Fm. 40-4
Newport News Shipbuilding and Dry Dock Company
Order N0....111:?(SUPt.l)......
JOB ORDER
,
....................................... AP?AL?3............ia&3
For SS ESSO GETTYSBURG
By Contract $............................
DESCRIPTION
CANCEL ITEM 57 - THIS ITEM COVERED ON 69O-S
P 9 8?
MESSRS: Rutter Boykin Howell Borders Feddeman ALL FOREMEN Hiemenz Knight Challoner Hassell USCG-1 ABS-1
mlh/120
Copies: Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper iabulating Dept
Humble Oil & Ref. Co. Ordered By....thru Mr. Challoner......................
Proceed with work and charge to J. O....... ZIZ.T.t?............
............................ LA..C....Rp.bertson.....................
Cost Engineer
Manager of Ship Repair
EXX-MOR-005849
j)< Fm 40-4
^
Newport News Shipbuilding and Dry Doctf Company
Order No............ Z.l.?..r..j[jSjaptv...2 )
JOB ORDER
................................ ...........................19--J
For................................... :............SS . ESSO.. O-EOTySBURG............................................................ .
By Contracts............................
DESCRIPTION
9&&h
58-A.
CANCEL ITEM 58 AND REPLACE WITH THE FOLLOWING:
HULL PAINTING (l!3) A. All bare and rusty areas of the entire exterior shell surface from keel to rail to be thoroughly sand-swept. Oil and grease to be removed using approved solvent, then washect down with fresh water under pressure., and Humble paints applied as specified.
B. Keel to Light Load Line., Rudder and Stern Frame
Apply two (2) coats of modified epoxy primer
to all bare
areas. Then apply one (l) full coat of modified #587 and one
(l) full coat of modified epoxy #591. (This does not include
7300 sq. ft. of sandblasted surface covered in separate item).
C. Light to Deep Load Line All bare spots to be touched up with two (2) coats of modified epoxy #566, Then apply one (l) full coat of modified #567 and one (l) full coat of modified epoxy #591.
D. Doep Load Line to Rail (topsides) Touch up~a.ll bare spots with two (2) coats of modified epoxy #566. Then apply one (l) full coat of modified epoxy #567 and one (l) full coat of modified epoxy #597.
E. Miscellaneous Repaint vessel's name, hailing port, plimsol marks and draft: marks.
F. General - Paint will be supplied by Owners. Paint may be
sprayed on. Drying time allowed between each coat of primer or
paint to bo In full accordance with Manufacturer's recommenda
tions , All surfaces to be inspected and approved by Owner's
Representative before applying priming coa tand before apply
ing each additional coat. No painting to be done except during
clear and dry weather.
59-A. DECK SANDBLASTING AND COATING
Substitute After Boat Deck and Fidley Deck ir. lieu of Foc'sle
MESSRS: and Fwd. Main Deck.
Rutter Boykin Copies: Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept
Howell Borders Feddeman Neill Hiemenz Knight Ohalloner
Humble Oil & Ref, Co. Ordered By.......... ...........................................................
Proceed with work and charge to J. O...... 7.17 ....... .--
............................. L.,...C.. .Robert son....................
dost Engineer
'
Manager of Ship Repair
Hassell
Klink
USCG-1
ABS-1
mlh/65
EXX-MOR-005850
/
;/
Fm. 40-4
Newport News Shipbuilding and Dry Dock Company
Order 717-S(Supt. 3).......
JOB ORDER
........................ May_. 2...................... 19.^3.
For
SS ESSO GETTYSBURG
___
By Contract $............................
DESCRIPTION
CANCEL ITEM 89 - THIS ITEM HAS BEEN TRANSFERRED TO J.O. 728-S.
MESSRS: Rutter Boykin Howell Borders Feddeman ALL FOREMEN Hiemenz Knight Challoner Hassell Godsey USCG-1 ABS-1
mlh/120
Copies: Production Department Inspection Department Purchasing Department Gen!. Acct. Chief Timekeeper Tabulating Dept.
Humble Oil & Refining Co. Ordered By.............. thru_Mr.....Challoner...........
Proceed w.ith work and charge to J. O......7...1..7...-.S..............
L. C. Robertson
Cost Engineer.............................
Manager of Ship Repair
EXX-MOR-005851
//...
Fm. 40-4
Order No For
Newport News Shipbuilding and Dry Dock Company JOB ORDER
.............................Maj..6............. .19.3..
S.S. ESSO GETTYSBURG ................................................ .....
By Contract $..... .......................... CMOEL ITEM 84.
DESCRi PTION
CANCEL ITEM 50 PARA."B"
CANCEL ITEM 70
66-A. VENTILATION Change this item to read ventilation to void space under steward^ store room.
67 -A.AIR SUCTION Change "title of item to "APT FIRE ROOM VENTILATION SUCTION".
Cancel stainless steel insect screen.
MESSRS: Rutter Boykin Howell Borders
Feddeman ALL FOREMEN Hiemenz Knight Cha1loner Hassell Godsey USCG-1 ABS-1
mlh/120
\
Copies: Production Department inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept.
Mr.Ireland, Humble Oil & Ref. Co. Ordered By.feU.^.Vi..Er ,.,,Challoner......................... Proceed with work and charge to J. 0-..74J.C.?................
L. C. Robertson................
Cost'Engineer'................................................. Manager of Ship "Repair
EXX-MOR-005852
;/
2 Lb o ; y oo
Fm. 40-4
Order No For
Newport News Shipbuilding and Dry Dock Company
lll-S&mh... 5)
JOE ORDER
................................ May 7
SS ESSO GETTYSBURG
By Contract $.
X
2 , w fy'b
DESCRIPTION
97. STARBOARD 750 KW GENERATOR AND 7.5 KW EXCITER
a. Make necessary removals, disconnect starboard 750 KW
generator and 7.5 KG/ exciter, remove from vessel, crate
and ship via prepaid motor freight to:
General Electric Shop
1403 Ingram Avenue
Richmond, Virginia
Attention: Mr. R. 0. Anderson
MARKED: From SS ESSO GETTYSBURG
b. Take delivery of Owner furnished repaired 750 KW generator and 7.5 KW exciter, install on vessel, connect up coupling in correct alignment, connect up leads, and replace all removals in good order. Test and prove generator in good working order.
98. MAIN 0IR0UBAT0R PUMP MOTOR -GE,HP-200 - (303) Disconnect and remove to shop the main circulator pump motor. Thoroughly clean rotor and stator windings with approved solvent. Bake until satisfactory megger readings are obtained, apply one (l) coat of approved insulation varnish. Renew stator shaft (furnished by Owners), install coupling,(remove from broken shaft). Reassemble, renew ball bearings (bearings to be packed with approved grease). Reinstall and connect up motor in true alignment and prove in good operating condition.
Ao99. MAIN CIRCULATING PUMP -WARREN- SIZE 3 USLMV-GPM 25000
Open up main circulating pump for examination. If necessary
install spare Impeller assembly. Prove grease connections
clear. Close up, adjust clearances, rejoint, repack, test
and prove in good working order. Replace all removals In
good order.
MESSRS:
Rutter
Boykin
Howell
Borders
Feddeman
Overman
Dunn KColpiinesk: Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept
Webb S chmidt Hiemenz
Lenhart Knight Challoner Hassell
Mr.Ireland, Humble Oil & Ref. Co. Ordered By.................4^719J4r...PJaa 1 lone r.........
717-S Proceed with work and charge to J. O................................
L. C. Robertson
Cost "Engineer
Manager of Ship Repair
Godsey
USCG-1
ABS-1
mlh/85
EXX-MOR-005853
Fm. 40-4
Newport News Shipbuilding and Dry Dock Company
Order No...... (Supt. 6)
JOB ORDER
............................. May 8...........;......,ft_63
Fot........................................................ SS ESSO GETTYSBURG
..........
By Contract $............................
DESCRIPTION
100. 13 Zb 6
750 KW STARBOARD GENERATOR TURBINE AND GEARS
INSURANCE CLAIM NO,
A. Take delivery of Owner furnished turbine and gears and
send to shop.
Disconnect and remove to shop bottom and top turbine casing
of starboard generator turbine.
Rebuild ship's turbine using parts from Owners furnished
turbine under supervision of DeLaval Service Engineer.
Reinstall and realign.
