Document gb3xpgw63qEeEd2VO89Yp4V7J
Monsanto
mo* iUc i.ocATiom e . E. Stewart - WGK
June 3, 1971
acpittiNCt \~
TO
STATUS - PCB POLLUTION CONTROL PROGRAM
Mr. J. R. Savage - G.O.
COMPANY
CONFIDENTIAL
"'Messrs. G. L. Bratsch P. E.Heisler ' C. Buckley/M. Foresman P. B. Hodges - G/o. D. W. Jacksor/^^"" A. Leisy/R. McCutchan W. R. Richard - G.O. W. C. Engman
This is the June 1, 1971 status of the pollution control program.
I. PCB Level in Sewers
Aroclor sewer loss control data are attached. Commentj are
relative to the period V18/71 through 5/27/71-
A. Aroclor Department - A major loss of about 500 gallons occurred during the reworking of wet material that had been returned from a customer. Material boiled out of tank when heating. Rework procedures are being reviewed and enlargement of the department sump are actions being taken to prevent another incident. Exclusive of the major loss, the average daily loss from the department
was l#/day with a range of 0.03 to 1.8 /day.
B. Total Plant - Plant exit losses averaged 21i?/day with a
range of 11 to 6l /?/day. The slug flow less from the
Aroclor department did not appear of the same magnitude
at the plant exit sewer streams. Also the treatment plant
influent stream is about 3-^ times greater than the plant
exit. Samples from other Sauget Village Industries reveal
insignificant amounts of Aroclor.
fe C. Treatment Plant Effluent - Average daily loss of 27 if/day
with range of 8# to 75 #/day.
e
II. Project Status
.
Two Aroclor units in the plant remain to be changed to ncri-PCB
type fluid. Dept. 239 unit scheduled for mechanical tie-in
week of C/15 to permit fluid change. Dept. 2^5 unit to
.
change fluid week of 6/1.
The following are miscellaneous approved projects required to contain losses In the event they occur.
PAUL HODGES DEPOSITION May 31 - June 1, 1994
EXHIBIT NO. 32
CER 011206
WATER PCB-SD0000005652
Mr. J. R. Savage - G.O. Status - PCB Pollution Control Program
Page 2
June 3, 1971
WGK
Estimate No.
2095
"Aroclor Scrap Rework" EDC 7/1/71 To permit proper rework of returned
material to Dept. 246.
2422
"Paving and Curbing" EDC 8/1/71 To contain losses in tank car and
storage area in Dept. 246.
.
24 82
"Contaminant Collection at Rip Track1'
EDC 9/1/71 - To permit recovery of T/C washings and drainings.
2675
"Air Pollution Control" EDC 10/1/71
Nitrogen blanket on mix tanks to
eliminate atmospheric pollution at
Dept. 246.
-
2811
"Pave under Therminol Unit" EDC 8/1/71 Contain material in Dept. 246.
III. Program Status
Very little PCB being found in off-gas system by sampling or trapping. Confirms calculations. No additional equipment required in off-gas system, but present traps should remain an integral part of the system.
/br Att.
.
E. E. Stewart
*
Technical .Services Dept.
-
CONFIDENTIAL 92-CV-204-K
CER 011207 <
WATER PCB-SD0000005653
WATER PCB-SD0000005654
~~7V%Sfe PCB ~/$ J ? # P f? y\
WATER PCB-SD0000005655