Document gbm2njZmw9r650Mmeaj7EqQgJ
AMERICAN VP OIL STANDARD BOILER
INSTRUCTION MANUAL
PACKAGED OIL HEATING UNITS
IMPORTANT -
SEE INSTRUCTION MANUAL FOR PROPER LOCATION OF BOILER AND REMOVAL OF CRATE
NOTICE TO INSTALLER AND OPERATOR THIS BOOKLET MUST BE AFFIXED ON OR ADJACENT TO THE HEATING EQUIPMENT.
FORM NO. 32425-06
PLAINTIFF'S EXHIBIT
SERIES NO. 1B-J2
01355
To the homeowner: The American-Standard holler which has been Installed
for you Is the heart of your hydronlc heating system. Since the performance of your system dependB upon the boiler, it has been designed to operate at maximum efficiency. Advanced design, precision engineering, and modern manufacturing techniques are combined in this product to provide you with comfort at a low operating cost and with a minimum of maintenance.
The boiler sections are cast in Iron--a metal resistant to corrosion, especially in a closed system. If this boiler is part of a new installation. It is Joined in a closed system--l.e., normally water Is neither lost nor added-- and should"not be drained. The replacement of water adds oxygen to the system; corrosive action continues until that oxygen Is consumed; but, certainly, the boiler should not be fired without an adequate supply of water. On the other hand. If the boiler Is not used during the winter months, it must be drained to prevent damage caused by freezing.
By following the suggestions contained In this manual, you can assume your boiler will function properly for many years. Should any problem arise, contact your nearest American-Standard contractor, whose name can be found in the "yellow pages" of your telephone directory.
AMERICAN-STANDARD
01356
1
The VP Packaged Boiler comes to you pre-assembled; the installers major responsilility 'vill be in locating, connecting accessory parts and performing the actual hookup.
01357
z
GENERAL INFORMATION The VP Packaged Boiler has been tested and approved by I=B=R as an oil-fired unit. The VP Packaged Boiler comes with three, four or five sections. I=B=R ratings and data are included in Table I.
LOCATING BOILER FOR INSTALLATION The boiler should be located on a level floor as near the chimney as possible. Be sure that sufficient space is allowed at the front (at least a 20" clearance) to allow for removal of the water heater. Cleaning space (approximately 24") should also be allowed at the right side of the boiler. If a water condition exists in the basement, or it has been necessary to waterproof the basement floor, the boiler should be mounted on a concrete or hollow tile base (preferable height of 3"). UNPACKING VP PACKAGED BOILER Locate the boiler near its final installation site before removing its crate. Unpacking should be accomplished as follows: (See Figs. 1 and 2)
L Unfasten all crating wire at the corner of the crate. 2. Remove nails fastening crate sides to top and bottom of crate. 3. Lift off crate top and unwrap crate side from crate base. 4. After removal of the plastic bag, remove and discard the short nipple
from the flow tapping at top of boiler. 5. Remove box containing draft stabilizer, relief valve, and miscellaneous
parts.
EXPANSION TANK LOCATION Care should be taken in locating the expansion tank. It should not be set in a cold or exposed space. If the pipe to or from the tank were to freeze, serious damage could result. It is also preferable to use a minimum of horizontal run piping to the expansion tank to facilitate free communication from the boiler to the tank.
01358
I=B=R
BURNER
I=B=R
TANKLESS
GROSS NET INSTLD. TANKLESS HEATER
2
N2
2W
X<
II Ct--IIQ<
22 s O 2
>< a 2 S2
X u
a 2s ha <a cw
m m in rH pH rH XXX 2CZ X) 03 CO XXX
oo oo oo
mm pH pH
I2 XX XX
_
X 00
W\ III nnn
\' xx ii
t
X X
in
irnH rH
X
X;
2 00
pH
XX
00 CO
to to
X OC
22
Hm <s a2 X2
X a E-
SX 1X
s a~
<
X
E-
X^ XX
E- X
22
O
Q
2 X 2
2
2 N N O
2
>* H pp rv
UX
<a
a to
< u
aX o
22 XX 22 CO
X 22 2O
C2
O2 22
X 22 OO
c-
O O O 1-1 rH 2 x co co co
o o c~
O X rH OrtM
rH rH 2
XX
t> X
Hf <) 22
O. O. O.
Xoo
2 x *3*
2 22
oo
o
h-
22
XXX 222
OOO XXX
\w
O OX
O 2X
222
X 2 CQ
OO XX
w
OX XX
22
XXX
O 2X
*'
pH rH rH
o
X c22
pH rH pH
(h'T ^Ch TCJh< 1 0i0 M1
D2Q
XOo
2XC
pH rH pH
111 aaa
>>>
XX 22 XX
X1 x1 aa
to- o
22 11
aa >>
X -<
X x 2
O Hjl
O CH 2
XX
o o
XX XX
os cc oo
f- Ch \\
OX OX XX
XX
O X
XX
XX 22 XX 11
XX a oo
XX XX 11
aa >>
X
2 (a)
H eater R a tin g s are com m ercial ra tin g s - g a llo n s per o f w ater heated from 40F to 140F w ith 200F b o ile r w
a >
0) a>
+>
<ww
3 C Sh
2
2 a) E2
X
2
<H
3 (A
0)
XS
H->
>>
u u
CC
V
rH rH H
(A u
0) P
ed
0> as
cn
(A
0) pH
.* c CC H
x:
H-> p*4
?
