Document gb5rGxZvzw2x2mLvybreo3gv9

ABD00313338 4 ABERDEEN CHEMICAL PLANT ROUTINE CHEMICAL DOSIMETRY SUMMARY Month of: Date Of Report: cc: OF, CRM, PEM, PJK, LPS, WFH, CRS, RAF, RAM, AHS Tom Grumbles - Houston 0. R. Drumwright, M.D. - Ponca City March, 1984 April 12, 1984 ALL SAMPLE RESULTS: Chemical VCM Lead Total Particulates < PEL No. % 79 91.9 21 95,5 24 100,0 > PEL (OVEREXPOSURES) No^ % 1 8.1 1 4.5 0 0.0 OVEREXPOSURES Job Class Chief Operator Reactor Operator Reactor Operator General Mechanic Exposure 454* ppm, VCM 3.7** ppm, VCM 3.8** ppm,, VCM 1.3* ppm, VCM Source Employee overexposed while helping control an emergency VCM release at the VCM tank farm. Employee performed routine duties of reactor operator in the new vinyl unit. No specific cause has been identified. Employee performed routine work of reactor operator. No specific cause has been found. Employee overexposed while changing out a Corken com pressor. ABD00313339 Routine Chemical Dosimetry Summary Page 2 -TVo/, A OVEREXPOSURES - Continued Job Class Exposure Source General Mechanic General Mechanic 1.5** ppm, VCM 1.7** ppm, VCM Employee overexposed while tightening a leaking con denser lid on D-600 reactor. Employee overexposed while repairing the dryer line #2 centrifuge while pond resin was being reclaimed on dryer Line I. General Mechanic Line Compounder 14.8** ppm, VCM 87.6* micrograms Lead/m^ Employee overexposed while changing 742 reactor slow vent line. Employee overexposed while charging blenders on Com pound Line I. * Respiratory protection was worn. ** Respiratory protection was not worn. VCM Area Sampling Three VCM area samples were taken on the roof of the V-ll dryer building during roof repair on 3/16/84. The samples were taken using REAL minimonitors. Wind velocity ranged from 0 to 5 miles per hour, direction being from northwest to southeast: Sample Location On safety railing east of 655 blend tank Sample Time (Hrs.-Min.) 7-10 Result ppiji, VCM 0.4 Comments Coarse 53S5 resin in 655 On Safety railing east of and between 653 and 651 blend tanks 7-8 2.1 5305 resin in 651 and 653 On safety railing north of 650 blend tank 7-6 0.7 5505 resin in 650 Area Ventilation Checks The second quarter check of lab and compound ventilation hood velocities and flowrates was completed. No serious deficiencies were discovered.