Open reduction' gear casings for examination, check and record all clearances. Renew worn bearings and adjust to proper clear\ ances. Open up lube oil pump, check all parts for wear and defects. Renew defective parts, examine all orifice plates in lube oil system.for wear. Open for examination nozzle strainer for gears, clean, renew gaskets and replace in good order. Renew all enlarged orifice plates, also overhaul and adjust all relief'valves. Open up governor and control, check relays, valves, etd. for wear and renew defective parts. Upon comple tion of work close up all in good order. Clean oil sumps on completion of work and close immedia tely after being inspect ed by Owner's Representative, (Parts and bearings furnished by Owners). Furnish five (5) typewritten copies of all readings before and after adjustments are made, to Owner's Rep.
Disconnect, clean and connect all oil piping* Thoroughly clean, test, and prove lube oil coolers tight, renew- zinc plates. Upon completion of work, close up all in good order. Test and - adjust overspeed trip and prove turbines, gears and generator in goodqperating condition under load.
B. Generator Turbine Atmospheric Relief Valve -Size 8". Remove to shop atmospheric relief valve, open up, repair fracture in valve body at flange, hydrostatic test, prove tight, machine, seat and disc, grind in, renew worn or defective parts, re assemble, renew bonnet gasket, defective bolts and nuts, test to required; pressure, prove tight, and in good working condi tion. Return and install on generator turbine, renewing flange
cn ptlrot.R hnl -hs nnr? nnf-.fi . rrnmrA t-.l o-hf .
end.
* 1 1 b/vpui
n J,
Purchasing Department J--L-ne
Genl. Acct. Chief Timekeeper Tabulating Dept.
MESSRS: Rutter
Boykin
Howell
Borders
Feddeman Bayfon
........................Robert son......................
Cos't Engineer Knight
Manager of Ship Repair
Overman
Challoner
Klink Webb
Hassell Godsey
:
'
.
Schmidt
IT-i nmonrr
mlh/80
EXX-MOR-005854
SSL O
Fm. 40-4
Newport News Shipbuilding and Dry Dock Company JOB ORDER
Order No.... .................................................................................................................................... For.............'............. ....................... SS.ESSO...GETTYSBURG............................................................
By Contracts............................
DESCRIPTION
21-A.
CONTROLLERS (303) Repair controller for fwd. stbd. force draft fan motor.,
HP 175.
26-A.
CARGO PIPE (523) Td). Use galvanize pipe. (e) Cancel galvanize pipe. Sandblast pipe inside and outside
and coat with Humble Rust Ban 191.
CANCEL ITEM 59 DECK SANDBLASTING AND COATING
43-A.
ANCHOR CHAINS (103) Cancel "[rRenew one (l) patent link stbd. anchor chain". (Renewed at last port),
91-A.
ALCOHOL AND SOLVENT CONVERSION
(M) Discharge and Loadllng Lines on Main Deck
'.
Use 6" instead of 8" for filling or drop lines, install
as per sketch.
Cancel the two (2) 8" loading and discharge lines for
ward of midship house.
(P) CANCEL - GRatings Forward Main Deck
a,odd (w) Furnish four (4) draxfings of the completed Alcohol
and Solvent System.
MESSRS:
Rutter
Boykin
Howell
Borders
Feddeman
ALL FOREMEN
Hiemenz
Cooper
Challoner
Hassell
Godsey
USCG-1
ABS-1
mlh/120
Mr.Ireland, Humble Oil & Ref.Co.
Copies: Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept.
Ordered By.........thru. Mr.t...Challpner.................
Proceed with work and charge to J. O.... ' 0.!..................
Cost Engineer
L. C. Robertson
Manager of Ship Repair
EXX-MOR-005855
Fm. 40-4
)
)
Newport News Shipbuilding and Dry Dock Company
Order No111"..(Supt.8.)........
JOB ORDER
................. May...9.............................. 19.63..
For
SS ESSO GETTYSBURG
< ...........................
By Contract $............................
DESCRIPTION
/360O ioi.
CARGO TANK BALLAST PIPING (523) Renew the following sections of cargo tank ballast piping (using extra heavy steel pipe). Sandblast pipe inside and out side and coat with Humble Rust Ban 191, also 12" Dresser couplings. Hydrostatic test pipe to 125 lbs. Prove tight
#10 Center- 12" dia. x 361-6" long, two bends, 2 dresser couplings - one butt weld.
#9 Center - 12" dia. x 36!-6" long, straight, 2 DreBser couplings, one butt weld.
#8 Center - 12" dia. x 365-9" long, straight, 2 Dresser couplings., one butt weld.
#7 Center - 12" dia. x 36I~9" long, straight, 2 Dresser couplings, one butt weld.
#6 Center - 12" dia. x 35}-8" long, straight, 2 Dresser coup lings, one butt weld,* one(l) 12" dia. long side outlet, one (l) 12" dia. x 17" long bottom outlet. One section port to stbd.-12" dia. x 43* long,straight, 2 Dresser couplings, 3 welds, one (l) 12" dia. x 17" long top outlet welded to above bottom outlet. One section 12" dia. approx. 8'-9" long, one bend,flanged one end, welded to above side outlet, one 12" flange gasket with one(l) 8" dia. side outlet approx. 4" long. One section 8" dia. approx. 30" long, straight, flanged one end, 90 deg. welded elbow other end, welded to above 8" side outlet, 1-8" flange gasket.
#4 center - one (l) section 12" dia. approx. 9J long,straight, flanged oae end, 90 deg. welded elbow other end, one 12" flange gasket. One section port to stbd.-12" dia. x 431 long,straight, 2 Dresser Couplings, three welds, one (l) 12" dia. x 18" long top outlet welded to above 90 deg. elbow, one (l) 12" dia. x 12" long side outlet. One section 12" dia. approx. 8' long, one bend, flanged one end, welded to above side outlet, one 12" flange gasket, one 8" dia. x 4" side outlet. One section 8" dia. approx. 30" long, straight, flanged one end, 90 deg. welded elbow other end, welded to above side.outlet, one (l) 8" flange gasket.
Copies: Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept.
Ordered By........................................ Proceed with work and charge to J. O
Cost Engineer
Manager of Ship Repair
EXX-MOR-005856
Fm. 40-4
Newport News Shipbuilding and Dry Dock Company JOB ORDER
Order No........ ..................................................................................................4.9......................................... 19.63
Fnr SS ESSO GETTYSBURG
By Contract $............................
DESCRIPTION
3102.
CARGO PUMP TURBINES (503) - G.E. Open governor control valves of #1, #2 and #4 cargo pump turbines for examination, renew worn and damaged parts, test main valve seat for tightness, renew if found leaking, examine air operated valve and speed changer. Check all parts for wear and defects, renew defective parts. Reassemble, renew gaskets, defective cap bolts, studs and nuts. Test and adjust overspeed trip, low pressure trip, prove in good operating condition. Renew or replace disturbed insulation as original. Parts furnished by vessel. Work to be under supervision of G. E. Service Engineer.
Si's to t,
103#
CARGO TANK BALLAST PUMP TURBINE (503) -G.E.
Open casing and bearings for examination, check clearances. Renew defective bearings. Polish rotor shaft and housing in way of carbon packing. Renew carbon rings, install four rings each end of turbine instead of three. Open lube oil pump and speed changer, check all parts for wear and defects, renew defective parts. Clean bearing housings and straine rs, test lube oil cooler, prove tight. Reassemble, renew gaskets, defective studs, bolts, hex head bolts and nuts.
/SO So
Open governor control valve for examination, renew worn and damaged parts, test main valve seat for tightness, renew if found leaking. Examine air operated valve and speed changer check all parts for wear and defects, renew defective parts. Reassemble, renew gaskets, defective cap bolts, studs and nuts. Test and adjust overspeed trip, low pressure trip, prove in good operating condition. Renew or replace disturbed insu lation as original. Parts furnished by vessel. Work to be under supervision of G. E. Service Engineer.
104.
CARGO TANK BALLAST PUMP,WORTHINGTON 8LN18V01 (503) Remove seal cage In coupling end packing box of cargo tank ballast pump. Give ring clearance. Repack with approved 1/2" packing.
105. 8" GATE VALVE
.
Remove from Owner's storage in yard one (1) 8" gate valve.
Deliver to engine room ESSO GETTYSBURG. Valve marked 513-S,
in Bldg. #543. MESSRS:
'
Mr.Ireland,Humble Oil & Ref.
Copies: Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept.
Rutter Boykin Howell Borders Feddeman Baxter
Ordered
Proceed with work and charge to J. 0....7.4.7r...
L. C .SsMY.t-spn................
Cost Engin6|e6T
' Manager of Ship "Repair
liemenz
Overman
Knight
USCG-1
Klink Webb Schmidt
Challoner Hassell Godsey
ABS-1 mlh/80
EXX-MOR-005857
Fm. 40-4
Newport News Shipbuilding and Dry Dock Company
Order No.............. . 10)
JOB ORDER
................................May...10............1963..