(MA
0) rH pH
0 m
w H zO
01359
3
1. Side listeners 2. Nails
FIG. 1
01360
1. Remove four nuts securing boiler to the crate base from below. Remove bolts on left side. Bolts on right side can then be pushed up inside the jacket where they will stay. This is important to prevent damaging jacket when removing boiler from base.
FIGURE 2
4
2. Tilt boiler to rear and to right.
3. Pivot boiler on right rear leg, rotate 90, and lower to floor.
4. Tilt boiler so that crate base can be completely removed.
(The above procedure is quite simple and can be very easily accomplished by two men. In an emergency, it can be accomplished by one man with comparative ease).
5. After the boiler is removed from the crate base, it can be easily walked-to its final location.
01361
5
CHECK-OFF PARTS LIST FOR VP PACKAGED BOILER Although the VP Packaged Boiler comes to you assembled, it is necessary to check certain accessory items prior to final hook up.
Accessory Box Draft Stabilizer Relief Valve 3/4" x 7-1/4" Pipe Nipple 3/4" Tee 3/4" Drain Valve Oil Burner Nozzles Circulator Flange Gasket and Bolts Thermostat 3/4" Street Elbow Draft Tube Sleeve Sleeve Insulation Instruction Sheet
Oil Burner Box DH-F Oil Burner
ELIMINAIRE FEATURE This VP Boiler makes use of a special front section with a 1-1/2" supply tapping incorporating the "Eliminaire" feature (See Figs. 3 and 4). The "Eliminaire" is a unique, built-in air separator which prevents air from being transmitted to the system and directs the air to the com pression tank or vent. This eliminates the need for external air sepa rators such as dip-tubes or unlined accessories. The "Eliminaire" also assures positive air separation, thereby insuring proper system per formance .
01362
(WATER HEATER HEAD)
B-----(BLIND FLANGE)
CONTROL TAPPINGS
LOCATION
.
SIZE OF TAPPNGS
CONTROL USED
A *4
RELIEF VALVE
LIMIT CONTROL
OR
B
\ COMBINATION LIMIT AND REVERSE ACTING CONTROL
(FOR INSTALLATIONS WTTHOUT
TANKLESS WATER HEATER)
C\ DK
IMMERSION CONTROL DOUBLE THROW SWITCH
IMMERSION CONTROL RELAY COMBINATION
E
\ AUXILIARY LIMIT CONTROL (WHEN REQUIRED)
FIGURE 3
FRONT VIEW-SHOWING CONTROL TAPPINGS
,-------TO CONVENTIONAL EXPANSION
ELIMNAIRE AND PPING FOR FLOW PIPE
Ale RELIEF VALVE
FIGURE 4
O') 363
7 INSTALLING THE VP BOILER
After moving the VP Packaged Boiler to the desired location, final installation procedures should be accomplished as outlined below.
1. Hook up piping. If jacket extension is to be used, make sure that piping connected with the hot water heater and the boiler return piping to the circulator is arranged to pass through the opening in either the top or sides of the jacket extension (follow assembly instructions accompanying same). (See Fig. 5).
2. Screw drain valve into tee at lower right front of boiler.
3. Install relief valve and fittings in top of front section (See Fig. 4), making sure the direction of the discharge is away from controls.
4. The upper flange of the circulator should be installed on the return piping, then bolted to the circulator flange. Be sure that flange gasket is not damaged, and that the flange bolts are drawn up equally tight.
5. Install the flue pipe and draft stabilizer using instructions provided with stabilizer. The flue pipe should not extend beyond the inside wall of the chimney flue. Horizontal runs of flue pipe should be kept at a minimum with approximately 1/4" pitch per foot maintained.
6. Run electric service line from switch (not furnished by A-S) to the control mounted on built-in water heater, or for boilers without water heater, on water heater opening cover plate.
7. The Cad Cell lead should be taped to the conduit assembly extending from control to burner to prevent snagging or damage. (See Pg. 1).
8. Install room thermostat. 9. Make all electric connections according to wiring diagram. (See Fig. 6).
10. The boiler is now ready to be filled. THE FILLING PROCEDURE IS AN IMPROVED METHOD, AND SHOULD BE FOLLOWED AS INDICATED ON FIG. 7.
