Document gveqXnwB21EZ9wd97xmw38OV

HMBB-B037398 I w e=: R-g!` TO: WINSTON-SALEX, NC Turbine Coaponents Plant R. W. Dees Plant Manager ee: Winston-Salem, NC T. L. Watters Industrial Bygiene & Safety Rap 1 PLAINTIFF'S | EXHIBIT IWH-825 INDUSTRIAL BYGIENE AUDIT OP TURBINE COMPONENTS PLANT WINSTON-SALEM, NC APRIL 22, 1987 c- Conducted and Reported by ir ; Corporate Industrial Bygiene Dept. Mestlnghouse Electric Corporation RAD Canter - 401-3X9 1310 Beulah Road Pittsburgh, PA 15235 June 4, 1987 . HNBB-0037399 V ,r'./ <F=! C'.C' ABSTRACT An Industrial Hygiene Audit of the Turbin* Component Plant in Winston-Salem, hc was conducted by c. V. Blckerstaff on April 22, 1987. Ma. Theresa Watters provided a tour of the plant and answered question* relative to this audit. The recommendations which follow are a result of this audit, and are commented upon in detail in the Discussion Section of this report. ' 1. Update the plant Inventory of hazardous materials and provide specific training this year to employes who work with hazardous materials. 2. Perform annual monitoring for employes who work with solvents, grinding operations, high noise areas and heat stress operations. 3. Control of ventilation design. Modification should be maintained by plant facilities. 4. Asbestos pip* insulation should be removed by the customer before the units are shipped to the (W) plant for repair. 5. Mr. Sam Brim should be enrolled in the next Corporate Safety Training Course. '2- I r *=3 uS---*J @ I^ii DISCUSSION Tbc purpose of this sudit was to review this plant's operation and recordkeeping procedures with respect to good industrial hygiene practice. The standard (W) Corporate Audit Born, a Hazard Comaunication Audit Perm, a walk-through tour of production areas, and Interviews with plant personnel were employed for this audit. 1. The plant Hazard Communieation/Bigbt-To-Know (HC/RTK) Program was established last year and contains all of the necessary functions, l.e. inventory of hazardous materials, an inventory of MSSS's, a written program, labeling of most hazardous materials and general training for all workers. This year, however, specific training should be given to employes who work with hazardous materials or in hazardous operations such ss vapor degreasing, grinding and high noise areas. MOTE! Corporate Industrial Hygiene has such training programs available. To update and complete your HC/RTX Program the inventory of hazardous material should be updated and copies of appropriate HSDS's should be placed in various areas of the plant accessible to the employes. 2. Industrial hygiene monitoring in the past has Included areas such as air sampling in the grinding operations and noise monitoring. An annual monitoring program should be performed for employes who work with hazardous materials, i.e. vapor degreasing, grinding operations, and high noise areas. Before initiating such as program, review the materials used and the type of operations with Corporate Industrial Hygiene to establish the proper monitoring procedures. 3. Ixhaust ventilation is a'major control for controlling the work atmosphere in the plant. Each ventilation addition or modification should be approved by plant facilities to maximise the control and minimise energy loss. To keep the plant facilities personnel current in ventilation design, someone should attend one of the Induatrial Ventilation Courses (contact Corporate industrial Hygiene for details). -3- MMBB-0037600 MWBB-0037401 I ** O 5. Mr. Sam Bria was promoted into the Busan Resources Oapartsant and ona of his rasponsibilitiaa is industrial Bygiana and Safety. Tharafora, ha naads to raeaiva training in industrial hygiana and safaty. Tha initial (W) coursa is Safaty Managasant which should ba offarad this fall. Than ha should ba schadulad to attand a (W) Industrial Bygiana Coursa next yaar. Cosmants concerning this audit ara waleoned. Please issue a response by July 10. 1987 concerning bow and whan racoasandations in this report will ba inplenented. (O. Oj. C. w. Biekerstsff, Manager Corporate Industrial Bygiana /Jse i--. OC a r--'