Document gb5O6xxjvNp1p1O0r8pLOO5DJ

East Chicago, Indiana November 28th, 1944 Mr. Frederick lelst, Tice President International Suiting and Refining Co. Room 1720 - 25 Broadway New York 4, New York SUBJECT: Shite Lead Plant Operations November 19th to 25th. Incl. Bear Sir: The following is a summary of operations at the Shite Lead Plant for the above period: CELL ELECTROLYZING DATA; Average Dally Operations Amperage Total volts D. C. current interruptions, Pit. Hrs Average number cells In operation Lbs, White Lead per D.C.K.W. Hr, 3,740 138.13 47.06 3.5179 DEPARTMENTAL QPgtATIONS: Devs Operated per Week Cell Room: 7 Filter': 7 Dryer; 7 Barrelling; 6 Average Production Tona per Day 21.81 22.38 22.38 25.27 Base white lead sales pries per pound, carload lots In barrels 8-1/4? Yours very truly, MBS:fs Assistant General Superintendent N11493 PMtC0C009Zl9