11. Boiler is now ready for service.
01364
e
FIGURE 5 Space Requirements For Boiler Piping
01365
9 01366
24 VOLT -hermostat
10
GENERAL SCHEMATIC SHOWING WIRING TO COMPONENTS
PACKAGED OIL BOILER WITH WATER HEATER WIRING DIAGRAMS FOR CONSTANT IGNITION
01367
Figure 6
11
to
z UzJ
2
so
o
o oz
z $
oz o
X to
2 Ul
X
o to < X
UzJ
Ul o
PACKAGED OIL BOILER LESS WATER HEATER WIRING DIAGRAMS WITH REVERSE ACTING CIRCULATOR CONTROL AND CONSTANT IGNITION
FIGURE 6 b
01368
G
j----
H
MS V, 60 CT-------------
*4
INTERNAL SCHEMATIC AND CONNECTIONS FOR R8I82E CONTROL
GH
INTERNAL SCHEMATIC AND CONNECTIONS FOR R8182F CONTROL
PACKAGED OIL BOILER LESS WATER HEATER WIRING DIAGRAMS WITH REVERSE ACTING CIRCULATOR CONTROL AND CONSTANT IGNITION
Figure 6
01369
13
SET N0.5-Z 'ADD ON" ZONE CONTROL SET FOR USE WITH HONEYWELL R-8I82D CONTROL
yO-cPoy-1--O^O-L-
I__ ----J ENCLOSED
SWITCH
HOT
LINE GRD.
rt
FF
99
*2
THERMOSTAT
HONEYWELL R-8182 0 COMBINATION CONTROL
66
TT
-O-i
THERMOSTAT
HONEYWELL R-84SA RELAY
6
THERMOSTAT
HONEYWELL R 845 A RELAY
9VM
-JUMPER
3--3
*? <9 gyp
JUMPER
LOW VOLTAGE
FLAME
DETECTOR I- ST 15401
IGNITION I TRANSFORMER!
MI
CIRCULATOR
OIL BURNER B
SCO
aRCULATOR
SCI6 6
aRCULATOR
01370
14
r +F OIAPHMGM type expansion tank IS USED AUTOMATIC VENT VALVE^ SHOULD BE INSTALLED IN THIS LOCATION WATER SUPPLY
3E TURN
Si ONE
i
ZONE
2
ZONE)
P^B AlANCING
| COCKS OR | ZONE VAiJES
I
CIRCULATOR
SUPPLY TO SYSTEM
FOR MULTIPLE ZONE OR CIRCUIT OPERATION
on A SINGLE CIRCUIT job
BALANCING COCKS ANO ZONE VALVES NOT NEEDED
: 'I LLING
FIG. 7
i- following procedure should be used to fill a series loop Heatrim System (See Fig. 7).
tib ji i
i. hc-
10.
Close all zone valves except the one for the zone to be filled with water and purged of air. Open the drain valve on the boiler. Open the fill vslve. Close the purge valve. Open the relief valve. Open the valve :o the second zone to be purged; then close the first. Repeat this step until all zones have been purged of air and filled with water; but always have one zone open. (Zones are purged and filled when water can be felt in the pipe at the end of the zone). Close the drain valve. When water appears, release the lever on the relief valve, allowing it to close. Continue filling the system until the pressure gauge reads 12 psi without heat or 25 psi at 200 F. ; close the fill valve. Open the purge valve.
Following the corr.oletion of the installation, a thorough check should be made of the entire hydronic system to locate possible leaks.
MOTE:
For a sinsle loop heatrim system no additional vents, cocks, valves or ot er accessories are required except: When tankless heater is used and eatnrn is above the ooiler outlet, install a flow-check valve to prevent gravity circu ation.
- VTIOX: I: a vai.e of anv tvpe is installed m the piping leading to or from the pm :;:5r t W A T Tt tq AT.WAYS OPEN WHIJ ~ THE BCIL-F
01371
15
CARE OF BOILER WHILE IN OPERATION ON A CLOSED HOT WATER SYSTEM, THE PRESSURE MUST NOT EXCEED 30LBS IF IT DOES, IT MUST BE RELIEVED IMMEDIATELY AND THE CAUSE OF THE FAILUR OF THE THE RELIEF VALVE INVESTIGATED AND CORRECTED: OTHERWISE, PRESSURE MAY BUILD UP AND CAUSE DAMAGE TO THE HEATING SYSTEM.
FIG. 8 The homeowner should periodically check the readings on the gauge, located on the front of the boiler {See Fig. 8). The lower scale indicates the water temperature. That temperature should never be allowed to exceed 250"F. The boiler is designed to operate with a normal maximum water temperature of 230"F; but during mild weather, the system operates with water temperatures considerably below the maximum. The upper scale indicates the pressure within the system and should not exceed 30 lbs. In a closed system, the boiler and piping are entirely filled with water except for a cushion of air in the upper portion of the expansion tank. When the water is heated, it expands, compressing the air in the expansion tank. If, for any reason, this air were completely displaced from the tank, there would no longer be a cushion; an increase in water temperature would cause a corresponding increase in valume; pressure would force the relief valve open to discharge the excess volume. To correct such a condition, the expansion tank must be drained enough to permit the tank to fill with air. Clean boiler surfaces at regular intervals. Do not draw water from boiler while in use. When adding water while boiler is in operation, DO NOT OPEN SUPPLY VALVE FULLY, BUT ADD WATER SLOWLY.
