BRIE? REVIEW OF OPERATIONS AT THE GREAT FALLS PLANT AND AT THE EAST HELENA SLAG TREATING PLANT FOR THE YEAR 1950
For convenience, this report has been divided into the following parts:
1. Copper Refineries 2. Zinc Plant 3. Rolling Mills (Anaconda Yire and Cable) 4. Ferromanganese Plant 5. General 6. Expenditures 7. Slag Treating Plant, East Helena
1. COPPER REFINERIES The Electrolytic Copper Refinery operated at an average
rate of 52.l capacity, and an average current density of 12.6 amperes per square foot, producing 168,326,299 pounds of cathodes. There were 1,239,742 pounds of cathodes shipped dur ing the year.
In addition to the cathodes produced from our own Electro lytic Copper Refinery, we received and treated in our Furnace Refinery 12,914,533 pounds of cathodes from Inspiration, Arisona
The Anode Casting Plant operated 228 furnace days in 1950, producing a total of 155,142,993 pounds of copper anodes, including that from anode scrap and miscellaneous copper scrap, 24,990,653 pounds of Miami blister copper and 34,145,465 pounds
PNYC 00012651
-2-
of Kennecott blister copper. The No. 1 furnace in the Furnace Refinery Department operated continuously in anode production during 1950.
Shipment of blister copper from the Garfield plant of the American Smelting and Refining Company for account of Xennecott Copper Corporation, which was started in December, 1949, was continued through June, 1950. We received and treated 33,020,340 pounds from this source, plus 1,125,125 pounds on hand January 1, 1950, which gave a total treatment of 34,145,465 pounds, from which 33,592,036 pounds of returnable copper was produced.
The Furnace Refinery operated 313 days during the year, at an average rate of 50.756 capacity, producing 176,185,623 pounds of shapes. A total of 188,154,592 pounds of refined cop per was shipped during the year.
The Scalping Plant operated 243 days in 1950, for a total of 257 shifts, producing 31,677,234 pounds of scalped wirebar. Shavings amounted to 2,680,665 pounds, or 8.4656 of wirebar scalped, which was retreated through the Furnace Befinery. 8,904,851 pounds of scalped wirebar was delivered to the Rolling Kills at Great Falls, and 23,989,649 pounds was shipped to the American Brass Company during the year, including 3,905 pounds of silver. A total of 12,524,787 pounds of silver-bearing copper, containing 53,167 troy ounces of silver, was produced for the American Brass Company. 55,975 troy ounces of silver was used for this produc tion, giving a loss of 2, did ounces for the year.
PNYC 00012652
3
The distribution of copper shipped during the year was
as follows:
A.C.M. Copper
Pounds
Percent Of Total
American Brass Company (Cathodes)
1,239,742
American Brass Company (Shapes)
40,720,333
A.C.M. Company (Warmers)
93,356
Great Falls Rolling Mills of Anaconda
Wire and Cable Company
,136,35? ,750
Total Company
173,409,636
0.66 21.64
0.05
72.4?
94.82
Kennecott Shipments TOTAL SHIPMENTS
....?,?44,?Q6 183,154,592
5.18 100.00
2. ZINC PLANT All units of the Zinc Plant operated at full load through
out the year with the exception of reduction in power during the months of July, August and September because of atmospheric temperature, and a further reduction in power for the period of August 4 to September 27 due to a shortage of feed.
