Document gbQ2b0v6pL1E2YnQz7ENK1BXV

700 WEST CAROLINE STREET. PAULDING. OHIO <5879 * <19/399-3015 BRAKE PRODUCTS April 1, 1976 Glen Butler Area Director Occupational Safety and Health Administration Federal Office Building - Room 734 234 Summit Street Toledo, Ohio 46304 Dear Mr. Butler: REF: OSHA-1, No. 320 This is our second progress report for correction of alleged violations stemming from an inspection made on 2/4/76. Item #1 of Citation #2 was reported corrected on the previous report. The following is a report on newly corrected items and a progress report on the remaining items. COMPLETED ITEMS Citation # 1 ' Item # 2 Corrective Action Taken Electrical rewiring of the motors and equipment at the Bond line was completed on 3/16/76. All work meets all applicable NEC and NFPA Codes. 1 3 Caution signs were affixed to the open tubs of asbestos on 3/10/76. 3 1 Labeling of the large metal tubs con taining asbestos was completed on 3/10/76. MAR 001723 Glen Butler April 1, 1976 Page Two Citation # 1 ITEMS REMAINING TO BE COMPLETED Item # Status 1 An electrical contractor and an electrical supply house are currently evaluating lighting needs throughout the plant. This is to be completed by 4/15/76, after which quotes will be requested so that a purchase order may be written. This item will be completed by 8/16/76. Sincerely, APS:llw cc: R. Hemmelgarn R. Rogers J. SherrR. Treinen A. P. Staszak OSHA and EPA Compliance Director MAR 001724