For
SS ESSO GETTYSBURG
...........................
By Contract $............................
DESCRIPTION
59-B.I /
DECK SANDBLASTING AND COATING (CORROSION PROJECT) Shipyard is to supply all equipment, labor, power, materials (not including paint), lighting, etc., required to carry out this item. Suitable covers over all cowl and vent openings will be required to prevent sand and dust from filtering into any; machinery space. Doors and skylights to be taped shut where possible. Emergency generator room and engine room to be vacuumed upon completion if dust accumulation in these spaces is excessive. Sand biast to white metal approximately ten thousand five hundred (10,500) square feet of deck surfaces as follows:
Boat deck aft; boat deckhouse top; Fidley deck, including top of galley; deck locker; battery locker; emergency diesel generator room; fan rooms, including approximately three inches of coaming and deckhouse in way of sandblasted decks.
Blasting to be scheduled in such a manner that surfaces will be reasonably bright at the time of coating application.
Spray apply two (2) coats of Humble Epoxy-Mastic 9664 Red.
Minimum dry film thickness per coat - five mils - drying time between coats - twenty-four hours.
NOTE: The drying time indicated above for the body and.finish coa ts of the coating system are the so-called "normal1' dry ing periods required for the coating materials to be applied. The"normal" drying times are offered for guidance only.
For any particular coating application, the prevailing atmos pheric conditions may shorten or extend the required drying time beyond the "normal" period. Accordingly, the decision as to when each particular coating is ready for overcoating, etc., will be made by the Owner's Representative or appointed inspector.
Surface preparation and application of coating to meet approv
al of Owner's Representative.
Paint will be supplied by Owners.
MESSRS:
Mr.Ireland,Humble Oil & Ref.
Copies:
Rutter
Ordered By.. 9.?....... thru. Mr ....Challpner..............
Production Department Boykin Inspection Department Howell
717-S
Proceed with work and charge to J. O
..................
Purchasing Dement Borders
L. C. Robertson
ftS&tSZ
SSu""
****.......................................KSiKnBPS*
McWilliams Klink Hiemenz Knight
Challoner Hassell Godsey USCG-1
ABS-1 mlh/70
EXX-MOR-005858
Fm. 40-4
Newport News Shipbuilding and Dry Dock Company
Order No........ (Supt*.. 11)
JOB ORDER ................................. May 13...........l9J>3
_For....................................................S...S....E...S..S..O......G..E...T..T..Y..S..B...U..R..G................................................................
By Contract %............................
DESCRIPTION
'36'' 118.
STEAM LINE TO DEEP TANK HEATING COILS (103) Crop ancl renew one (l) section l" dia. x 91 long, bent, flanged one end, X-heavy steel pipe in steam line to deep tank heating coils, located fwd. pump room, at manifold.
MESSRS: Rutter Boykin Howell Borders Feddeman ALL FOREMEN Hiemenz
Knight Challoner Hassell Godsey
USCG-1 ABS-1
mlh/120
Copies: Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept.
Mr.Ireland, Humble Oil & Ref.Co.
Ordered
.......................
Proceed with work and charge to J. Q..
............
........................................... L,.C.._..Rpbertspn.........
Cost Engineer
Manager of Ship Repair
EXX-MOR-005859
Fm. 40-4
Order No
Newport News Shipbuilding and Dry Dock Company
JOB ORDER
lHlS(Supt. llQ..
............................May.. 1.3.................191-63
For ...................... ...................... SS..ESSO..GETTYSBURG..............................................................
By Contract $............................
DESCRIPTION
CANCEL ITEM 28 - CARGO HEATING STEAM PIPE
ibV
99-B.
MAIN CmOUMTING PUMP-Warren-Size 3USLMV-6-PM 25000 (303) INSURANCE CLAIM NO. Remove complete defective rotating element, including casing rings, bearings and couplings. Crate and ship via motor freight, prepaid, to:
U. S. Metallic Packing Company 150-170 Lynhurst Avenue Rose Bank
Staten Island 5, New York MARKED: "FROM SS ESSO GETTYSBURG .
Repair and Return to Vessel"
3D0
10-A.
MAIN CONDENSER (303) Renew five "(5) air nozzle baffle plates for main condenser water box. Brass, approx, size 1/2" x 10" x 5% drilled with l" dia. orifice in center of each hole, and two (2) 13/16" holes.
<*0, 106. '
BOILER VALVES (303) Renew1 one '(1) packing gland eye bolt and renew welded steel lug for gland eye bolt, one each for two 3/^" boiler valve bonnets. Bonnets removed and replaced by ship's crew. Approx, size each bolt 7/16" dia. x 2" long.
)liS 107.
LOW PRESSURE DOUBLE EFFECT DISTILLING PLANT (303) a. Crop l|-" Cu-Ni feed line to 2nd effect in way of defective
weld. Install lv" brass tee. b. Renew two (2) ijj steel flanges in feed line to 1st effect
Use brass flanges.
595^ 108.
STRAINER BASKET FOR SALT WATER REDUCING VALVE STRAINER(303) Renew one (1) strainer basket for "salt water reducing valve strainer. As per sample. Approx, size 7" I.D* x 10". Use monel material.
Copies: Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept
Ordered By........................................ Proceed with work and charge to J. O
Cost Engineer
Manager of Ship Repair
EXX-MOR-005860
717-S(Supt. 11)
SS ESSO GETTYSBURG
Page 2
3.6b
lQ-A
RELIEF VALVE FOR FEED PUMPS (303) Remove from vessel to shop one (l) 2" feed pump discharge relief valve, open* machine, seat and disc, grind in, renew defective parts, reassemble, renew bonnet gasket, test, prove tight at required pressure (1150 lbs). Deliver to vessel's Engine Dept, storeroom,
3V b 87-A. VALVES - ENGINE ROOM (303) Scrap 8" globe stop check valve. Install Owner's furnished 8" gate valve. Furnish and install one (l) 8" dia, x 7^" flanged Cu-Ni spool in way of above gate valve and pipe.
5bt> 109,
MAIN CONDENSER INSURANCE CLAIM NO, Remove LP turbine Inspection plate and inspection plate from condenser well for examination. Clean bottom of condenser and condenser well. Replace Inspection plates, renew gasekts,
prove tight,
)&rO
18-B.
ENGINE ROOM ATMOSPHERIC VALVE ESCAPE PIPE (303) Install In 5" elbow of 'escape pipe from engineroom atmos pheric valve one (l) 4" dia, x 9" long flanged nipple. Install bolted blank.
, HO,
STEAM OUT LINE TO MAIN CIRCULATOR SEA CHESTS (303) Renew defective section of 3/4" dia,, flanged, bent pipe, steam out line to main circulator sea chests. Use extra heavy steel pipe, approx, 16 ft, long.
74r 111.
DRAIN LINE FROM STBD, IK SOOTBLOWERS (303) Reweld 1/4" steel nipple drain from bottom IK sootblower starboard boiler.
Zbo 112.
GASKETS -MACHINERY SPACE (303) a. Renew lv" 'flexltallic gasket inlet flange of angle cutout
valve to air ejector reducing valve, b. Renew inlet flange gasket of 5" master steam smothering
valve.
113 STEERING GEAR OIL VALVE (303) Remove to shop one (!) if' valve tagged D on top of port for ward steering gear room, Vee out porous weld and reweld. Test to required pressure, prove tight and reinstall using new gaskets. Remove air from system. Test and prove In good operating condition.
, If to
25-A.
CARGO VALVES AND REACH RODS (513) Disconnect and remove to shop the following cargo tank ballast valves. Open, machine - seats and discs, grind in, renew bonnet gaskets, repack valve stem, reassemble, renew defective bolts and nuts. Test to required pressure, prove tight. Reinstall, renew gaskets, holts and nuts, prove tight, #4 center tank one (l) 8" ballast stripper valve, free up
reach rod, #6 center tank - one (l) 8" b^Jggt sipipper valve,free up
717-S(Supt.ll)
SS ESSO GETTYSBURG
Page 3
, 114. DECK STEAM LINE (103) (a) ftenew one (l) section 3" dia, extra heavy steel pipe, approx, 91 long, 2 bends, flanged, in steam line to #8 Mooring winch (next to valve). Renew gaskets, bolts and nuts. Renew pipe hanger (l). Insulate pipe and cover with water proof coating,
(b) Renew one (l) section 5" dia. x-heavy steel pipe, flanged, straight, approx. 18* long with one (l) 2|" flanged outlet approx. 6" long. One (l) l" threaded spud and one (l) 3/^" threaded spud, in deck steam line at cargo winch steam valve connection,
XXb 115. STEAM SMOTHERING SYSTEM (103) a. Renew one (l) section 3" dia, extra heavy steel pipe approx. 32" long, flanged, bent, steam line smothering to manifold
for #4 and #5 cargo tanks,
b. Renew one (l)^ection of l|" dia, extra heavy steel pipe, approx. 191-6" long, 4 bends, 1 union, 1 elbow (90 deg.), 2 flanges, steam smothering pipe as designated.