The total production of zinc cathodes for the year was 331,331,799 pounds, of which IS,114,349 pounds came from the re treatment of zinc plant dross. 2,036,214 pounds of cathodes was produced from zinc oxide recovered from zinc easting plant bag-house. 17,372,532 pounds of zinc, as zinc dust, was returned to the Zinc Leaching Department for solution purification. 3,651,596 pounds of zinc dust was returned to the Purification Residue Plant for solution purification, and 1,024,336 pounds of zinc dust was used in the retreatment of purification residue for the recovery of cadmium,
PNYC 00012653
-4-
The Casting Plant treated 331,369,082 pounds of Great
Palls cathodes, producing slabs in an amount of 238,172,206
pounds. No Anaconda cathodes were treated. The Casting Plant
also produced 22,549,013 pounds of sine dust and 24,149,860 pounds of sine dross (including baghouse sine oxide) containing
19,853,395 pounds of sine. Of the cathodes treated at the
Casting Plant, 96,461,207 pounds was Company zinc, and 234,907,875
pounds was toll zinc. From Company cathodeB was produced
84,296,977 pounds of slabs, and from toll cathodes was produced
203,875,229 pounds of slabs. The net production of 288,172,206 pounds of slabs was
cast as follows: A.C.M. COMPANT
POUNDS
Slabs - High Grade Slabs - Intermediate and Alloys
Total Company
TOLL
53,908,134 30,3.33,m
84,296,977
Slabs - Prime Western Slabs - High Grade
Slabs - Intermediate and Special Alloys Slabs - Brass Special
6,333,802 181,324,001
16,012,426 200.000
Total Toll TOTAL NET PRODUCTION
203,875,229 288,172,206
The zinc shipments from the Great Palls Plant, for account
of Anaconda Company, for the year were distributed as follows:
TONS
PEBCENT
American Brass Company Plants Others
TOTAL
4,155 38.451
42,606
9.75 90.25
100.00
PNYC 00012654
-5-
The Zinc Plant produced during the year a total of 90,325.36 ton3 of residues for shipment, which contained 20,953,565 pounds of lead, 6,403,994 pounds of copper, 2,884,884 ounces of silver, and 12,656.225 ounces of gold. Included in this figure are 81,750.11 tons of regular sine plant residue, and 8,575.25 tons of purification copper residue shipped to Anaconda. The 8,575.25 tons of purification copper residue is the result of treating purification residue from both Anaconda and Great Falls Zinc Plants. 9.78 tons of East Helena Slag Treatment Plant baghouse fume was sold locally during the year.
A total of 21,393 tons of lead bullion, resulting from Great Falls and Anaconda residue and Anaconda lead concentrate, was shipped to American Smelting and Refining Company at Omaha, Nebraska, for refining and with return of refined lead to Ana conda Sales Company.
The Cadmium Plant produced 1,917,289 pounds of metallic cadmium during 1950, of which 1,152,929 pounds was Company cady mium and 764,360 pounds toll cadmium. A total of 1,935,860 pounds, including that alloyed in debased sine, was shipped during the year, of which 1,177,929*20 was for the Company and 757,930.60 was toll cadmium. On January 1, 1951, there was on hand at Great Falls a total of 33,208 pounds of finished cadmium, all of which was toll cadmium.
In the Indium Plant 119,716.78 ounces of indium was pro duced from "in process" materials during 1950. We had on hand at Great Falls 25,322.93 troy ounces of indium on January 1, 1950,
PNYC 00012655
-6-
and 1,000.28 troy ounces at Utica, New Tork. The sales of indium
for the year totaled 101,027.66 troy ounces. The total inventory
as of January 1, 1951, was 45,012.33 troy ounces, of which 3*000.81
was at Great Falls.
In 1950 we produced 2,710 grass of gallius netal as a by
product of indiua production and delivered 800.90 grass against
Anaconda Sales Company sales. We had 1,909.10 grass of gallius
on hand at Great Falls on January 1, 1951.
3,556 tons of purchased concentrate, 135*602 tons of toll
concentrate, 34*822 tons of baghouse fume from the Slag Treatsent
Plant at East Helena, 265 tons of International Snelting and
Refining Company cadmium-bearing fuse from Tooele, 47 tons of
Tooele fuse purchased fros American Cheset Company, and 57,056
tons of sine concentrate from Anaconda, was treated in the roasters
during the year. The following toll concentrates were treated:
TOLL ZINC CONCENTRATES TREATED
DRT TONS
American Zinc Company of Illinois Federal Mining and Smelting Company International Minerals and Metals Corporation Combined Metals Reduction Cospany U.S. Smelting, Refining and Mining Company Philipp Brothers, Inc. Eagle Picher Mining and Smelting Cospany General Services Adsinistration National Zinc Cospany
Total
21,241 1,536
43,279 49,066
1.615 5,486
,1,710
10,288 1 1*1
135,602
The calcine produced from these concentrates and fuse.
together with 54,636 tons of calcine, and 9,785 tons of purifica
tion residue fros Anaconda was treated in the Leaching Plant.