01372
16
C ARE of boiler while not in operation At the end of the heating season, clean boiler surface thoroughly. Access to flueways may be gained by removing the upper half of right-hand side panel and then removing the cleanout door. The access panel may be removed after unscrewing, by lifting and swinging out the bottom of the panel first, using the two finger holes provided in the panel. Spray flue surfaces with light lubricating or crankcase oil using gun with extended stem so as to reach all comers. When replacing cleanout door, boiler putty is necessary for sealing. Lubricate circulator in accordance with lubrication instructions on decal. Clean and remove flue pipe where feasible. Keep system filled with water; in other words, DO NOT DRAIN BOILER, IF BOILER IS NOT USED DURING WINTER, IT MUST BE FULLY DRAINED TO PREVENT DAMAGE CAUSED BY FREEZING.
01373
17
CONSTRUCTION DETAILS Three different cored section castings are used to make up the VP Packaged Boiler (See Fig. 9).
1. Front section with 1-1/2" supply tapping, and Eliminaire" (5-3/8" thick). 2. Back section (4-3/4" thick).
3. Center section (6" thick).
The wide center section is used in order to give the boiler sufficient length for the combustion chamber and to provide the necessary water content for satisfactory operation of the tankless H. W. S. coil.
All control tappings and domestic water heater openings are provided on the front section (See Fig. 10).
PLATE WORK
Burner Plate and Door These are integral components and made of steel. A refractory radiation shield is used to protect the burner plate from heat.
CANOPY An aluminized sheet-steel canopy is provided. Smokepipe sizes are as follows:
No. of Sections
3 4 5
Smokepipe Size
7" 7" 8"
INSULATION
The entire jacket is insulated with 1/2" Fiberglas. An additional 1" of insulation is used on the canopy.
01374
18
NUMBER OF _ DIMENSIONS_____ SECTIONS A B 9. 4p
4 22 '4 * ,5S
5 !2B|
4
FIGURE 9
01375
19
FIGURE 10 Although the basic boiler remains the same, the differences exist in the wiring procedure with or without water heater (See Fig, 6).
01376
20
- BL'STION CHAMBER - VP Boiler has a one-piece precast Refractory Combustion target wall rK c:ailv desigr.rd for maximum performance and efficiency. VI L BURNER 7Model DH-T oil burner is used with the VP boiler. This burner is especially : signed with a conventional flame-retention head to give maximum performance .mu efficiency ir. :he VP boiler. CONTROL5 Controls for the VP Packaged Boiler are conventional.
jacket
Jacket design for the VP hckaged Boiler is conventional as with other A-S boilers.
01377
CONSUMER PROTECTION - WARRANTY
American-Standard products normally reach owners or consumerusers through an industry channel of distributors and plumbing and heat ing contractors. Experience has shown that claims of defects in our pro ducts generally relate to abuse or to other damage which occur after our sale and are not our responsibility. Since determining proper responsibility requires local inspection, our warranty (set forth below) extends only to our direct buyers; distributors are best equipped to obtain the facts un derlying claims, to place responsibility where it belongs and to recom mend /handle repair or replacement.
American-Standard warrants only to its distributors and other direct Buyers that it will furnish by freight a replacement for, or at its option repair, any product of its manufacture or part or portion thereof, proved to its satisfaction to be defective in material or workmanship under nor mal use and service within one year after installation.
THERE IS NO OTHER WARRANTY, EXPRESS OR IMPLIED. IN CLUDING NO IMPLIED WARRANTY OF MERCHANTABILITY OR IMPLIED WARRANTY FOR FITNESS FOR A PARTICULAR PURPOSE AND AMERICAN-STANDARD WILL NOT BE RESPONSIBLE FOR ANY DAMAGES WHATSOEVER NOR FOR LABOR OR TRANSPORTA TION EXPENSES RELATING TO SUCH REPLACEMENT OR SUCH REPAIR. NOR WILL IT BE HELD RESPONSIBLE FOR WARRANTY ADJUSTMENTS COSTING MORE THAN THE PRICE OF THE PRO DUCT TO ITS DISTRIBUTORS AND OTHER DIRECT BUYERS.
Goods of other manufacturers sold by American-Standard are not warranted unless accompanied by an express written warranty, but the Seller will endeavor to secure for its direct Buyers the benefits of war ranties extended by such other manufacturers for such goods.
American-Standard is proud of its record for product quality and for fairness in handling warranty matters; and, if an ultimate user of our products should feel our warranty system described above does not work fairly in his case, he should write the Office of the President, Director of Consumer Affairs. U. S. Plumbing/Heating, American-Standard, 40 West 40th Street. New York. N. Y. 10018.
DEALER'S NAMEr________ ADDRESS:______________ TELEPHONE NO.:______ DATE OF INSTALLATION:
AMERICAN STANDARD
PLUMBING & HEATING
P. 0. BOX 2003
NEW BRUNSWICK, N.J. 08903
m AMERICAN VP OIL BOILER
INSTRUCTION MANUAL
PACKAGED OIL HEATING UNITS
FORM NO. 32425-g^_04
NOTICE TO INSTALLER AND OPERATOR THIS BOOKLET MUST BE AFFIXED ON OR ADJACENT TO THE HEATING EQUIPMENT.