}lif
116. COOLING AND SANITARY WATER LINE TO MIDSHIPS (103) Renew bulkhead flanged spool aft bhd, of pumpman1 locker
midships. Approx, size 3" dia. x 12" long. Use 90-10 CU-NI pipe.
} 16r 117.
APT WOODEN DOOR NAVIGATING BRIDGE DECK (103) Refit'and adjust aft wooden door navigating bridge deck. Prove door in good working condition.
Sfd'b
39-A. RADAR MAST (103) a. Renew twenty-seven (27) 3-electric cable hangers, approx,
size 1/8" x l" x 5i" x 2" legs; five (5) 2-cable and three (3) 1-cable hangers on radar mast.
b. Renew eight (8) wave guide hangers approx, size 1/8" x l" x 4" x l" legs. Renew eight (8) wave guide guard clips, approx, size 1/8" x l" x 2" long. Move and replace in good order light storage box.
Apply two (2) coats of primer and one (l) coat of color paint to new clips and damaged areas.
qob
44-A. SEA VALVES, CHESTS AND STRAINERS (103) Disconnect 3'b" main condenser overboard discharge valve, remove to shop. Install blank shell opening. Open up valve. Renew valve stem nut (brass). Remove defective rubber coating from valve, sandblast (NOTE; protect gate seats while blasting), and apply two (2) coats of Poxitar to areas. Allow overnight drying before applying 2nd coat. True up valve stem, threads. Reassemble, renew bonnet gasket, repack valve stem, test,prove tight. Replace, renew flange gaskets, bolts and nuts. Prove In good working order and tight.
Fm. 40-4
Order No -,,r
Newport News Shipbuilding and Dry Dock Company
12-1?$ ?upt... I2.1
JOB ORDER
.......................... May .13..................19-63
SS ESSO GETTYSBURG
By Contract $............................
DESCRIPTION
133 it
101-A. CARGO TANK BALLAST PIPING BULKHEAD SPOOLS (523)
Sandblast inside of eleven (ll) bulkhead spools for cargo tank ballast piping* size 12" dia. x approx. 5 ft, long and coat with Humble Rust Ban 191. Located in the following tanks: #4 port* center* stbd,; #5 center*; #6 port* center* stbd.; #7 center; #8 center; #9 center;and #10 center
Remove and replace six (6) 12" valves for blasting and
coating of spools.
.
Remove sand and clean the above tanks.
MESSRS: Rutter Boykin Howell Borders Feddeman Neill Bunch HI ink Hiemenz
Knight Thalloner Hassell Godsey USCG-1 ABS-1
mlh/75
Copies: Production Department Inspection Department Purchasing Department Gen!. Acct. CUef Timekeeper Tabulating Dept.
Mr. Ireland* Humble Oil &..Ref. Co. Ordered By........... ^ru..Mr>.,_^lloner..............
Proceed with work and charge to J. 0.....7.17-S.......... .
Cost Engineer
.................. L. ,,.9..t.. R.?.be r tson._
Manager of Ship Repair
EXX-MOR-005863
32.6^
Fm. 40-4
r ) )
Newport News Shipbuilding and Dry Dock Company
, x JOB ORDER
,^
Order No....................................................................................................... .MaZ.i.4..................ift-S?
For SS ESSO GETTYSBURG..................................................................
3y Contract
DESCRIPTION
6-a. astern throttle valve(303)
Crop and renew brass stem nut approx, 3-9/16" dia. x 12" long, welded to gear. Renew two ball bearings. Adjust clearance
between valve stem and valve disc.
100-A.750 KW STARBOARD GENERATOR TURBINE AND GEARS
INSURANCE CLAIM NOT
"
C. of item 100 to read: Furnish and install.
STARBOARD THROTTLE VALVE FOR STARBOARD GENERATOR TURBINE Disconnect and remove to shop throttle valve for starboard generator turbine. Open for examination, machine seat and disc as found necessary, gpind in, renew bonnet gaskets, repack, check valve spindle and nut, also overspeed trip latch gear and renew all worn parts as required. Test valve, prove tight. Replace valve, renew gaskets, defective studs and nuts, test, prove tight and in good working order. Replace insulation as original. Size 3".
98-A.MAIN CIRCULATOR PUMP MOTOR - G.E., HP 200
Insurance claim no~
Machine slip rings, refit brushes. Dynamically balance rotor.
MESSRS: Rutter Boykin Howell Borders Feddeman ALL FOREMEN Hiemenz
Knight Challoner Hassell Howe USCG-1 ABS-1
mlh/120
<j$/12C> ^ t
Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept.
Mr. Ireland, Humble Oil & Ref. Co. Ord,ered. DBy......t.h...r..u.....M....r.......C....h...a...l.l.o...n...e..r.....................
Proceed with work and charge to J. O....... X.-L7.C.?....... .
Cost Engineer
L. C. Robertson........
* Manager of Ship Repair
EXX-MOR-005864
Fm. 40-4
Order No For........
/'
Newport News Shipbuilding and Dry Dock Company JOB ORDER
...............................Mai.. 15 SS ESSO GETTYSBURG
By Contract $............................
DESCRIPTION
19.J.3
y*fbO
50-A.
.
INSURANCE CLAIM NO. 270(En Route Boston to Newport News)
CARGO TANK BULKHEADS .
`
Vee out and reweld the following fractured transverse bulk
head angle stiffeners where stiffeners weld to shell and
longitudinal bulkhead thru brackets:
#6 Port Cargo Tank - Fwd. Bhd.
lHboaxd_l;FT^7~^3--stiffeners 2 fracture
At shell - #7,8,9,10,11,12,13,14,15 & 17 = 10 fractures
#6 Stbd,Cargo Tank - Fwd. Bhd.
' Inboard -' '#10,11,12, 13 - = 4 fractures
Shell - #9, 10, 110, 12, 13, 14 6 fractures
#7 Port Cargo Tank - Fwd, Bhd.
Shell - #3, 9, 10, 11, 12, 13, 14, 15 = 8 fractures
#7 Port Cargo Tank - Aft. Bhd.
Shell - #8, 9, 10, 11, 12, 13, 14, 15 = 8 fractures
#9 Port Cargo Tank - Fwd. Bhd.
Shell - #11, 12 *= 2 fractures
/ S T> 91-B.
ALCOHOL AND SOLVENT CONVERSION Sandblast inside and outside and coat with Humble Rust Ban 191 two (2) 6" visible wedge valves.(Owner furnished). NOTE: Protect wedges, ring, seats and threads during '
blasting and coa ting.
-y 5 o ?4rd
r 75
76- A.
CARGO PIPE AFT PUMPROOM (523) Renew one (!) section cargo pipe in aft pumproom. Use extra heavy steel pipe. Sandblast and coat with Rust Ban 191 in side and outside, dia. l6" x 16-3/4", flanged one end, starboard inboard line at l6" gate valve.
77- A.
NO. 3 CARGO PUMP TURBINE & GEARS (503) Chrome plate and machine to original size governor and jour nal, metal spray and machine to original size In way of carbon packing coupling end turbine rotor #3 cargo pump turbine.
Balance rotor.
82-A. FORWARD ANCHOR WINDLASS (303)
c. Renew steam valve stem. Material size 2" dia. x 19" long.
MESSRS:
Rutter Boykin
Copies: Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept.
Howell Borders Feddeman Neill Bunch Overman Klink Mahler
Mr. Ireland, Humble Oil & Ref. Co. Ordered By..............thru..Mr._.Challoner...........
Proceed with work and charge to j. O......7.4.7.-S...........
L. C. Robertson
Cost'Enainoar.................................................... Manager of Ship Repair
Knight
Webb
Challoner
ABS-1
Schmidt
Hassell
Jones
Godsey
mlh/90
Hiemenz
USCG-1
EXX-MOR-005865
LOCATION Of COASTWISE LOAD LINES
rrrrrrri I--{2*M
01 SO 3--FORWAOO--**-
k UM Lss k*4 uj1 ''s*
~ >i **'
- Vj^iJ wttVmUal\i S
OFHCIAL fits, ^
27".................
j SAME OF VESSEL
i
S3 "2S30 GETTYSBURG*
I ...............................................................................
