 1, from ceiling outside room G-225
5011
EEE Powerhousei 2nd floor
5007
Design Center basement fan room
5052
Building No. 1, 1st floor hallway outside room 1020
5012
Building No. 1, 3rd floor ceiling in hallway out side room 3102
5013
Building No. 1,2nd floor ceiling outside room 2149
5016
Building No. 3>1st floor hallway outside room 1108
Building No. 3, ground floor ductwork janitor locker room
5019 5024
Building- No. 3,1st floor hallway outside room 1104
5025
Building No. 5,1st floor hallway outside room 1020 and freight elevator
5036
Building No. 5 2nd floor room 2050
5037
New Body above Textile Lab
5056
p'1-:' .
! !'
Ul: American If-
(
.:V|!
! ,I
''
PQ3004 1139
\
Table II
NEGATIVE ASBESTOS TEST RESULTS (<1<)
Sample Designation .
Data Retrieval No.
Scientific Research, monitor 9> fan S-29, top of Scientific Research, room S-3032, top of ceiling
RLW-5030 5032
Building No. 5i 3rd floor, hallway outside room 3120
5039
Building No. 3 3rd floor, hallway outside room 3102
5029
Building No. 3, 2nd floor, hallway outside room 2030
5027
Building No. 3> ground floor, hallway outside G-053
5023
Building No. 5> fan room, by room G-I67
5022
Building No. 5, 3rd floor, hallway outside room 3219
5020
Building No. 3> 3rd floor, ceiling outside room 3024
5018
Building No. 1, 2nd floor, hallway outside room 2020
5017
r Building'No. 5, 2nd floor, hallway outside room 2104
5038
Design Center paint shop
5051
New Body monitor #8
5045
Dyno pump room across from lunch room
5043
Building No. 5> 1st floor, hallway ceiling outside room 1110
j-q^c
Scientific Research room E-3l8l top of ceiling
5034
Scientific Research room S-2061B top of ceiling
5033
Building No. 3/ 1st floor, hallway outside room 1217 Scientific Research, room S-1070 exhaust duct EEE fan station #148 EEE fan station above cafeteria Design Center wood fab. shop New Body A/C fan room ground floor EEE ceiling above C011
5028 5031 5009 5008 5057 5055 5006
EEE ceiling above room D048
5005
8004 1140
Sample Designation
Table 11 Continued
EEE, ceiling above room E-024
Byno Bldg., 2nd floor wing D fan room
EEE, basement outside men's room #5
EEE,basement tunnel entrance area
Dyno 1st floor cell 10A
Design Center, fan room on annex
Design Center, 1st floor plastic fab. shop
Dyno ground floor at column K-10
New Body, 1st floor shaper room wood model shop
EEE, above ceiling room E025
Building No. 1, ceiling outside room G108
New Body plastic shop
EEE, fan station #146
Exhaust Chamber Dynamometer, 3rd floor
Dyno Bldg., 3rd floor catalyst lab
Building No. 1, 3rdfloor ceiling outside room 3004
Building No. 5, hallway outside room GO36
Building No. 3, 2nd floor hallway outside room 2100
Dyno Building., 2nd floor A wing fan room
Scientific Research, room E-3155 above ceiling
Data Retrieval No. RLW-5004 5041 5003 5002 5049 5054 5053 5050 5047 5001 5015 5046 5010 5044 5042 5014 5021 5026 5040 5000