000A*656
7'
3. ROLLING MILLS DEPARTMENT (ANACONDA WIRE AND CABLE COMPANT) The Bo. 1 Rod Hill operated 294 shifts and No. 2 Rod Mill
operated 21 shifts daring 1950. The net rod production for the Bo. 1 Kill for the year
was 136,483,051 pounds, and the gross production (including serap and scale) was 140,946,955 pounds. The net rod production for the Be, 2 Mill was 4,384,256 pounds, and the gross produc tion was 4,524,372 pounds.
Ve produced 54,470,165 pounds of ox-off rods in 1950 as compared with a production of 30,812,950 pounds in 1949,
A new record high production of 5/16" rods was set on March 22, when 1,724 bars were rolled for a total weight of 538,914 pounds, the prerious record of 1,700 bars rolled, with a weight of 530,285 pounds, haring been established Borenber 8, 1946. On March 23 the record was again broken when 1,770 bars were rolled for a total weight of 552,353 pounds*
On June 21 a new record for nuaber of bars rolled was established when 1,805 bars were rolled into 5/16" rods in an eight-hour shift.
A new record for number of bars and total weight of copper rolled in a continuous 16-hour period was established on Decem ber 27 with 3,310 bars rolled for a total weight of 1,030,121 pounds. This record was broken again on December 28, when 3,342 bars, weighing 1,042,527 pounds were rolled.
In March the aYerage daily production of 5/16" rods was also an all-time record, with 498,876 pounds per day, the prerious
pNVC 000A2657
-3-
high monthly record haring been established in December, 1946, with 493,493 pounds per day. In April the record was again broken by an average daily production of 503*517 pounds. In April a record was also established for the average production of 3/3" rods with 507,575 poimds per day, as compared to the previous record of 441,014 pounds per day, established in December, 1949.
In March a new record in average daily production of rods of all aises, on a one-shift basis, was set with an average pro duction of 444,635 pounds per shift, the previous record having been 476,560 pounds per day, established in November, 1949.
It is particularly gratifying that these record produc tions were obtained without impairment of quality of finished product.
One wire drawing machine was equipped for drawing aluminum wire from purchased rods, and started production during the last half of the year. The production of wire, including wire made into strand, was 3,441,334 pounds. This includes 537,404 pounds of aluminum wire. There was also produced during the year 209,634 pounds of drawn rods, 6,943 pounds of twisted flat wire, and 7,203 pounds of flat wire, making a total wire and drawn rod production of 3,665,623 pounds. The strand production was 6,956,335 pounds.
PNYC 00012658
-9-
L. FBRSOHAKGANBSB PLANT Ferromanganese production at Great Falls was discon
tinued May 13, 1950, and the furnace remained down until October 2, 1950, when operations were resumed. The furnace lining was re newed during the shutdown period.
During the year 1950 the Ferromanganese Plant produced 4,253,362 long dry tons of ferromanganese, assaying 30.05jt manganese, Shipments amounted to 4,220.053 long dry tons.
In January a new record for average daily production was set with a rate of 19.03 long tons per day, the previous record having been established in February, 1949* In February, 1950, the record was again broken with an average production of 19*27 long tons per day.
5. GENERAL The annual report of Mrs. Dahl, our Industrial Nurse, shows
that during the year she made 704 house calls, 332 calls to hos pitals, and averaged 4 hours per day in the North Montana Clinic office, caring for approximately 500 patients and holding 252 baby clinics. In the homes she cared for a total of 420 patients; 115 men, 144 women, 100 pre-school children and 61 school children.
