Document gbJ4j7V5mJBVZ44GVaRGkY3a
j Monsanto
j ....
' i.oc,,o~. j. R. Savage - General Office
December 9, 1970
..... =
MINUTES - 12/4/TO MEETING ON AROCLOR MANUFACTURING SITES
Messrs.
TO
-- W-r0 --
P, Benignus
H.S, Bergen
rW.B, Papageorge
R.M. Kounts
V. R. Richard
if* Ij* Cor*del*
- Antris wOt*
E. K. Potter
Messrs.-------------B.W. Corlew F. J. Holzapfel P. B. Hodges
:
C 0 N F I D E N S3 A .L
We met to decide whether liquid Aroclor manufacture at Anniston should be phased out. The attached decision diagram was used sb a format for the discussion. I have modified it somewhat to reflect the consensus of the group.
The following numbered comments reflect the discussion on the correspondingly numbered blocks on the diagram:
1) Can we make it all at WGX (with modest revision)?
Yes, with 2 additional storage tankB and blow tank area modifications, at a capital-expenditure of $220,000. It was suggested that conversion of transformer 1242 to the topped version of MC3-1016 could reduce capital. This was judged to be technically feasible and desirable. However, subsequent discussions with CED and WGK indicate that the best way to defer part of the above... - capital Is to use 1242 In transformers for'about 2 more years, then convert.
2) Can we afford to drop some business?
While the above Indicates that this would not be necessary. It 1b still relevant because we have an Inquiry from duPont for a million lbs/year of 1268 (or 1272) In an application which they claim to be free of environmental Impact. Since we can only make 1268 in Anniston^ solid Aroclor equipment, and the profit on thiB much 1268 would be substantial, this might justify spending PCB pollution control capital at Anniston. We thus cannot state a final yes or no on this question.
!
1
!
1
i
HARTOLDMONO017863
Are savings substantial?
Ysb, although the exact number is elusive. The most defensible figure seems to be l5QM/year. However, if the difference in total capital (discussed below) 1b smaller than assumed, the figure could be reduced by $15M. On the other hand, the chlorine differential was calculated-on. '71 standards and Earl Potter gave us odds of only"27l0 that we will achieve the freight rate to Anniston assumed in the standards. If the freight rate stays where it is, the savings in mothballing Anniston are increased by $11CM. The likely case 1b in between, bringing us back to probable net savings in the $lpO-$200M range.
Can we get ^capital for Anniston pollution?
Capital for Anniston PCB pollution control haB been
variously estimated, for various purposes between $280M
and $1000K. The savings discussed above use the maximum
WGK capital assumption and the minimum Anniston capital
assumption, for a difference of only $60M additional.
(The "cost of money" used was 10$ in addition to 18$ for
Depreciation, PIE, and Maintenance), This would leave
the question of Montar disposal open, and would not likely
get us to our 10 ppb target in Snow Creek. Bill Richard
pointed out that we should provide adequate facilities
vG uOl.7i1.Ii
shlcrinated terphenyl lo
pressure on the use of 54yd in "Pydrauls. This is perhaps
easier than for FCB!s. We can also make a case that WGK
needs more storage tanks with or without the additional
business. Finally, Howard Bergen opined that provided
that we do our homework well in the other decision areas,
we can get the capital needed to support the decision.
(JRS opinion: the capital difference is $20QM more at
Anniston).
Are service/quality/customer relations risks intolerable?
Based on recent customer- visits, Tom Gossage gave this an unequivocal "no". There was, however, much discussion to the effect that the load muBt not be shifted so quickly that Krummrich stubs its toe. The fact that Anniston could be recommissioned is important.
Are service/quality risks Justified by the savings?
As a corollary to the above, yes, given good WGK perfoirniance.
D3VY 150412
HART OLDMONO017864
Page 5
7) Do legal/PR considerations dictate?
The answer seems to be "not quite". While recent Illinois regulatory activity Indicates some threat t-y>pt*. PC3 control s.t VGrK could become politically "hot". Bill papageorge stated that the Law and Medical Departments and others would welcome a ~ decision to shut down Anniston liquid Aroclor since the legal threats are more imminent and the problems more visible. (There is some uncertainty as to where this block-belongs on the diagram).
Conclusions
While some uncertainties remain, we will begin to move toward total liquid Aroclor production at WQK. Specifically:
1. CED will add 2 storage tanks, etc. to the scope of the MCS-1016 project at WGK.
2. We should determine duPont's intentions on 1268 as soon aa possible.
Js. PCB pollution capital at Anniston should be held to a minimum consistent with the timing of the phase-out and reasonable control of chlorinated terphenyl.
4. As the additional storage at WG-K becomes available, a stepwise shifting of the business should begin. The last shift should be 1221, to give beet cash flow.
md attachment
J. R. Savage SW 150413
HARTOLDMONO017865
I
SHOULD WE MOTHBALL ANNISTON LIQUID AROCLOR?
II I I
DSW 150414
HARTOLDMONOOI7866