TO : E- Wheeler/ J. T. Garrett General Offices
As per our discussion with the people from the Canadian Food
and Drug Directorate and Jack's and my combined discussions with Dr. Denzel Ferguson (Mississippi State University) and the people at the Michigan Water Resources Commission, I believe - as you do - that the Bio-Test fish toxicity work
should be repeated.
I have determined experimentally that, outside of using a
continuous flow bio assay system, we cannot easily prepare a
stable, definite concentration of Aroclor In water for static
bio assay. This Is primarily due to the Infinite capacity of
the container walls with respect to the desired exposure levels.
(Re Meeting Minutes, Analytical Review of Bio-Test Four Day
Fish Toxicity Studies, 7-31-69.)
^
Although the static 96 hour (TLm) Is not the ultimate In
toxicity data. It Is a familiar toxicity Index that fish and
wild life people understand and employ. 1, therefore, suggest
that 96 hour (TLm's) be determined for selected Aroclors
according to "Standard Methods" no matter how ridiculously
high, the exposure level has to be pushed to cause complete
mortality.
.
I also th-1nk that we should use Dr. D. J. Clegg's (Canadian
F.D.D.) suggestion of substituting bull-heads for the trout used In the earlier Bio-Test exposures.
Assuming two species of fish (bluegllls and bull-heads) and three exposure levels, the cost of the analytical work would be
In the range of )2500-$3500 per Aroclor studied. This would include:
1. . 2.
. 3.
Analysis of zero time water samples, 6 samples per Aroclor.
Analysis of all fish, mortalities and survivors, 6-30
samples per Aroclor.
Determination of a`blank container profile", 36 samples per
Aroclor.
.
'
Additionally, I think that we should review the results of the Bio-Test feeding studies to determine which of them should be supported with analytical data so that necessary time can be
programmed Into our projected work load.