The A.C.M. Club golf course officially opened May 23, 1950. During the season 2,266 members registered for play and there were 449 card guests and 143 guests by fee. The average registration for the season was 571 per month.
pNYC 00012659
-10-
Forty bowling teams participated in the regular weekly schedule during the 1949-50 season, bowling at "Little's Lanes" in the city of Great Falls during the first four months of the year and at the new Employees Clubhouse during the months of October to December. The games bowled during the months of January - April, 1950, totaled 8,400. After the operiihg: of the new clubhouse bowling alleys in October, 1950, a total of 88 men's teams and 16 women's teams participated in league play and during that time bowled 22,149 games.
The new Employees Club was formally opened December 17, 1950, with an "open house" to which all employees, their families and the general public were invited. Approximately 2,000 attended the opening.
A Christmas smoker held immediately after the opening of the Employees Club was attended by 837 men.
The total maturity value of bonds purchased by employees of the Great Falls Reduction Department through payroll purchase plan from January 1, 1950 to January 1, 1951, amounted to 158,900 and the total maturity value of bonds purchased by Great Falls employees of the Anaconda Wire and Cable Company amounted to $1,725 for the same period, giving a total of $60,625 in bonds purchased through Company facilities by the Great Falls employees. The total maturity value of bonds purchased by employees at the East Helena Slag Treat ment Plant during the year amounted to $850.
PNYC 00012660
-11.
Safety and First Aid Activities Tfe regret to record that there were four accidental deaths from arsine gas poisoning in the Great Falls Seduction Department in 1950. Thirteen departments went through the entire year with out a lost-time injury of any kind. The accident rate for the year was 2.14 total accidents in 1950 against 2.20 in 1949* based on 10,000 shifts worked. The serious accident rate was 0.95 per 10,000 shifts worked as compared with 0.94 in 1949* The total number of accidents for the year amounted to 112, compared with 117 in 1949. ' Safety Meetings were held in the various operating depart ments at regular intervals throughout the year. Many worthwhile suggestions for improvement of working conditions and safety were brought up at these meetings. Several new procedures were started in an effort to arouse interest in' safety on the part of the in dividual employees, notably a system of awards for safety sug gestions. The excellent suggestions entered in this competition seem to justify continuation of this program through 1951* Regular weekly trips were made by the Safety and Welfare Engineer to the city hospitals to visit the sick and injured em ployees. There were 3,542 employee visits to the First Aid stations for treatment of original injuries and 167 visits for treatment of illness. Labor During the year 1950 we hired $17 employees and had 942 separations, leaving a net loss of 125 employees.
PNYC 00012661
-12-
Negotiations with the Unions for new contracts were held in the spring of 1950 and new contracts, effective July 1, 1950, were signed, granting wage increases of 51 per hour, plus s o bs added benefits. Further negotiations were carried on in the fall and an additional wage increase of 101 per hour was granted, effective October 16, 1950.
Curing the first quarter of 1950 6$ of our eaployees who are members of the Mill and Smeltermen's Union were scheduled to work on a 6-day basis. During the second quarter this figure dropped to 2$. In the third quarter it increased to 6$ and in the fourth quarter it increased to 49$.
Of the A.F. of L. employees (craftsmen) in the first quar ter 9$ were scheduled to work a six-day week. During the second quarter this figure rose to 31$. By the third quarter of the year it had risen to 51$ and by the fourth quarter reached 97.2$.
6. EXPENDITURES AGAINST APPROPRIATIONS Construction and furnishing of the Employees Club was 98$
completed at an expenditure of $232,422.69. Conversion of present Anode Casting Plant to a Copper Billet
Plant was 98$ completed at a cost of $231,466.32. Spare rotors for booster generator sets at the Zinc Plant
substation were purchased at a cost of $6,620.00. The extension to the Zinc Dust Plant was finished at a cost
of $13,449.50.
PNYC 00012662
13-
Purchase and installation of a hammer mill for oversize
calcine and conveyor from McDougal Roasters to calcine screen
was authorized during 1950, but work was just started.
The extension to the south side of the Zinc Plant change
house was completed at a cost of 119,379.52.