01379
To the homeowner:
The American-Standard boiler which has been installed for you is the heart of your hydronlc heating system. Since the performance of your system depends upon the boiler, it haB been designed to operate at maximum efficiency. Advanced design, precision engineering, and modern manufacturing techniques are combined in this product to provide you with comfort at a low operating cost and with a minimum of maintenance.
The boiler sections are cast in iron--a metal resistant to corrosion, especially in a closed system. If this boiler is part of a new installation, it is Joined in a closed system--i.., normally water is neither lost nor added-- and shouTd^not be drained. The replacement of water adds oxygen to the system; corrosive action continues until that oxygen is consumed; but, certainly, the boiler should not be fired without an adequate supply of water. On the other hand, if the boiler is not used during the winter months, it must be drained to prevent damage caused by freezing.
By following the suggestions contained in this manual, you can assume your boiler will function properly for many years. Should any problem arise, contact your nearest American-Standard contractor, whose name can be found in the "yellow pages" of your telephone directory.
AMERICAN-STANDARD
KPWJilipUUMiJ. IIS.."!
gm iimam
01380
f
1
!
The V? Packaged Boiler comes to you pre-assembled; the installers major responsiiiiity will be m locating, connecting accessory parts and performing the actual hookup.
01381
i '/7s V a.'.as beer. testec arte approved by I=B=R as an oil-fircc
orr.es witi: three. four or five sections. I=B=R ra; ..hie. I.
lb L'i~. ,,
'/. `.A 1 >:i* T Ai-LA'flGN
.? o'/j.i'r .s,t^ .a
...
on a lever ..oar as near the chimney as possihi...
.re -hat pntfi.-ic-.i. - . iv. is allowed at me front (at ieast a 20" clearance; to a..
" terr''.>-ai of , ;i e. o. ;r n'-ater. Cleaning space Approximately 24"} shojlc. ti
eilowcn au ..-.e .; rn. Ss;e of tr.e boiler.
. ... k, c v-ints ir. the basement, or it has been necessary to wate.fr no lie v should be mounted on a concrete or hollow rue h.=
mpacfimc
boiler
; .-.cate, me b v,,cr .vir it.-, final installation site before removing its crate. Onp 'loulri be acrc:T,p...,r.fc as follows; (See Figs. 1 and 2)
1. Unfa.-.ren an crating wire at the corner of the crate.
2. So move naiiS fastening crate sides to top and bottom of crate.
3. 1 .tft off ; rate top and unwrap crate side from crate case.
4. A her rfmai. of the plastic bag, remove and discard the snort nipple ti-' K. ne fio* tapping at top of boiler.
f. ? e vv r, o x co.-, taming draft stabilizer, relief valve, and mis cellar, eo
.MSI MI
re sno'.nr, expo sec. -
.u.'l
.oc.atir.g the expansion lar.K. It should not oe set ir. a cn t- :;ae to or from the tar.K were to freeze, serious camu .-.referable to use a minimum of horizontal run pip;nr raciiitste free communication from the boiier to the tan.
01
fa s -- fa 73 Z<
II z >-
03 >- fa II 2 Z hi O 2
Z hi
Ui
-. in lO in rt rH H
XXX 5 15 00 00 00
XXX
00 03 00
m in rH rH
XX "z 00 00
XX
00 03
-m H
rH X
X r.
: CM CO *H
oo oo
2 (a)
RATINGS & DATA
X X
73
73 Z O
fa a z --.
+
fa H "i 2
56 < E-> a
z--< o
< Z SC
H
cm cm cm \\\
HHH
111 CO CO CO
^ rf
W CO CO
I1
50 ID
z H a > z
1
w w os z
HUM
-HO fa < 2 zaz
<zz
H
mm X
fa W HH 73 <C hh
zs -
--1 2
HQw fa < ZZ
H KM3^ II 73 0. Z O C H J2 II OS Z 2 -- OO^
ooo
CO CO CO HHH
rH rrt
CO CO rH rH
oo
O CO H OhN rt H H
00 cm
h- in ^o rH rrt
ooo
moo
ft co H H rt
OO
OO N 03
rrt rH
CM CM co oo rl rH
O 'O'
o ri
O hH CM CM
OO OO
nm
CM CM
a> a> H
3
C tx
irt
z s +J
H
z u?
(0
X a ti Ho
H X rH
<H C -H
3 o0
W n jo
rH
O CO fa MO
O
1 CM
>
10 -C
rt
Ma
fa -n
0 1* ? fa
rrt 05 fa rrt Ji O
H
7fa3
0fa3 7fa3 7fa3
cn W CQ
sc os
X 1H o u O fa
I
Z
fa
oo ooo ooo 0o0 0o0
ots* oC**
-3 .M M
wo o \m
O n CM
wo m mo
w
o in
O CM
fVa
05
h
0e5 ofa
z(0 5o "C
os
o z
rt rrt rt rrt rrt
CM CM
CO o
CQ <D frr
a>
rrt
><
Xil
CQ
rrt
ZCxCl 23S 3
CQ
Hh-
O <a
<
o
<--v
a
hmH
iOn Hin Nin
rrt rrt rrt
mo or*
rrt rrt
m in O CM
.
