Document gbawaoMO13YxO29GaXzwjbevL

UNITED STATES AGENCY ENVIRONMRENETGALPI ROONTE C1T ION BOSTON, MA 02109 Date:Dated as shown on electronic signature(s) Subj:Inspection Report - Clean Water Act (" CWA ") National Pollutant Discharge Elimination System (" NPDES ") From:Andrew Spejewski, EPA Inspector Digitally signed by ANDREW ANDREW SPEJEWSKI SPEJEWSKI Date: 2025.02.05 09:32:02 -05'00 ' Thru:Margarita Chatterton To:File I. Facility Information A. Facility Name:Black Bear Condo construction B. Facility Location:29 Casey Drive Milford, MA 01757 C. Facility Contacts:Dominic Afonso D & F Afonso Builders Inc 32 Casey Drive Milford, MA 01757 D. ID No (s).:None known II. Background Information A. Date(s) of inspection: 12/10/2024 B. Weather Conditions:overcast but dry, rain previous day C. US EPA Representative(s):Andrew Spejewski Margarita Chatterton ED_019088A_00020029-00001 D. State / Local Representative(s): None E. Federally Enforceable Requirements Covered During the Inspection: EPA's General Permit for Construction Stormwater F. Previous Enforcement Actions: None known III. Type and Purpose of Inspection Unannounced Evaluation of compliance with EPA's General Permit for Construction Stormwater IV. Facility Description The site is a residential construction site, destined for condominiums. It is roughly rectangular, lying north of Casey Drive. The future Black Bear Road through the project goes north from Casey Drive, makes two 90 degree turns and returns to Casey Drive. The surrounding terrain is slightly above the project grade to the east, and a wetlands complex to the west is below the project level. At the time of the inspection, the entire site had been cleared and roughly graded to about the level of Casey Drive. The future Black Bear Road was paved (but not the final coat). Some work was also done by the operator on the adjacent section of Casey Drive at the same time as the Black Bear project. Casey Drive had been constructed earlier by the same operator, but is now town - owned (according to the operator). V. Inspection The unannounced inspection immediately followed an unannounced inspection of Angel Court, another project by the same operator about half a mile away also off of Casey Drive in Milford. See the Angel Court report for the introduction and opening conference. A. Opening Conference Mr. Spejewski presented his credentials and a copy of the Small Business Information Sheet at the opening of the inspection at Angel Court, as documented in the Angel Court Inspection Report. B. Facility Tour Mr. Spejewski, Ms. Chatterton, Mr. Afonso and Brendon Ferreira (an employee of Afonso Construction) arrived at the site following the Angel Court inspection. The group toured the site. Mr. Afonso said that catch basins had been installed, and that they drained to a (pre - existing) stormwater basin to the west, just north of Casey Drive. Mr. Spejewski had observed the basin while driving to the site, and it had well - established grass slopes. 2 ED_019088A_00020029-00002 The Black Bear site bordered wetlands to the west, with a short slope (apparently due to fill) down to the wetlands. Silt fence was in place at the foot of the slope, but had fallen or been pushed over by rocks at several points. Two large stockpiles were in place, one along the center of the west edge of the site and one in the northwest corner. Neither appeared to have any deliberate stabilization; part of one was overgrown with weeds, but most of the stockpiles were fairly fresh with no growth. There was no particular control around the foot of the stockpiles other than the silt fence around the outer perimeter of the site, which was down in several -places adjacent to the stockpiles. There was no concentrated flow off the site at any point at the time of the inspection. The center of the site was undergoing earthmoving. To the east, the surrounding terrain was above the site. A catch basin in the road on the site had filter fabric installed. On the south side of Casey Drive, across from Black Bear, was a strip of disturbed dirt, between the road and a retaining wall to the south. Below and around the wall was well - established grass with no concentrated flow path and no sign of dirt being carried through it. C. Records Review Mr. Afonso was unable to produce a Stormwater Pollution Prevention Plan the day of the inspection. He stated (during the Angel Court inspection) that they regularly looked at erosion controls, but did not document that anywhere. D. Closing Conference After touring the Black Bear site, the group left for the offices of Afonso Construction. At the offices, Mr. Afonso provided a plan for the stormwater basin at Angel Court. He was unable to locate a Stormwater Pollution Prevention Plan for either site, or any information about a NPDES permit for either site. Mr. Afonso put Mr. Spejewski on the phone with a man who identified himself as an engineer working for Afonso Construction, and said that he would look for a SWPPP or any NPDES application information. [The engineer subsequently emailed Mr. Spejewski stating they do not typically file NPDES permits for clients] Mr. Spejewski noted concerns to Mr. Afonso, including slope stabilization, the difficulty of inspecting the stormwater basin at Angel Court, the downed silt fences at Black Bear, and the potential lack of NPDES permits for both sites. Mr. Spejewski then thanked Mr. Afonso and others for their time, and left the offices, concluding the inspection. E. Inspection Photos IMG_0178.JPGSouthwest corner of site IMG_0179.JPGsouthwest perimeter 3 ED_019088A_00020029-00003 IMG_0180.JPG Facing west over west side, near southwest corner IMG_0181.JPG Facing north along west side, near southwest corner IMG_0182.JPG Facing north along west part of road IMG_0183.JPGFacing north, west edge of stockpile on west side of site IMG_0184.JPG Facing southwest over west edge of site IMG_0185.JPGPerimeter of stockpile northwest corner IMG_0186.JPGEdge of stockpile northwest corner IMG_0187.JPGSilt fence below northwest stockpile IMG_0188.JPG Border of northwest stockpile IMG_0189.JPGEdge of northwest stockpile IMG_0190.JPG Northwest stockpile IMG_0191.JPGFacing south along east part of road IMG_0192.JPG Catchbasin on road, eastern part IMG_0193.JPGSouth side of Beaver Street, across from Black Bear IMG_0194.JPG Facing west along south side of Beaver Street IMG_0195.JPGoperator error Unless otherwise noted, this report describes conditions at the facility / property as observed by EPA inspector(s), and / or through records provided to and / or information reported to EPA inspector(s) by facility representatives and as understood by the inspector(s). This report may not capture all operations or activities ongoing at the time of the inspection. This report does not make final determinations on potential areas of concern. Nothing in this report affects EPA's authorities under federal statutes and regulations to pursue further investigation or action. 4 ED_019088A_00020029-00004