Reconditioning and installation of a secondhand 90-lb. air
compressor in the Zinc Plant Compressor Plant was 96% completed,
with an expenditure of $31,467.12, of which $7,270.00 was second
hand equipment.
Purchase and installation of one Hance No. 2 grinding mill
for copper samples at the sample mill was completed at a cost of
$760.41. Purchase and installation of one Joy Manufacturing Company
fan was 7&% complete at a cost of $625.16.
Construction of a shield around No. 3 roaster was 92% com
plete, with an expenditure of $6,097.29.
Purchase and installation of a 1-H36 Ready Power Unit for
installation in lale &. Towne fork truck at the Furnace Refinery was
completed at a cost of $1,325.39.
Installation of electric hoists for stripping operations
in the Zinc Plant tankroom was 90% completed at a cost of $233,024.95.
Construction of an extension to the Scale House at the Track
Scales was 97% completed at a cost of $3,425.64.
Purchase and installation of one 24" DeBothezat bifurcator
fan was completed at a cost of $6S2.73.
Construction of skimming door ventilating hoods on No. 1,
2, and 3 Zinc Casting furnaces was 60% completed at a cost of
$3,912.36.
pNYC 00012663
-14-
Construction of a shield around Ho. 10 roaster was 67jt completed at a cost of $4,055.25.
Purchase and installation of three DeBothezat bifurcators at the Purification Residue Plant was 4l completed at a cost of $2,330.35.
Installation of a safety gate at floor D of the elevator in the Zinc Roasters was authorized but work had just started on this at the end of 1950.
Purchase and installation of a Rotoclone dust collecting unit for the Brickmasons Department was authorised but work had not started on this by the end of 1950.
Installation of equipment for separate leaching of East Helena fume and a 30-lb. air compressor at the Zinc Plant was 92;t complete with an expenditure of $50,903.83.
East Helena Slag Treatment Plant Installation of automatic bag shakers and construction of one bay extension to the bag house at the East Helena Slag Treat ment Plant were 99$ completed at a cost of $66,550.77. Purchase and installation of a Rotoclone dust separator at the coal dryer of the East Helena plant was completed at a cost of $6,441.92. Installation of an automatic starter for synchronous motor on 15-lb. air compressor was authorized but work had just begun at the end of 1950. Construction of housing around distributing and connecting flues at the East Helena bag house was 27$ complete with an ex penditure of $2,112.17.
PNYC 00012664
-15-
Purcbase and installation of a DraTo cab coolar in the furnace eharga crana at the East Bslana Slag Treating Plant was authorised but work had not begun by the end of 1950*
Conetraction of a new shop and warehouse building at the East Helena Slag Treatment Plant was authorised but work bad not begun by the end of 1950*
Bolling Mills Pepartaents The. following expenditures were wade against appropriations at the Soiling Mills Departments: Purchase and installation of spare 30 H.P. notor for billet furnace fan was coupleted at a cost of #724* Purchase and installation of one hydraulic Arbor Press was 100 coupleted at a cost of $1,513*35* Extension of the fire line to the reel shops was coupleted at a cost of $471*66. Purchase and installation of a pipe and bolt threading machine was coupleted at a cost of $673*34* Extension of the Oxoff Furnace ventilating system was 100 coupleted at a cost of $2,199*35 Purchase and installation of a rod supply stand was 100 coupleted at a cost of $1,187*63* Construction of a concrete runway west of the Bill was cou pleted at a cost of $3*225,31* Construction of an extension to the Inspector's room was 100coupleted at a cost of $1,623*63*
pNYC 00012665
16-
One Model J-45-A automatic micro-weId butt weldor wi purchased and lnatallad at a eost of 4663.42*
Installation of a combustion air fan far tbs billat fur nace was completed at a cast of 61*776*00.
Two weldors J-7-CA and MW ware purebased ami installed at a east of 42,066.74.
A Qraham bant exchanger, storage tanks and beetlag equip ment were purchased and installed at a cast sf 65,10$.37.