. . .......
CE2TTEB OF DISC below the top of Steel Upper
dock Bn
vUH^-i.*J.Lw>k
! PORT OF aECSSTHY
Wllirdagpori, Bei0
.....
Fesl
Inct'iS
3a
1j
-j
MAXIMUM LOAD LINE in Tropical Fresh Water, above tho center of Disc
" " in Fxoali Water, above the center of Disc
" " In Tropical Senes, above the cantor Disc above
" " in Summer, 3i2i the canter of Disc
2 1-3/U
-- . 4i/k
. 3~l/
- 6-lA
" " in Winter, below the center of Disc
5
" " hr Winter North Atlantic, below the center of Disc
~
HOit.--Top cl Wood dock k iho lino ot wood deckeanlod out so ship's sia on scan combo? at bacon.
Top of Stool deck Is top of stringer plots <sl ship's side.
Humble Gil L Reiining Co
JAN 18 1S63
NEW YOKE,
| _________________ 1
Y
Gentlemen:
i
f I cun directed to inform you that your application for a Certificate of Approval of the position of a load \
l line Disc for the above-mentioned vessel hasreceived consideration, emd I am to advise youthat aracorn- >
i mendaiioa has been placed beforethe Committee that they shouldapprove of the position of such Disc if f
f placed as noted above, subject to
{
j NOTE?
I
I See attached sketch for location of Coastwise load, lines*
;
Please stale when and what Port the load Lines will be marked upon tho vessel's sides in order that the Surveyors to this Bureau may verify the markings, and that the necessary Certificate of Approval may be issued.
ChJa; Surveyor.
EXX-MOR-005867
Fm 40-4
(
Newport News Shipbuilding and Dry Dock Company
Order No....... . JL5 )
JOB ORDER
................ Mayl6........................... ,963
For ........................................................ SS ESSO ..GETTYSBURG.....................................................
By Contract $............................
DESCRIPTION
t/OO 120.
COASTWISE LOAD LINES (103) Install upon vessel's sides Coastwise Load Lines as per attached instructions. Load lines to be center punched and painted white. Markings to be verified by ABS Surveyor.
Ulb
100-B.
750 KW STARBOARD GENERATOR TURBINE AND GEARS INSURANCE claim no. a. Generator Turbine Atmospheric Relief Valve-Size 8"- Renew
seat, renew two(2)' stainless steel adjusting rods,approx, size each 5/8" dia. x 8", build up by brazing and machine valve disc. Renew two(2) springs as per sample. b. Throttle Valve - Machine and reweld fractured welding of seat of throttle valve. Size 3". c* Rub OH Cooler - Renew as per sample strainer basket for lube oil cooler water box. Material #16 gauge CRS. Renew division plate in, head for water box, approx, size 1/2" x 12|" x If" steel, welded. Apply two (2) coats of Poxitar to heads and water box.(Poxitar furnished by vessel.
36 121 STEAM STOP VALVES (303) "Furnish eight (8)' packing gland swing studs as per sample, approx, size 5/8" dia. x 4-3/4" long for feed pump steam stop valve packing glands.
/ 6*0
18-A.
RELIEF VALVES, MACHINERY SPACE (303) Renew valve disc guide, material size 6" x 4|". Renew seat material size 8" x 3'D gun metal for 5" -35 lb. atmospheric exhaust valve.
226^
9-A. TURBINE FOR #1 MAIN FEED PUMP-G.E. 575 HP (303)
INSURANCE CLAIM NO.
Build up by welding steam cuts in valve seat landing of
control valve body, machine and renew valve seat (furnished'
by vessel). Test, prove tight. Turbine for #1 Main Feed Pump,
MESSRS:
.
Rutter
Boykin
Howell
Borders
Feddeman Copies: Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept.
ALL FOREMEN Hiemenz
Knight C'nalloner Hassell Godsey USCG-1
Mr.Ireland,Humble Oil & Ref.Co. Ordered By...... thru..Mr...Challpner...................
Proceed with work and charge to J. O......7...1..7..-..S............ .
Cost Engineer
L. C. Robertson
Manager of Ship Repair
ABS-1
mlh/120
EXX-MOR-005868
' Fm. 40-4
V
V.
Newport News Shipbuilding and Dry Dock Company
Order No.....71.7-?.(Supt . l6)
JOB ORDER
......................... May 17................... 19. 63
- SS ESSO GETTYSBURG
Sc> 0
By Contract $............................
DESCRIPTION
44-B.
SEA VALVES, CHESTS AND STRAINERS (CONTINUED) two (2) coats of Poxltar to interior of valves (furnished by vessel) : One (l) 4" -Gen. Lube oil and air cooler overboard valve
One fl) 3" -Cargo and Feed pump oil cooler overboard valve. One (1) 4" -Bilge pump overboard valve One (l) 3" Ice machine condenser and feed water test cooler
overboard valve.
100-C.
730 KW STARBOARD GENERATOR TURBINE AND GEARS
INSURANCE CLAIM NO.
'' ' '
Check, repair as necessary., adjust, prove in good working
order the following equipment for starboard 750 KW Stbd.
generator:
1 - Voltage Regulator
1 - Low Voltage Trip
1 - Reverse Power Relay
1 - AC Volt Meter
1 - DC Volt Meter
1 - DC Ampere Meter
1 - Frequency meter
1 - Stator Temperature Indicator
MESSRS: Rutter Boykin Howell Borders Feddeman ALL FOREMEN Hiemenz
Knight Cha1loner Hassell Godsey USCG-1 ABS-1 mlh/120
Copies: Production Department inspection Department Purchasing Department Gen!. Acct. Chief Timekeeper Tabulating Dept.
Mr.Ireland,Humble Oil & Ref.Co.
Ordered By4'5ru.
...........................
Proceed with work and charge to J. 0... 7.1.7-S.......... .
............................. Xi.....C...Robert.s.o.ja..............
Cost" Engineer
""
Manager of Ship Repair
EXX-MOR-005869
Fm. 40*4
" Newport Mews Shipbuilding and Dry Dock Company JOB ORDER
Order No... ..................................................................................................... May.il. For................................................... SS..ESSO__GEKreSBimG....................................
.1*63...
9Z6X
By Contract $............................
DESCRIPTION
27-A.
PORT AND STARBOARD CARGO STRIPPING PUMPS (503)
Warren-Vert.' Duplex l6n""x 14" x lb" Furnish' thirty-five (35) liquid end disc valve stems, as per sample, approx, size 3/4" x 9/16" x 6-j/' long,
enew four (4) liquid end piston rods, approx, size 2-5-" dia. x 38" long. Navy roll bronze. Machine and Install Darcova piston for inboard cylinder of stbd. pump. Darcova piston furnished by Owners. Machine and install Darcova piston for Inboard cylinder of port pump. Darcova piston furnished by Owners. Renew one (l) steel Bl4 steam cylinder rod. Approx, size 2^" dia. x 37" long. Cancel - Remove and machine suction and discharge valve seats.
/ 6` 0 122 .
EVAPORATOR (303) Renew one (Tj section extra heavy galv. pipe dia. 2" approx. 10'-6" long, flanged, 2 bends overboard blow line from evaporator.
116 123.
NO. 1 MOORING WINCH (303) Remove control valve to shop, drill and tap end of control
valve stem and install one (l) 5/8" x 3" threaded stud. Polish control valve. Replace in control valve cylinder, renew flange gaskets, defective studs and nuts, repack valve stem. Prove in good working order.
>10
82-B.
FORWARD ANCHOR WINDLASS (303) Renew, fit and adjust to proper clearance three (3) crank shaft bearings (furnished by vessel). Adjust both crank shaft and crosshead bearings. Repack piston rods.
i *4Td
44-B. SEA VALVES, CHESTS AND STRAINERS (103)
Clean bodies and bonnets, and renew guides in the following
gate valves. Apply two coats of Apexior to the Inside of
valves*
,
6" Lube oil cooler overboard gate valve
3" Heating coil drain cooler overboard gate valve
2" Evaporator overboard globe valve, weld up body in way
of division.
Furnish and install the following 150 lb. gate valves,apply
Copies: Production Department inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept.
Ordered By.................................................................... Proceed with work and charge to J. O...........................
Cost Engineer
Manager of Ship Repair
EXX-MOR-005870
qbb Zbb
Fm. 40-4
Order No
Newport News Shipbuilding and Dry Dock Company
717-S(Supt...17)
JOB ORDER
....................... Ma^.20.......................19.J23
For..............................................SS..ESS0 GEOTYSBURG........................................... ......................
