Document geb95KV8Jog9N086O8OdKyQ

(conoco) interoffice Communication Distribution =rom J. W. Ware G.Me August 22, 1980 2,,Blect Railcar Loading/BL-41 0 Meetings The subject meetings have been completed with the appropriate personnel from all shifts. The attachments reflect information collected during the meetings which will hopefully clear up some misunderstanding with respect to breathing air use on the rack and' lead to the improved operation of BL-410. Please let me know of any further problems or questions which come up. si 'Xi O-w J. W. Warei is CC: C. Landon C. Kroske K. Cash C. Bui 1er C. Brown E. Gould J. Vickers D. Ross R. Fox C. Turner M. Powers R. Young P. Ceasar B. Wilburn M. Fontenot F. Broxton L. Barron B. Bauer A. C. Hughes CC* 004593? VINYL LOADING BREATHING AIR REQUIREMENTS Task Breathina Air Breathing Air not--Peer1 d Req Remove plugs X | Break thermowell cover i Remove sample tap plug X X Remove diostick cover X Put nipples in (install new teflon tape if needed) X Hook up loadinq hoses (good O-rnnqs) X Pressure up w/ N? for leak check X Check O2 at samDle tap i Stare loaning X X i Car nears correct outage-sample it X i Car reaches correct outage X S/D loading X Take final 0? on vent arm X Push liquid into car w/ N? X Purge liquid line into car X Vacuum/pressure purge lines X Block off loadinq hoses X Depressure loadinq lines X Disconnect hoses X Remove nipples X Install plugs w/ new teflon tape X Shut off breathing air X CCR 000045933