A pump for circulating wire drawing compound was purchased and installed at a eost of 63*310*66*
One I.A. pneumatic impact wrench was purchased at a cast of 6304.6$.
One Scott tensile testing machine. Model J-5, was purchased and installed at a cost of 61*295.94*
One Speedmatic saw was purchased at a eost of 670.93* Purchase and installation of a Vatson double rigid strander was 94$ completed at a cost of 694,292.19* Purchase and installation of a Watson Tubular high speed strander was 245 completed at a eost of 66,313*21* Purchase and installation of a Koegol six head rewinder wse 995 complete at a eost of 613,762.66* Purchase sad installation of a combination die stringer end pointer wee 995 complete at a cost of 64,545*61* Extension to the Wire Warehouse was 165 complete at a coat of 47,059*65* Purchase and installation of an Oxoff furnace scale conveyor was 995 completed at a cost of 65*047*32*
PNYC 00012666
17-
Purchase and Installation of automatic dumping mechanism for Ho. 1 Rod Mill coilers was 8l completed at a coat of *3,536.7$.
in appropriation of *4,900.00 for a battery-driven, walk along Tala industrial truck was approved but only *7.92 of this money was expanded in 1950. 7. SLAG TREATI1Q PLAIT - EAST HBLBMA
There was treated during the year 201,131.47 tons of molten slag and skulls, assaying 14.184jt sine, and 20,763.79 tons of cold slag from the dump, assaying 11.8843& zinc, making a total of 221,895*26 tons, assaying 13969jt zinc.
The production resulting was 37,754.89 dry tons of fume, assaying 69.020JS zinc, showing a recovery of 84.069/C of zinc con tent of slag treated.
34,766.93 tons of fume was shipped to Great Falls for treat ment in the Zinc Plant; 16.01 dry tons was sold locally; 1,335*23 tons was shipped to the American Chemet Corporation; 274*36 tons was shipped to Eagle Picher Lead Company, and 946.02 tons was shipped to the Ozark Smelting and Mining Company.
PNYC 00012667
Figures for 1950 Annual Report of Great Falls Reduction Plant
ELECTROLYTIC REFINERY__________________________________________
Ret Production
_____ _
Cathodes Shipped - 1950________________________________
ANODE CASTING PLANT____________________________________________
. Production Refined Anodes - Great Falls_______________
Miami Blister Copper
Treated - Year 1950_______ ________________________________
Refined Anodes Produced__________________________________
Kennecott Blister Copper
I, i o X | f II 3
Treated Year 1950' 4- /f'
D^i
Refined Anodes Produced T-
/* /________________
FURNACE REFINERY_______________________ Net Production_____________________ Inspiration Cathodes Treated - Year 1950_______________ Production - Year 1950___________ Furnace Refinery - Net Total Production -- Year 1950__________
Fmnrac^52i5lllZIZZZIIZIIIlLZZIII Miami Blister Copper_____________ Inspiration Cathodes______________
TOTAL PRODUCTION
SCALPING PLANT__________________________ Total Production - 1950__________ t
SHAVINGS_________________________________ Total Production - 1950__________
Pounds Copper
m a>2 tlL
ti IHv-
fv m
W su n 21L >3
U UH EL 37 fry m
VIV-
/ v f /*/ 03 /v f o /
Hi VM VI v' A
I% m ng
m tn ten. 33 STb
hi 1 9 9 in IV <?>/ i I 4
nL I 2 f gvg
L 4*0 44i"
V U o 44/
PNYC 00012668
Zinc Casting Plant - Year 1950 Summary of Treatment and Production
Pounds
Annual Report - 1950
leturnable Lead in Process
.-
:
_ iC
Qn-Hand in Process Returnable Lead. January 1950___________
Pounds Returnable 3f1 t> 6 o
Delivered to A.S. k R. Co. East Helena - Jan. - Dec. Incl Great Falls Zinc Residue
Great Falls Lead Dross
if UOt. ? If
Jfi
Aha66nda Zinc Residue Anaconda Lead Concentrates
$ yoi Hff
n in flo ,
Anaconda Lead Dross
i nr
Total Inventory and Deliveries Refined Lead Returnable at Omaha On Hand - In Process Returnable Lead - December 31. 1950
7 rv IfV
IS L } ? V i Uf 7 to.