By Contract $...............................
DESCRIPTION
103-A.CARGO TANK BALLAST PUMP TURBINE (503) G.E. Chrome plate and machine to original size governor end journal, check coupling end journal for true and round. Fly ash and balance rotor.
10-B, MAIN CONDENSER (303) Renew one(l) section air nozzle pipe approx._l"^dia. x 4' long. bent. Use 90-10 Cu-Ni tubing. Renew three (3) 1#". hanger caps and bolts for air escape pipe, Material monel, 1/1' 6" thick. Size bolts 5/l6" x l".
91-B. ALCOHOL AND SOLVENT CONVERSION (C) Alcohol Pumps. Warren" Vert. Duplex l6 x l4 x 18" Cancel renew Owner furnished liquid end liners. Install nextf steam piston for starboard cylinder of starboard pump. (Piston furnished by vessel).
MESSRS: Rutter Boykin Howell Borders Feddeman Overman Klink Webb Schmidt Hiemenz
Knight Challoner Hassell Godsey USCG-1 ABS-1
mlh/80
Copies: Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept.
Mr.Ireland, Humble Oil & Ref. Co,
,, , ,_
thru Mr. Challoner
Ordered By..............................................................................
Proceed with work and charge to J. 0.....7. !.1..7...--..S................
Cost Engineer
L. C. Robertson
Qf Ship Repair
EXX-MOR-005871
Fm. 40-4
i
(
Newport News Shipbuilding and Dry Dock Company
JOB ORDER
Order No........... m~3.L.m.tL... 18 )
....................................May.. 21........ ,9. 63
For...................................................... SS..ESSg..GETTOSBURG.........................................................
By Contract $...............................
OESCRIPTION
CANCEL ORIGINAL ITEM 110 AND REISSUE AS FOLLOWS:
6 110-A. STEAM OUT LINE TO MAIN CIRCULATOR SEA CHESTS (303) Renew defective pipe and fittings* steam out line main circu lator sea chests; also LP evaporator sea chest. Size 3/^" dia. approx, 60 ft.* bent* 6 flanges. Use extra heavy steel pipe.
0 Lte
CANCEL ORIGINAL ITEM 113 AND REISSUE AS FOLLOWS;
113-A. STEERING GEAR OIL VALVE (303) Weld inplace caulked spot In weld of One (l) l-n valve tagged D on top of port forward steering gear ram.
124.
THROTTLE VALVE FOR PORT 750 KW GENERATOR TURBINE (303)
Overhaul same as 100-A.
..
3 2 19-A. VALVES MACHINERY SPACE (303) Overhaul exhaust valve of ballast pump turbine same as
Item 19. Size 5".
MESSRS: Rutter Boykin Howell Borders Feddeman Overman Klink Webb Schmidt Hiemenz Knight Challoner Hassell Godsey USCG-1 ABS-1 mlh/80
Copies: Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept.
Mr.Ireland* Humble Oil 8s Ref.Co.
Ordered
..........................
Proceed with work and charge to J. O........T.lZr.S.........
................................. L.....C.,...Robertspn................
Cost Engineer..........
Manager of Ship Repair
EXX-MOR-005872
Is, 0 ts
boo
Fm. 40-4
Order No... For............. By Contract
f
Newport News Shipbuilding and Dry Dock Company
7l7-S(Supt. 19)
JOB ORDER
............................ May..?.?......... 19__63
' SS ESSO GETTYSBURG ........................................................
.........................
DESCRIPTION
50-B. INSURANCE CLAIM N0.270(En route Boston to Newport News) CARGO ~ TANK BULKHEADS 3 Repair the following fractured transverse bulkhead angle stiffeners as in Item 50-A: #5 Port cargo tank - Fwd. bhd. At Shell - #10* #11* #12 stiffeners = 3 fractures #5 Starboard Capgo Tank - Fwd. Bhd. Inboard - #15 stiffener = 1 fracture At shell - #5 *#9 .>#10 *#11 *#12 *#13 stiffeners = 6 fractures
91-c. ALCOHOL AND SOLVENT CONVERSION Install in deck near 6" drop line to #1 port., #1 starboard* #2 port* #2 starboard cargo tanks - One (l) double extra heavy 1/2 inch threaded steel coupling welded in deck. Install in
each tank one (D section of " dia. brass pipe 15 ft. long.
Install two (2; 1/2" pipe clamps to each section of brass pipe. Clamps to be sandblasted and coated with Humble Rust
Ban 191.
Install on deck in each coupling one (l)
x 1-1/2" extra
heavy brass nipple* one (l) 1/2" brass 90 deg. elbow* one
(1) 1/2" brass plug. Elbow.to be installed facing inboard.
MESSRS:
Rutter
Boykin
Howell
Borders
Feddeman
Overman
Dunn
Klink
Webb
Schmidt
Hiemenz
Lenhart
Knight
Challoner
Hassell
Godsey
USCG-1
Copies: Production Department
ABS-1
Inspection Department Purchasing Department mlh/85
Genl. Acct.
Chief Timekeeper
Tabulating Dept.
Mr.Ireland* Humble Oil & Ref. Co. Ordered By.......... fcjbru..Mr*...Ghalloner........... --
717-S Proceed with work and charge to J. O......................... ....
L. C. Robertson
Cost Engineer.......................................................Manager of Ship Repair
EXX-MOR-005873
//> D 3^ qbo
}0
Fm. 40-4
r
c
Newport News Shipbuilding and Dry Dock Company
Order No....Il.7-S.CSu.Et ,...20)...
JOB ORDER
...................... May... 23......................19.-6
For ........................ '................ SS.JSS0_..GEOTySBURG....................................................................
By Contract $............................
DESCRIPTION
79- A. CONDENSER -AIR CONDITIONING- SYSTEM -MIDSHIP (303) Fabricate new heads two" (2) for midship air conditioner freon condenser1. Approx, size TJ^" dia. each head with one (l) 3"
dia. flanged outlet. Sand blast inside of head and apply two (2) coats of Poxitar to each head. Poxitar furnished by vessel
77~B. NO, 3 CARGO PUMP TURBINE & GEARS (503) Chrome plate and machine to original size coupling end bear ing journal.
80- A.
FEED PIMP TURBINES(G.E. 575 HP)(303) Install new nozzle plate in #2 and #3 feed pump turbine casings. (Nozzle plates furnished by vessel).
Remove to.shop #2 and #3 feed pump turbine rotors. Check bearing journals for true and round. Polish shafts in way of carbon packing. Balance rotors3 free up couplings and return to vessel.
19-A.
VALVES - MACHINERY SPACE (303) Overhaul same as Item 19... One (l) 3?" angle valve bilge suction fwd. .engine room starboard side.
MESSRS: Rutter Boykin Howell Borders Feddeman ALL FOREMEN Hiemenz Hassell Knight Challoner Godsey ABS-1
USCG-1
mlh/120 Copies. Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept
Mr.Ireland., Humble Oil & Ref. Co. Ordered By............. ^ru Mr . Challoner..... ......
Proceed with work and charge to J. 0..7.17.t..;.............
........................ .........L_... C.t. .Roberts on..................
Cost'Engineer".................................
Manager of Ship Repair
EXX-MOR-005874
99S6.
7
EXX-MOR-005875
ZLbb >2.6 ^
'
Fm. 40-4
Newport News Shipbuilding and Dry Dock Company
Order No......-.Sll.
JOB ORDER
................... ..........lav. 2.4................ 19...6.3
For.......................... ;;........................ SS.JSSO..GETTOSBURG...........................................................
By Contract $............................
DESCRIPTION
50-B. INSURANCE CLAIM NO. 270(Enroute Boston to Newport News) CARGO TANK BULKHEADS . Repair the following transverse bulkhead . angle stiffener fractures same as Item 50-A: #4 starboard tank -forward bulkhead -Outboard -6,7,8,9*10, 11, 12, 13 stiffeners = 8 fractures #4 Starboard tank -inboard - #10, 11 stiffeners** 2 fractures #4 Port tank fwd. bhd.-Outboard- #7,>,9,10,11,12,13*14 = 8 fractures Clean and coat damaged areas with Humble Rust Ban 191.
125.
STARBOARD GENERATOR THROTTLE DRAIN VALVE (303)
Renew welded 1/211 valve In drain line from throttle valve of starboard generator turbine. Replace disturbed Insulation. Valve furnished by vessel,
44-C . SEA VALVES, CHESTS AND STRAINERS (103) Remove to shop 4ir stop check globe valve, overboard discharge from port stripper, open up, renew broken valve disc guide, stem, renew seat, prove tight. Install, prove in good working order. Renew one (l) 4" angle stop check valve overboard discharge from electric bilge pump, 125?#.