CM CM
.cX
o CQ 0/
3 bfi-H
H C3
irt a)
+j
n
H os
> 0)
z fa z Z fa 25 73 zz CQ
rfrat rfrat Hfa
tt h}i
111
cz
a=
z q
CM CM Ort Un m ii zz
ac
CO CO ^rt Eh in m
il
=2 aa
CQ (D rt
U 0
4r-t> >
rrt Q H
*H X 0
0
CQ *
fa fa
fa c
C2 Oz
2Z
moo
rrt CO ^ r ri rt
11! aaa
>>>
oo
03
rrt rrt
t1 aa
>>
oo cn in
CM CM
a1 a1
>>
fa
H
O
z
w
UO
2o
oo
v:
co
m
01383
3
1. Side Fasteners 2. Nails
FIG. 1
01384
Remove four ..u*s securing boiler to
.rare ease from c.-^. , hr
do It 5 on left sine. Bolts or. right sid. _r. then oe pushed up .mmi . . -acker
vhere they will stay. This is important ~o prevent dan-.aging jacket wr.tr,
removing boiler from base.
U
Tilt boiler to rear and to right.
3. Pivot boiler on right rear leg, rotate 90, and lower to floor.
4. Tilt boiler so that crate base can be completely removed.
-.e above procedure is quite simple and can be very easily accomplished by two en. In ar. emergency, it can be accomplished by one man with comparative ease). Peter me toner ;s removed from the crate base, it can be easily walked to its final iota; .on.
01385
J
CHECK-OFF PARTS LIST FOR V? PACKAGED BOILER Although the VP Packaged Boiler comes to you assembled, it is necessary to check certain accessory items prior to final hook up.
Accessory Box Draft Stabilizer Relief Valve 3/4" x 7-1/4" Pipe Nipple 3/4" Tee 3/4" Drain Valve Oil Burner Nozzles Circulator Flange Gasket and Bolts Thermostat 3/4" Street Elbow Draft Tube Sleeve Sleeve Insulation Instruction Sheet
Oil Burner Sox DH-F Oil Burner
ELIMINAIRZ FEATURE This VP Boiler makes use of a special front section with a 1-1/2" supply tapping incorporating the "Eliminaire" feature (See Figs. 3 and 4). The "Eliminaire" is a unique, built-in air separator which prevents air from being transmitted to the system and directs the air to the com pression tank or vent. This eliminates the need for external air sepa rators such as dip-tubes or unlmed accessories. The "Eliminaire" also assures positive air separation, thereby insuring proper system per formance .
5
01386
INFLOW
C --(WATER HEATER
HEAD)
B -(BUND FLANGE)
control TAPINGS
LOCATION ^NGS
CONTROL USED
A ^4
BELIEF VALVE
IMIT CONTROL
OR
B
*
COMBINATION _MfT ANO REVERSE ACTiNG CONTROL
(FOR INSTALLATIONS WITHOUT
TANKLESS WATER HEATER) .
C *4 D_
IMMERSION CONTROL COUBLE THjROW SWITCH
IMMERSION CONTROL RELAY COMBINATION _
E
\
AUXILIARY uMI* CONTROL (WHEN REQUIRE.
A
FIGURE 3
FRONT VIEW-SHOWING CONTROL TAPPINGS
now PIPE_____
TO CONVENTIONAL EXPANSION TANK 04 AIR VENT IF DIAPHRAGM TANK IS USED
t.
&_
RELIEF VALVE
TOh r
o -E
RETURN
(I * ifi' INoSIrDE
' NIPPLE
\
aJ
EUMINA1RE ANO PIPING FOR FLOW PIPE
AND RELIEF VAIVE
FIGURE 4
01387
' -TABLING THE VP BOILER
7
r moving the VP Packaged Boiler to the desired location, final installation - cedures should ae accomplished as outlined below.
1. Hook up piping. If jacket extension is to be used, make sure that piping connected with the not water heater and the boiler return piping to the circulator is arranged to pass through the opening in either the top or sides of the jacket extension (follow assembly instructions accompanying same). (See Fig. 5).
Z. Screw drain valve into tee at lower right front of boiler.
3. Install reuef valve and fittings in top of front section (See Fig, 4), making sure the direction of the discharge is away from controls.
4. The upper flange of the circulator should be installed on the return piping, then ooited to the circulator flange. Be sure that flange gasket is not damaged, and that the flange bolts are drawn up equally tight.
5. Install the flue pipe and draft stabilizer using instructions provided with stabilizer. The flue pipe should not extend beyond the inside waii of the c.umney flue. Horizontal runs of flue pipe should be kept at a minimum with approximately 1/4" pitch per foot maintained.
6. Run electric service line from switch (not furnished by A-S) to the control mounted on built-in water heater, or for boilers without water heater, on water heater opening cover plate.
7. The Cad Ceil lead should be taped to the conduit assembly extending from control to burner to prevent snagging or damage. (See Pg. i).
8. Install room thermostat.
9. Make ail electric connections according to wiring diagram, (See Fig. 6).
10. The boiler :s now readv to be filled. THE FILLING PROCEDURE IS AN IMPROVED METHOD, AND SHOULD BE FOLLOWED AS INDICATED ON FIG. 7.