Refined Lead Returned by A.S. & R. Co., at Omaha, Nebraska and Sales by Anaconda Sales Company
Returnable Lead - Refined r*
On Hand - Refined Returnable Lead - January 1. 19^9
Returned bv A.S. k R. Company
Total On Hand and Returned
Deliveries bv Anaconda Sales Company
On Hand - Refined Returnable Lead - December 31. 1950
n f 7/ 0 PV-
Hv V
->n rv Vi S
H rig
bn m
-
PNYC 00012670
cigurea tor 1950 Annual Report
Proa-action
Tons Residue
fotSi~':........ "...... ........ .........gi'ifo-n:
Residue Shipments To
Total
A.S. & R. Co. East Helena
8IH <>7,7L___
G.F. Purif.
Residue to Ana Cu Plant
Bag House Fume Sale
f 7/-
Metals Produced Residue Beta Naphthol Residue
;G.F. Purification Cu.
Residue
Slag Treating Plant Bag House Fume Sale
'"Zinc Plant Production
for 1950
Total T pns
f 1 7 To a.
-
iLead
Vo iyd
? nr Vi' f>U V*?f
f 1L
1m
VO W ivy
CoDDer
Silrer
/ Soo VHr 177? 00 *f os
Gold G-/v ur
V foi ru. If sir n.
Slo Hi
L Ht>}
UH HI /V iri itr
PNYC 00012671
Figures for 1950 Annual Report of Great Falls Reduction Plant
LEACHING AND ELECTROLYZING
Net Production - Cathodes to Casting
For Zinc Dust - For Leaching Plant
For Zinc Dust - For Purification Residue Plant
For Zinc Dust - For Cadmium Plant
ft' 9 fi' i -- /-* i/f 1^ Atl
-*
Cathodes - For Commercial Sale
Ck St* <r ff * 4
$ A 10 +*t
' ** C
Cathodes for Leacnine Plant
OJ S/0 ij
TOTAL CATHODES PRODUCED
Zinc in Beta Naphthol Residue to Anaconda Zinc Plant
Zinc Pounds
)ffg
n pv rj?w
3 4 r/ r-K
/ 0 W P4 ???
J-V3 X-t O
33/ 33/
, --
PNYC 00012672
Total
Figures for 1950 Annual Report of Great Falls Reduction Plant
Cathodes Cathodes Treated Treated
/ft
Cathodes Treated
n HU >*7.
?e? S7f. 33/ Hi
Casting
Plant
-Total
1 1
Pounds Zn Dust
TV? b>3.
1.. . ..
Total
Jit. Falls O.F. Toll Purchased
Net Slabs Net Slabs at Finger Production Production Company toll
Hi ?77 K>i
2H m ni il 1L --
Net Slabs & Finger
On Hand l/l/50
Total
Produced
Wf /7W Va'i -- 'fn
Fr>r
/7v VO 4 - On Hand 12/31/50
-- Treated
lor AXJflJ 2
1 HH or 331 3}l wf 33 2 3V
1 '
3U to1 // 5
Dry Weight
.Total
Zn Dross to Roasting Plant
II if V}o
Zn Dross
to Leaching Plant
Zn Dross
for Local Plant
In Casting - Company
In Casting - Toll
hi Sh
^
In Leaching
Hi! >)
>3H `to 7 27` two O i
-Total
PR0DDCTI0N DROSS
Dry Lbs.
Zn Lbs.
X1 3V 3 in n 747 121
For Shipment AS Co. .For Local Sale For Retreatment
No tl
XI 3tf 3^2. n 747 121.
Dry Weight
Total
Zn Oxide to Roasting Plant
Zn Oxide to Leaching Plant
X nu (01
Zn Oxide for Shipment
1
Total.
PRODUCTION OXIDE
Dry Lbs.
Zn Lbs.
~U12f fi>. Xoltl, vW.
