Document geMqn0dBkwwe9o7R7YEgBNn9

/ \ cT&tfaoducZi a*ct Gie*mca& mV inc* ESCAMBIA PLANT INTEROFFICE MEMORANDUM To: R. E. Jones From: Re: E. A. Primeau PVC Expansion Report VFCE 363 Status Report October, 1976 Dote: 1! November 1976 Copies; A. R. Adame J. T. Barr T. L. Carey M. B. Cobb/B. M. Benigno R. Fleming L. S. Forester W. T. Johnon/D. J, Deville A. H. KapLan A. K. McMillan D. W. Pierce/J. P. Connors W. R. Schofield D. B. Sparrow COST SUMMARY Total Authorized Funds Current Forecast Variance Current Forecast Previous Report Forecast Change Since Last Report $11,222,000 11,216,916 $ 5,084 $11,216,916 11,212, 373 $ 4,543 COMPLETION DATES Per Original CE Date Current Estimate Date Prior Month Report Date 31 December 1976 15 January 1977 15 January 1977 Engineering and construction work continued on the project. Through 30 October 1976, a total of $8, 517, 583 has been spent or committed to the project as follows: AP00041972 R. E. Jones PVC Expansion Report 11 November 1976 Page Two ITEM EXPENDITURES COMMITMENTS Equipment Piping Foundations (materials) Electricals Field Construction APCI Engineering Outside Engineering Outside Drafting Labor $ 3,865,839 727,632 59,559 596, 151 46,444 465,599 383,012 413, 132 1,528,069 $ 357,771 58,709 _ 4, 675 5, 540 _ - - 566 Subtotal $ 8,085,437 Total Spent or Committed Estimated Escalation Outside Engineering and Drafting (Est, October) $ 427,261 8, 512,583 4. 885 25,000 Total Estimated Commitments Total Project Authorization $ 8,542,583 $11,222,000 Uncommitted (Estimated) $ 2,679,417 Based on the current cost forecasts and the latest critical path review, the PVC expansion project should be completed and ready for startup early in January, 1977, and should be completed at budgeted costs. PROJECT WORK A. Purchase Orders Purchase orders totaling $174, 533 were issued during the month of October. Major expenditures were in the areas of welding supplies, mis cellaneous piping materials, valves for the chemical cleaning unit, electric materials, insulation and supplies required for the instrument installations. B. Civil Construction 1. Work continued on the installation of the dryer and dryer building structural steel. Cyclones are being installed and foundations are being prepared for the centrifuges and dry resin, screens. 2. The dryer control building pad was poured and work was initiated on the erection of the building. AP00041973 R. E. Jones PVC Expansion Report 11 November 1976 Page Three 3. Pump foundations were poured in the chemical cleaning area. 4. Two DMF storage tanks were relocated to their project location. C. Equipment and Piping 1. Work continued on the installation of the recovery system equipment and piping. All of the condensers were installed as well as the low temperature chiller for the vent system. 2. AU major piping work is in progress with one pipe crew working on top of the reactor, a second crew around the bottom of the reactors and the third crew working on utility and recovery piping. 3. Several problems were experienced with the resin transfer system from the hold bins to the overtrack silos which are being corrected. Even with the problems, we were able to transfer resin to six of the eight overtrack silos for storage. 4. Engineering continued work on the drawing for the piping revisions in the existing polymerization building. The drawings are currently being reviewed and prepared for issue. D. Instrumentation All of the pneumatic tubing from the rack junction boxes to the central control panel have been installed and the instrument fitters are currently extending the leads to the field instruments and field panels. Most of the control valves have now been installed and are ready for instrument leads. Computer program development work is as follows: 1. The CRT programs have been revised by Taylor and now appears to be functioning properly. 2. Considerable time was spent during the month revising the log programs. These modifications are presently being checked. AP00041974 R. E. Jonea PVC Expansion Report li November 1976 Page Four 3. Programmers at Taylor are actively working to resolve problems experienced in the scanivalve programs, pulse counter and control block configurator programs. We are pushing to get these problems resolved so that the required systems tests can be carried out without inter ference from program development. E. Chemical Cleaning The shutdown required to upgrade the chemical cleaning unit has been scheduled to start 8 November 1976. The work will require that the unit be down until early January 1977. EAP:ms Attachme nts E. A. Primeau I AP00041975