126.
ANODE SHIELDS (.103) Sandblast white spots of six (6) capastic anode shields and white spots of two (2) rubber anodes shields as directed and recoat bare spots with Capastic as directed. Capastic furnished by Owners.
Apply Capastic to a 12' dia, shield for the four forward anodes. The dia. of shields now 10*. Sandblasting of area covered In item 60. Renew missing sections of guard for forward port anode, will require 1 section 6 ft, long shaped, one 4 ft. section, one l1 section, welded, size 2^" dia. steel rod.
Renew missing section of guard for forward starboard anode, requires one (l) 4 ft. section of 2" dia. steel rod, vee out and reweld two (2) fractures.
Copies: Production Department Inspection Department Purchasing Department Genl. Acct.
Chief Timekeeper Tabulating Dept.
Ordered By...................................................................... Proceed with work and charge to J. 0.............................
Cost Engineer"........................................
Manager of Ship "Repair
EXX-MOR-005876
Fm. 40-4
Order No. For.........
Newport News Shipbuilding and Dry Dock Company
JOB ORDER
.li7-S.CSu.pt.....22) .
..................................... Max.. 27,
- SS ESSO GETTYSBURG
19....3
// 0 o
By Contract $............................
DESCRIPTION
22-A . INSURANCE CLAIM NO. 174 (STRANDED MISS.RIVER 3110X9,-11,1962)
a. #1 Port Cargo Tank Internal Damage '
'
Crop web frame 104 in wav of damage and renew section 54" x 92"
x 20.4# plate with two(2) flat bar stiffeners 7/16" x 5" x
4'-6".
..
Sandblast new steel and damaged areas and coat with Humble Rust
Ban 191.
-
Weld twelve rivets, caulk (30) rivets and caulk 15 ft. of rivet ed seam In way of frame 104.
b. Bilge Keel Port Side- Trim ends of bilge keel port side.Two
ends.
)bnb
129.
HULL REPAIRS POUND AFTER DRYDOCKING VESSEL (103)
a. Rudder- Reweld 11 ft. of wasted welded seam.bottom of rudder
fwd, end port and starboard side.
Reweld 1 ft. fracture weld bottom edge of rudder nut fair-
water stbd.side. Reweld 1 ft. fracture weld of in way erec
tion hole cover plate stbs. side of rudder near top.
Furnish and Install 1-|" drain plug and fitting bottom of
rudder forward end.
b. Weld twenty-six (26) rivets, E, F rivet lap in #2 and #3
port tanks.
.
Caulk 40 ft. of outboard riveted lap as marked in way of
#3, 4 and 5 stbd. tanks.
32/ 130.
EMERGENCY GENERATOR SWITCHBOARD (303)
Check out feed back also transfer switch of emergency generator switchboard, repair as necessary. Test and prove in good work ing order.
. 128-A.FORWARD PUMP ROOM CARGO PUMPS
Item 128 - cancel installing reach rods to exhaust valves to
pumps In fwd. pumproom. Install reach rods to steam valves
only. A total of two (2) reach rods.
MESSRS:
..
Rutter
Boykin
Howell
Borders
Neill
Baxter
Overman
McWilliams
Copies: Production Department inspection Department
Dunn Klink
Purchasing Department Mahler
Genl. Acct.
Webb
Chief Timekeeper Tabulating Dept.
Schmidt Jones
Mr,Ireland, Humble Oil & Ref. Co.
Ordered By....... .............................................................. Proceed with work and charge to j. O.7...1..7...-.S........ ..........
L. C. Robertson
Cost Engineer"..................
" Manager of Ship Repair
Hiemenz
Hassell
Lenhart
Godsey
Knight fThn 1 1 nnor>
USCG-1 ARR-1
mlh/100
EXX-MOR-005877
Fm. 40-4
Newport News Shipbuilding and Dry Dock Company
Order No....IH"S(Supt.__ 22)___
JOB ORDER
...........................May. 27................ 19.6_3
Pnr ' SS ESSO GETTYSBURG
600
By Contract $............................
DESCRIPTION
44--B. SEA VALVES, CHESTS AND STRAINERS (103) Furnish and install one (l) 2" flanged, gate valve, 150 lb. electric fire pump overboard. Furnish and install one (l) 3in flanged, 150 lb, gate valve,aft air condition condenser overboard. Remove preservative from inside of valve and apply two (2) coats of Poxitar, furni&ed by vessel), to interidr of valves.
100-D.750 KW STARBOARD GENERATOR TURBINE AND GEARS
INSURANCE CLAIM NO.
'
When finished removing parts needed on the ESSO GETTYSBURG
ship the loaned generator turbine,prepaid motor freight,
consigned to:
DeLaval Turbine, Inc,
Repair Department-South Plant
Trenton, New Jersey
MARK: "Property of Orion Trading & Shipping Co,
Refer to Humble Oil & Refining Co. Order DC-^556".
/6roo
100-E.750 KW STARBOARD GENERATOR TURBINE AND GEARS
INSURANCE CLAIM NO.
'
a. Remove defective CM DeLaval Turbine Speed Governor Element,
crate and ship it prepaid motor freight consigned to:
DeLaval Turbine,Inc.
South Plant
Trenton, N. J.
Att: Mr. C. M. Watts
MARK:"From Humble Oil & Refining Co.
SS ESSO GETTYSBURG!'
b. Disconnect, remove to shop exhaust gate valve of starboard
750 KW generator turbine. Open up, renew one(l) seat ring, brass
machine disc and seat ring, grind in, renew bonnet gasket, re
pack valve stem, close up, test and prove tight at required
pressure. Replace, renew flange gaskets, bolts and nuts, prove
tight. Replace disturbed insulation as original. Size 20" dia.
LDD
80-B. FEED PUMP TURBINES G.E. 575 HP (303) Machine bea ring journals, chrome plate and machine to original size #2 Feed Pump Turbine Rotor.
Copies: Production Department Inspection Department Purchasing Department Gent. Acct. Chief Timekeeper Tabulating Dept.
Ordered By........................................ Proceed with work and charge to J. O
Cost Engineer
Manager of Ship Repair
EXX-MOR-005878
C
/Z9Q
Fm. 40-4
Newport News Shipbuilding and Dry Dock Company
Order No......... 717-S(Supt. 23)
JOB ORDER
...................................... May 28......19__63
por
S.S. ESSO GETTYSBURG
_
By Contract $............................
DESCRIPTION
44-B.
SEA VALVES, CHESTS AND STRAINERS (103)
a. Renew valve disc guide for high sucticn sanitary pump sea
valve, approx, size 1/2" x 3^" long.
b. Renew bolts and nuts in sea chest flange of auxiliary cir
culating pump suction valve, approx. 12 bolts, size l"
dia. x 3-|" long.
'
c. Disconnect and remove starboard 16" angle cargo pump sea
suction valve to shop. Thoroughly clean eroded areas in
body of valve and in way of seat and build up by welding,
machine and renew seat if necessary, replace seat. Sand
blast entire interior of valve and : apply two (2) coats
of Poxitar to valve body. Grind in seat and disc, grind in,
close up, test and prove tight. Replace, renew bonnet,
flange gaskets, repack valve stem, bolts and nuts.
d. Chip, wire brush, clean pitted area of port cargo pump
sea valve, size l6", approx, size of pitted area 6" x 4".
Fill with Devcon Steel Putty._
e. Free up valve stems of four (4) steam out valves to sea
chests, renew eight (8) 3/8" x 2" steel packing gland
studs.
80-A. FEED PUMP TURBINES, G.E,, 575 HP (303) Cancel balancing #3 feed pump turbine rotor.
MESSRS;
Rutter
Boykin
Howell
Borders
Feddeman
Overman
Klink
Webb
Schmidt
Hiemenz
Knight
Challoner
Hassell
Godsey
USCG-1
ABS-1 Copies:
mlh/75
Production Department
Inspection Department
Purchasing Department
Genl. Acct.
Chief Timekeeper
Tabulating Dept.
Mr. Ireland, Humble Oil & Ref. Co. Ordered By................thru..Mr...Challoner.........
Proceed with work and charge to J.
............
................................. L,.,,C*...Robertson................
Cost "Engineer
Manager of Ship Repair
EXX-MOR-005879
Fm. 40-4
Order No
(
Newport News Shipbuilding and Dry Dock Company
JOB ORDER
I17-S...(.Supt.!...24.}
................June..3.,... 19.6.3.............. 19.