For Shipment A.S.Co. For Retreatment
l 1 ft m. 1 oil.
PNVC 00012673
Figures for 1950 Afinual Report of Great Falls Reduction Plant
COMPANY
Slabs - Anaconda Electric - Company
Slabs - Hieh Grade - Company
Slabs - Intermediate No. 1
Slabs - Anaconda S.C. No. 1
Slabs - Brass Special
Total Company
TOLL Slabs - Special Zinc
Slabs - Prime Western Interlocking
Slabs - High Grade (Special Zinc)
Slabs - High Grade
Slabs - High Grade (Purchased by Anaconda)
Slabs - Special Intermediate No. 1 t> It * o * t/
Slabs - Intermediate
ft
tt
K. It it
i|
Slabs - Special Zinc Alloy ft ft
h ,t (S
Slab3 - Prime Western
Slabs - Special Intermediate
Slabs - Brass Special
Slabs - Special Zinc Alloy - G.D.B.
5 labs - f*1 / *' *-' **>1
/g
Sluts -
Slats-
U/t.1,
fif/oJ./lJ U.S-S'* *
ii
Total - Toll
i
TOTAL NET PRODUCTION
Zinc Pounds
n 1 *1 /3V
_11 111 10 in III
.
SH Ill
t 0 59 ooo
m 3 W OOI
V lof iio 7 y 53 foO X Sou
i<n m Vo o 60 0
l 6'7 / 0/0 oiS
/?? 9^/J U>3 Ilf
vn n v vo 6
PNYC 00012674
Figures for 1950 Annual Report of Great Falls Reduction Plant
ZINC IN CONCENTRATES RECEIVED
Anaconda Concentrates Bag House Fume Montana Purchased Concentrates Montana Toll Zinc Salt Lake Salt Lake - Toll Zinc Nevada Toll Zinc Arizona - Toll Zinc Colorado Colorado - Toll Zinc California New Mexico Washington Washington - Toll Zinc Texas - Toll Zinc South America - Toll Zinc Mexico Toll Zinc
/*-/ /off '2rt~>C ~j(C A C f ^ ' -/fit
j d j h Or / //
/o/o I
Zinc Pounds ~ iv\nroIiZ2
__91 DL rrv
W4
/ 4 0 V Y3/ V ?/ .
l> *44 7YV . 7wo Y .
47 //r ffv .
Lff ?VO > 037 P/v
i_ M i>* -ii
/-? vr O'? 44 3
1 ar .
r r #
if /t
is *7 /V .
?V *
_IJL 4/4 17</ . 1 n
r v*o /J7 /v /*7 .
i Vff III
J
V fv
V f4
/ VO Vo
II V I
.
'I'HS,
l0' 00-
pNYC 00012675
Figures for 1950 Annual Report of Great Falls Reduction Plant
Anaconda Zinc Concentrates, -T7.0 <f 6 HI
Anaconda Zinc Calcine
Anaconda Purification Residue -
Purchased
American Zinc Company of 111. - Zn Concentrates - Toll
Combined Metals Reduction Co. - Zn Concentrates - Toll
Eaale Picher Minina & Smeltine - Zn Concentrates - Toll
Federal Minina and Smeltina Co. - Zn Concentrates - Toll
Sr+yte+S
- Bisr***
t --
2-*rG0*r * ~7m //
V;Itr Gi ate -and Pens
''
International Minerals fc Metals - Zn Concentrates - Toll
PhiliDD Brothers. Inc.
- Zn Concentrates - Toll
U.S. Smeltina
6/ *f
C*
f d'/lrme'f- to'fw a / '< /
- i-.t So ri 4 / *, rC-rt -- /oos/* "2-"^ c
e
tf
East Helena Fume Tooele Fume
Dry Tons Treatment
fH Hi ? irH J crl> if
M Wo L i HI cU 1
/ 7 to HI / nr 7? to VS* 7 ir
Hi V7 2 lu S ygf tl 7 ? ir it / / ei yi _ V7 o o
3H t n- 0 & HH
PNYC 00012676