Document gbmmrggJdODQmOR1kk5028ZdJ

PLAINTIFFS LX111 HIT Inler OHtee Mr. P. Boerger Manufacturing Manager Sheldon Road Plant Personnel and Organization Staff September 9, 1982 co V. 0. Atkins J. . Fisher V. G. McGrutber 0. Schidlovsky, M.D. J. E. Tennant Subjects Dust Samples, Aebeetos Evaluation - Sheldon Road Plant References Letters same subject attached - April 19, 1982, April 14, 1961 and April 6, 1981 Ae requested by Mr. V. G. Atkins, Sheldon Road Plant Safety Engineer, an induetrial hygiene evaluation vas made of the former beater housing bit* room for residual asbestos dust. This evaluation vas requested because of plans to use the room for storage and inactive file maintenance. Asbestos has not been used in this room Bines the middle to late 1970s. Based on our study of March 6, 1981 which found no airborne asbestos, but asbestos-laden settled dust, recommendations were made in our letter of April 14, 1981 to remove the residual asbestos in accordance with applicable OSHA standards. Instead of complete compliance with our recommendations, a compromise plan vas worked out under which the plant would remove the ventila tion ductwork, secure the asbestos silos, post warning signs, and use the room only for dead storage. Subsequent to the implementation of the plan, settled dust samples were taken and presumptive tests made which were negative for asbestos. It Bhould be noted that the room vas not thoroughly decontaminated, but since asbestos vas not identified in the settled duet found, there was no scientific evidence to base enforcement of the original recommendations given the oost involved in carrying out the recommendations. Settled dust samples taken on July 28, 1982 at locations similar to those of our previous evaluations indicate asbestos-containing settled dust is present at two of the three locations on the second floor of the room. These samples were analyzed using the NXOSH quick-screening test for asbestos by the Ford Industrial Hygiene Laboratory and confirmed by Clayton Environmental Consultants using X-ray diffraction and polarized light (attached). Sinco airborne concentrations of asbestos have not been demonstrated at signi ficant levels and are not probable, we understand the reluotance of the plant to comply with our recommendations of April 14, 1981. However, based on the most recent samples taken, it would appear that residual asbestos may be detected in settled dust on occasion until a thorough decontamination of the mix roow takes place. 8006 1822 SCF-FORD-3234 PRODUCED BY FORD Mr. V. Boerger -2- September 9, 1982 Although the use planned lor the mix room vill probably not expose employees to eight-hour time-weighted airborne asbestos concentrations greater than present standards, it would appear prudent, sinoe asbestos is a carcinogen, to formulate a plan to settle this problem permanently and return the room to uovastricted use. Further, it may be of value to note that the Canton Forge Plant, while not demonstrating significant airborne asbestos levels, has elected to remove aebeetoe pipe lagging that is falling to ths floor and accumulating in a manner similar to tha Sheldon Road Plant* The coBt of the project of more than $100,000 has bean approved by Senior Management. Therefore, we request that an action plan ba formulated around recommendations made in our letter of April lb, 1981. Jb Attachments H. B. Lick, Seniob Industrial Hygienist Industrial Bygione A Toxicology Department Employe Health Servioes 8006 1823 PRODUCED BY FORD CLAYTON ENVIRONMENTAL CONSULTANTS, INC. Results of Analyses for Ford Motor Company . Job No. 15386-782-LA Lab Numbey 238954 238955 238956 238957 238958 Sample Description * HBL 1795, Bulk HBL 1796, Bulk HBL 1797, Bulk HBL 1798, Bulk HBL 1799, Bulk Asbestos Composition i No forms of asbestos detectt ' `'St chrysotile *6\ chrysotile No forms of asbestos detecte No forms of asbestos detecte Analysis performed by x-ray diffraction (XRD) and polarized light microscopy (PIM) . svtfte ucATioaa turtle EuiuMeK 4dSl A Tuaft Hfcc.lt & 6M ieuTrt wfcbC Hfcl. HVJ ,J HUT T* fcueUfcT*. fcOSi-B tt&i. ITU l4f Fwoo'fl StLi hlfiAR. T>1\ tW UfffWft. St to NBAfc 8006 1824 PRODUCED BY FORD