For.............................................................SS..ESSQ..GET.TYSBHRG.
By Contract $...............................
DESCRIPTION
22-B.
Insurance Claim No. 174 (Stranded Miss. River July 9-11, 1962 RUDDER REPAIRS Crop and renew damage section of bottom rudder plate fwd end. Approx, size 18" x 12i! x 40.8# plate. Plate to be "Cor-Ten"
or "Mayari" steel.
IX O
53-R.
RUDDER REPAIRS - 103 Install four (4) welded type zinc plates bottom of rudder as designated. Two zinc plates port;, two plates on stbd. side of
Rudder.
)bO XI6^ 2-^b
131. 98-B. 132.
PORT 750 KW GENERATOR TURBINE (303) Magna' flux two (2) connecting stems of port 750 generator turbine steam chest control valves* steam chest.cover not removed.
.t MAIN CIRCULATOR PUMP MOTOR - G.B.* HP2Q0 Build up coupling in way of bore, by welding* rebore to suit new shaft* true up key way* machine coupling face.
ship stores T o^dr
Furnish crane service and men to load Owner furnished supplies Monday June 3* 1963. @ 10:00 a.m.
MESSRS: Rutter Davis
Howell Borders Feddernan Overman McWilliams
Dunn Klink Mahler Webb Schmidt Jones
Copies: Production Department Inspection Department Purchasing Department Genl. Acct. Chief Timekeeper Tabulating Dept
Knight Challoner Hassell Godsey USCG-1 ABS-1
brb/90
,
i
Humble Oil and Refining Co. Ry thru Mr. Challoner
Proceed with work and charge to J. 0...7.1.Zr:............
Cost Engineer
L.C. Robertson
Manager of Ship Repair
EXX-MOR-005880
- . t.
Fm. 40-4
l
l
' Newport News Shipbuilding and Dry Dock Company
JOB ORDER
- Order No........711"?..'25)
........................ June. 4................... 19...$.?
For S.S. ESSO GETTYSBURG
By Contract $............................
DESCRiPTION
629 0 133. CARGO SYSTEM (503) Repairs found during cargo system test: #8 Center - Renew approx. 33 ft. of 16" dla. extra heavy steel pipe port inboard cargo line; with one(l) l6" dia. flanged outlet approx. 5 ft. long with 90 deg. elbowj one (l) 16" dia. flan ged outlet* bent approx. 6 ft. long. 3 - 16" Dresser couplings. Aft Pumproom: One (l) 8" dia. 3 ft. x 3 ft. flanged tee piece* with one(l) 90 deg. elbow. Sandblast and coat inside and outside with Humble Rust Ban 191.
Open in place* disconnect and remove to shop the following cargo tank valves* open* machine seats and discs* grind in* renew bonnet gaskets* repack valve stems* test to 125 lbs. pressure* prove tight. Replace* renew gaskets* bolts and nuts* replace connecting rods in good order:. #1 center - one (l) 12" angle valve #2 center - one (l) 12" angle valve (renew disc nut) Repack 8" stripper suction valve. #3 center ~ 8" stripper globe valve #6 port - 12" angle valve (cargo system) #8 port - 8" stripper valve #10 port - 12" angle valve Renew one (l) 12" flange gasket Tighten all cargo tank valve packing glands. Prove valve gaskets tight.
2. if D
134. STARBOARD BOILER VALVE (303) Open in place* disconnect and remove to shop 3" starboard boiler generator stop-check valve* renew guide rings* machine disc* grind in* close up* repack valve stem* test to required pressure* prove tight* replace* renew flange gaskets* defective studs* bolts and nuts* prove tight. Replace insulation as original.
ns.r
3.35. LUBE OIL POOLER CIRCULATING WATER PUMP MOTOR (303) Disconnect* remove to shop and rewind motor for lube'oil cooler circulating water pump. Renew ball bearings. Replace, connect up*
test and prove in good working order. 30 HP.
136. GENERAL ALARM BELL SWITCH (103) Repair handle* clean contacts* test and prove in good working order* emergency general alarm bell switch in engine room located
Copies:at l0g aeslProduction Department Inspection Department Purchasing Department Gen!. Acct.
Ordered By.................................................................... Proceed with work and charge to J. O.............................
Tabu Iati ng ePt*
Cost Engineer
*"
Manager of Ship Repair
EXX-MOR-005881
Fm. 40-4
Order No For.........
C' c
Newport News Shipbuilding and Dry Dock Company
717-S(Supt. 25)
JOB ORDER
June 4
SS ESSO GETTYSBURG
By Contract $............................
DESCRIPTION
IQ.*?!
00 )6o
137. COPPER PIPE (303) Repair neoprene coating in copper pipe from main circulator to main condenser also main condenser overboard discharge pipe.
138. DECK SCUPPERS (163) Renew four(4) strainer covers for deck drains aft.
80-C .#3 FEED PUMP TURBINE (303) Renew governor control valve stem #3 feed pump turbine. (Damaged during yard repairs).
139. ESCAPE PIPE (103) Extend escape pipe from steam smothering reducing station thru aft forecastle bulkhead. Requires approx. 61 of 2|" dia.* bent pipe.(Escape pipe previously connected to pump room port vent trunk).
12OA .LOAD LIKE MARKINGS (103) Chip and grind smooth Incorrect International Load Line markings. Install correct International Load Lines. Cut in and weld* clean and paint markings* also damaged areas.
"DEP^TIVE^M SPET3>^qVERK0Il_EIEjENT
/
f/I
'imdTCvfrP^/Ves^el def&e^ive KW Gehg^arcoa^ Tur
CM spqdgn7erhor eiemeKfcunr^ bixi^kaniaBTiip itxprepaid motor
for
to:
ral Tu^bxne^-anc.
^ *D *1 n
MESSRS: Rutter Boykin Howell Borders Feddeman ALL FOREMEN Hiemenz Knight Challoner
Copies: Production Department Inspection Department Purchasing Department Gent. Acct. Chief Timekeeper Tabulating Dept
Hassell Godsey USCG-1 ABS-1
mlh/120
>, ,-Watt Humble
G
Co.
Mr,Ireland* Humble Oil & Ref. Co. Ordered By.......thru.. Mr ...Challoner................
717-S Proceed with work and charge to J. O..........................
L. C. Robertson
Cost Engineer
Manager of Ship Repair
EXX-MOR-005882
Fm. 40-4
Orrlfir No.
For......
C f;
Newport Mews Shipbuilding and Dry Dock Company
71 f-S (Sup C . 2o)
JOB ORDER
.......................... - .
.June...5i9..63
SS ESSO GETTYSBURG
By Contracts............................
DESCRIPTION
'JLHO
l4l.
WHISTLE PULLS (103) Free up, and adjust, bridge and aft steering hand whistle pulls. Prove In good working order. A total of four(4).
lC> ! 26^
142. LIFEBOAT MOTORS foh Check, repair and start two lifeboat motors (diesel).
100-F .STBD. 750 KW GENERATOR GEARS Insurance Claim No. Dye test gear tooth in way of mark for crack . Same found OK. Gears for stbd. 750 KW generator.
) bO
2/0
143.
8" GATE VALVES Remove from vessel ten (10) 8" Owner furnished gate valves. Hold in storage, marked for "ESSO WASHINGTON".
144.
PORT BOILER GENERATOR STEAM STOP CHECK VALVE (303) Disconnect, remove to shop, open up, renew guide ring, machine seat and disc, grind in, close up, test to required pressure, prove tight, replace, renew gaskets, defective stud, bolts and nuts. Prove tight. Replace insulation in good order.
MESSRS: .nr>
Rutter
Boykin ^ ^ ^
Howell
^
CL 4- ct
Qj-
Borders ^ ^ Feddeman4"^ ^
(
Bunch ^ w ^
Overman * 7 ^ Dunn 9 / ^
Klink Webb Schmidt Hiemenz
Knight
Challoner
Hassell
Godsey
USCG-1
ABS-1 Copies:
mlh/85
Production Department
inspection Department
Purchasing Department
Gent. Acct.
Chief Timekeeper
Tabulating Dept.
/ c CLc^^l
/oo / Z9 0
) Sb
/l H o t> q a. 0 o
4/0 0 )
-3 b
3r>. / & & , Z 4lP--
Mr. Ireland, Humble Oil & Ref. Co. Ordered By............. .thr.v..Mr.......C.imllaner............
Proceed with work and charge to J. O.......7L1J7..-.S............
L. C. Robertson
Cost"Engineer.......................................
Manager of Ship Repair
EXX-MOR-005883