11. Boiier is now ready for service.
01388
a E
-2^- -
j--CLEAN-OUT DOOR
FIGURE 5 Space Peauirements For 3oiler PiDinE
01389
0-1
iLl
>t
So
Q. Z Q- X
o5
i
x CO
5 UJ
>
< <r
<c
TEMPERED FROM WATER HEATER TO
9
01390
___ GnO.
_INE_
fdotted lines
H0`
not furnished
i6 6
HONEYWEl.;. RRie2D
COMBINATION CONTROL
z e
F
L9. 9
I I
!I
WIRE COLORS E - SLACK W- WHITE
o Oi )
. I; y
HIGr i_IMlT CONTROL
z SETTING APPROX. 210")
r ;low limit control
B, Ct C, Q GO
SETTING ArPROX. 190*)
it:
II
-w--
-WIFI : NUTC 1/1 NOT FSIRiMSHEi)
o :n
I 5 6:^4
CIRCULATOR
-vv--
LOW VOLTAGE-.
____________ a.
1n 0 J*1"'
~~t
OIL BURNER
FLAM DEL
GENERAL SCHEMATIC SHOWING WIRING TO COMPONENTS T>'
S' I
*1 s.
( 1 ,rl |
.vr I
r* - Ri*-va/v - I. j+-- (*J J, /'>-_S,* ' - !<V
INTERNAL -.CNFMATiC A NO connections fO* RRIR20 CONTROL
PACKAGED GTI, BOILER WITH WATER HEATER WIRING DIAGRAMS FOR CONSTANT IGNITION
01391
w X ouo-I
UJ x co 9 9
IV
ox
2
cvi
z x' o
USE
H CL
Z~ < =*(sS
5E
5S
gs oo
<
PACKAGED OIL BOILER LESS WATER HEATER WIRING DIAC-RAO WITH REVERSE ACTING CIRCULATOR CONTROL AND CONSTANT TO'O O'
oc
01392
12
TO O'L BCRNER MOTOR ANO IGNITION
TO WATER CIRCULATOR
INTERNAL SCHEMATIC AND CONNECTIONS FOR R8I82E CONTROL
INTERNAL SCHEMATIC AND CONNECTIONS FOR R8I82F CONTROL
PACKAGED OIL BOILER LESS WATER HEATER WIRING DIAGRAMS WITH REVERSE ACTING CIRCULATOR CONTROL AND CONSTANT IGNITION
Figure o
01393
5T N0.5-Z ADDON" ZONE CONTROL SET FOR USE WITH HONEYWELL R-8I82D CONTROL
01394
Z*if diaphragm type expansion TANK is
USED AUTOMATIC VENT VALVE SHOULD 8E INSTALLED IN THIS location
EXPANSrON TANK ^
CHECK VALVE (IF USED i --
WATER SUPPLY
I
ETURN| RELIEF
VALVE\arr ^
MANUl AL VALVE
-HH-
3A,_ANClN'
COCKS 0b ZONE VA*.
,'ULATOR
Supply to SYSTEM
FOP MULTIPLE ZONE OR CIRCUIT OPERATION
$*ON A SINGLE CIRCUIT JOB
9ALANCING COCXS AND ZONE VALVES NOT NEEDED
FLOOR LINE
FILLING* 1 2 * * 5 6 7 * 9
FIG. 7
The following procedure should be used to fill a series loop Heatrim System (See Fig.
1. Close all zone valves except the one for the zone to be filled with water and purged of air.
2. Open the drain valve on the boiler. ,. Open the fill valve. i. Close the purge valve. 5. Open the relief valve. 6. Open the valve to the second zone to be purged; then close the first. Repeat this
step until all zones have been purged of air and filled with water; hut always have one zone open. (Zones are purged and filled when water car. be felt in the pipe at the end of the zone). 7. Close the drain valve. S. When water appears, release the lever on the relief valve, allowing it to close. 9. Continue filling the system until the pressure gauge reads 12 psi without heat or 25 psi at 200 F. ; close the fill valve. 9. Open the purge valve.
"ollowing the completion of the installation, a thorough check should be made of the entire hydronic system to locate possible leaks.
MOTE: For a single loop heatrim system no additional vents, cocks, valves or other accessories are required except: When tankless heater is used and heatrim is above the boiler outlet, install a flow-check valve to prevent gravity circulation.
^ACTION: If a valve of any type is installed in the piping leading to or from the expansion tank, BE SHRE THAT IT IS .ALWAYS OPEN WHILE THE BOILER TS TN OPFR ATTOM-
01395
15
^RE OF BOILER WHILE IN OPERATION 0S A CLOSED HOT WATER SYSTEM, THE PRESSURE MUST NOT EXCEED 30LBS. ,
IT DOES, IT MUST BE RELIEVED IMMEDIATELY AND THE CAUSE OF THE FAILURE V THE THE RELIEF VALVE INVESTIGATED AND CORRECTED: OTHERWISE, PRESSURE MAY BUILD UP AND CAUSE DAMAGE TO THE HEATING SYSTEM.
