Anniston* Alabama C. H. Kdelblut R* A. Pohl " v ---*41. L. Hedworth R. C. Sprague Hay 7, 1959 DAILY PRODUCTION DEPT. REPORT May 6, 1959 '? : M.i Chlorine Dept. Cell hours 600* average amp load 40*895 One cell down 24 hours switching anodes and making repairs to stones* installing new cover. 121 volts at 41*200 an$s with 25 cells on line* One car KCl in demurrage. Hiran Dept. The alterations on the residue hold tank outlet were not done so the change-over could be kept on schedule. The piping will be fabricated and Installed when the vessel is given its next glass-lined inspection. Assay on washed intermediate was 99.9X. Total time required for this demonstration 28 hours. Biphenyl Dept. #9 Unit still down 24 hours from previous shutdown. Acid tower sewered acid 8 hours on second shift* 5 hours on third shift* storage full. #5 chlorinator down 5 hours for pump repairs. J. H. Starr J. A. Mullendore J. Clegorn :ad DSW 334290 STLCOPCB4080868