FIG. 8 The homeowner should periodically check the readings on the gauge, located on the front of the boiler (See Fig. 8). The lower scale indicates the water temperature. That temperature should never be allowed to exceed 250F. The boiler is designed to operate with a normal maximum water temperature of 230 F; but during mild weather, the system operates with water temperatures considerably below the maximum. The upper scale indicates the pressure within the system and should not exceed 30 lbs. In a closed system, the boiler and piping are entirely filled with water except for a cushion of air in the upper portion of the expansion tank. When the water is heated, it expands, compressing the air in the expansion tank. If, for any reason, this air were completely displaced from the tank, there would no longer be a cushion; an increase in water temperature would cause a corresponding increase in volume; pressure would force the relief valve open to discharge the excess volume. To correct such a condition, the expansion tank must be drained enough to permit the tank to fill with air. Clean boiler surfaces at regular intervals. Do not draw water from boiler while in use. When adding water while boiler is in operation, DO NOT OPEN SUPPLY VALVE FULLY, BUT ADD WATER SLOWLY.
01396
CARE OF BOILER At end of heating season, ciean boiler thoroughly and spray flue surfaces with light lubricating or crankcase oil using gun with extended stem so as to reach all corners. When replacing cleanout door, boiler putty is necessary for sealing. Lubricate circulator in accordance with lubrication instructions on decal. Ciean and remove flue pipe where feasible. Keep system filled with water; in other words, DO NOT DRAIN BOILER. IF BOILER IS NOT USED DURING WINTER, IT MUST BE FULLY DRAINED TO PREVENT DAMAGE CAUSED BY FREEZING.
01397
- \ ctht-" ^ ' r ~ 'TT/-
ri'rec difi'-rons >.or.-r: section rastmqs '-r>- us sc '.o make up the V ,j ;-n.k.x
'',,*iiler
r";.G. ?).
.
Fror.r c.r>n w-.rh ! -:./2" supply tapping, and Elimina:rc '' ;5-^
I. -`'rui".
hick;.
i: r
.'r " i
r1'.
-.t -.n
i .. -.rdcr to give the
lu; .. rlfl:
'mb:: i.i on <ma.A.-: r ,1 rn r l,r;*\
rho necessary -vatr-r content
- rat :.V; r>i thr kr, :1^ - - ' r. V'.
cm 1.
- . r;-. kr 'k jdk ...ittorv
Htv opP\
o
: m .
h, * c .iitt
' ' om>` jneni a and made of steel. A refractory radiation
ir.icla is
:rh'f: *.ha M-v,.er ou-ce from heat.
CAdOPY r.-.r . c ^ r.e a: - - :c _ 1 canopy is provided. Smoke pipe sizes are a a :>
To. of ~ecr.Civ
f i
-
Smokepipe hr..'
/ 1 7" 8"
The r.t rw -irVi" -.e a* mated -.vith i/f. " j ibergias. An additional 1'' of insulation ir _ ;cc -r. `.he car.n'vr.
01398
ri A
r -25. b INFLOW
/ '
3 3 I I
3
-- 6---------
cc.CT10N THRU BOILER
Mi i>
OF
DIMENSIONS
_:E'lTiONS_ 3 16-j
H g-L
0
ax -i
bI6 IS -'JL
4__J2f "k__6_-_S__1_5A;l
5 2ef"
1% 2lfj
FIGURE r?
01399
PACKAGED BOILER
FIGURE 10 Although the basic boiler remains the same, the differences e:<:. = i in the wiring procedure with or without water heater (Use 71z
01400
c o Vi BUSTION Ch..
.o.
'^he VP Boiler has a one-piece precast Refractory Combustion target wail ;f>ecially designed for maximum performance and efficiency.
QI L BURNER
The Model DH-F oil burner is used with the VP boiler. This burner is especially designed with a conventional flame-retention head to give maximum performance ,ind efficiency in the VP boiler.
CONTROLS Controls for the VP Packaged Boiler are conventional.
JACKET Jacket design for the VP Ehckaged Boiler is conventional as with other A-S boilers.
20
01401
CAUTION TO INSTALLER AND HOMEOWNER This hydronic heating boiler incorporates the best in engineering and manufacturing techniques and will give years of good service and trouble-free operation if properly treated. The heat transfer surface has been carefully designed to give optimum performance and reliability. However, the presence of contaminants such as scale, sediment, and boiler sealing compounds in the section waterways may serve to insulate the heat transfer surface and cause premature failure of the sections. Scale build-up can be prevented by good installation practices which eliminate addition of makeup water to the system. Sediment which may accumulate in the boiler should be flushed out on a regular basis in accordance with recommended maintenance practices. Occasionally, leaks will be detected in the system. These leaks are usually of such a nature that they may be prevented or corrected by good workmanship. Every effort should be made to correct them without the use of boiler sealing compounds. If sealing compounds are used, they should be used as sparingly as possible and never in excess of the manufacturers' recommendations. Following their use, the boiler must be thoroughly flushed out. Otherwise, serious damage may result.
21
ft 01402