Document gawyqbbzgddjmbvGj7y1ypBba

COMPANY CONFIDENTIAL omul locatiohs GENERAL OFFICES P. B. Hodges* K. J. Holzapfel W. B. Papngcorge J. R. Savage ANNISTON J. T. Bell J. L. Brown J. L. Corder V. R. Hcupt G. L. Jessee L. C. Lehman J. C. Landwehr A. G, McCarty G .VI .Mil lcr/T. E. Lackey /J . E. Mund\ B. O. Severson ' PROGRESS FiEPORT TECHNICAL SERVICES DEPARTMENT ANNISTON, ALABAMA PLANT JOBNO. 002-1026 REPORT HO. 2 DATE July 21, 1970 TITLE: OBJECTIVE: AROCLOR LOSSES AT THE ANNISTON PLANT To report all data which is available to data on Aroclor losses in the Anniston Plant. Also, to report all data on Aroclor residues in the Snow Creek - Choccolocco Creek Watershed. To summarize progress to date on Aroclor clean-up efforts at Anniston. PERSONNEL: E. G. Wright, (J. T. Bell) REPORTED BY: E, G. Wright SUMMARY: Aroclor losses from the Annistor Plant for the period April 15 through June 30, 1970, averaged 16 lbs./day. This is a considerable Improvement over the losses of^250 lbs./day for a comparable period during 1969. This reduction has been primarily achieved by an education program and by changing operating habits. However, projects are being Installed and evaluated which will further reduce these losses toward the Business Group goal of 10 ppb. FUTURE WORK: 1. Continue sampling and analyzing for Aroclor looses on a routine basis. 2. Continue to sample and analyze grab samples from Snow and Choccolocco Creeks for Aroclor content. 3. Sample and analyze ambient air for Aroclor content. 4. Sample and analyze tank vents in the Aroclor department to pinpoint atmospheric loss points. 5. Collect additional aquatic samples from Choccolocco Creek Watershed. 6. Issue periodical reports on Anniston Plant losses and progress toward 10 ppb goal. MCNS 056663 E. G. Wright /bs Anniston Plant ' Progress Report #002-1026 (2) Page 2 DISCUSSION I. Aroclor Department Severs A. HC1 Sever Since the installation of a catch tank in the 1IC1 gas line and a coalescer in the acid stream, the Aroclor content in the waste acid stream has been greatly reduced (i.e., Approximately 200 pounds of organic material is being removed by these two projects.)* During the sampling period, this sewer averaged 13.0 ppb of Aroclor. (See Data Sheet I.) Based on this data, the decision was made not to route this stream to the sump presently being installed. This resulted in a substantial savings on installing the sump. However, at times, the spent carbon from the HC1 carbon towers is dumped into this sewer. Alternate methods are being evaluated to eliminate this situation. B. Chlorlnotor and Still Room Sewers At times these sewers had a two phase flow. The quantity of the Aroclor phase could not be determined. However, these two sewers Are being routed through the Aroclor sump. When the sump is completed and put Into operation, the Aroclor phase can then be quantified. The sump will, also, provide a means for recovering this second phese, which under present conditions eventually makes its way out of the plant. When the sump is installed in these sewers, a dally sample will be taken and analysed to determine the efficiency of the sump. Other projects are also scheduled which should result in a reduction of Aroclor In this process stream. C, Warehouse Sewer The major losses from this sewer are due to spills while drumming or flaking. These spills are then swept to the sewer during floor clean up. Presently, clean-up is accomplished by use of Du-Bois steam cleaning which considerably raised the solubility of Aroclor in water. Alternate methods of clean-up end diaposal are presently being evaluated. D. Totsl Plant Effluent During the period April IS to June 30, 1970, the total plant losses averaged 1C lbs./day. This is excluding the period April 21 to June 20, 1970, when the acid neutralization pit was being cleaned out. During this period, the losses ran very high (See Data Sheet V.) due to the fact that the Aroclor which was trapped in the pit was being stirred and entrained into the plant effluent. The discrepancy between the 1.7 lbs./day losses from the severs nr.d the 16 lbs./day losses reported from the plant effluent may possibly be due to two things: 1) Samples from the sewers did not include any of the Aroclor phase and 2) Due to the mixing and the velocity at the plant effluent sampler, eomo of the Aroclor was being entrained and therefore MODS 0 5 6 6 6 4 Ann is r.on Plant Progress Report 002-1026 (2) Page 3 giving higher results. A closer correlation is hoped for when an accurate measure of the Arcelor phase can be accomplished. Close observation of the sump should provide this information. E. Miscellaneous Samples (Data Sheet VII) These samples were collected from Snow and Choccolocco Creeks at various times. They show that Aroclors are present in the Choccolocco Creek even above where the Monsanto effluent enters the creek. They also indicate significant amounts of Aroclor in the mud and water of Choccolocco and Snow Creeks a considerable distance (15-20 miles) downstream from the Anniston Plant. In fact, Aroclor concentrations can probably be found in the Coosa River system. Data Sheet VII contains a complete list of all the data to date on Snow and Choccolocco Creeks. Attached Is a mop of the watershed showing the sample location with respect to the plant. COMPANY CONFIDENTIAL HONS 056665 Sample Location: HC1 Department Sewer Average Flow: 200 GPM - Date 4/15 4/16 4/17 4/20 4/21 4/22 4/23 4/24 4/27 4/28 4/29 5/3 5/4 Aroclor Concentration (PPB) 12 7.8 8.3 18.5 6.2 16.4 10.6 20.4 15.0 13.1 18.7 10.5 11.3 Aroclor Losses OF/day) 0.030 0.019 0.020 0.044 0.015 0.039 0.025 0.050 0.036 . 0.031 0.045 0.025 0.027 Average: 13.0. 0.031 .ozy.TIAL con: HONS 056666 DATA SHEET IT Sample Location: Warehouse Sewer Average Plow: 65 GFM (Estimated) Date 4/22 4/23 4/24 4/27 4/28 4/29 5/3 5/4 Aroclor Concentration (PPB) 2,800 2,860 1,250 1,520 1,300 2,130 1,320 1,480 Aroclor Losses (#/day) 2.18 2.23 0.98 1.18 1.02 1.66 1.03 1.15 Average: 1,833 1.43 COMPANY CONFIDENTIAL HONS 056667 DATA SHEET XII Sample Location: Aroclor Still Room Sewer Average Flow: 150 GPM (Estimated) Aroclor Concentration Date(PPB)(#/day) 4/22 12,500* 4/23 . 13.8 4/24 30.0 4/27 17.0 4/28 12.2 4/29 4.8 5/4 20.0 5/6 11.0 5/8 23.4 Aroclor Losses 0.025 0.054 0.036 0.022 0.009 0.036 0.020 0.042 Average: 16.5 0.031 Contaminated sample * not included in average. COMPANY CONFIDENTIAL HONS 056668 I DATA SHEET IV Sample Location: Aroclor Chlorinator Sewer Average Tlow: 2/5 GPM (Estimated) Dace 6/22 4/23 4/24 4/27 4/28 4/29 5/3 5/4 5/6 Aroclor Concentration (PPB) 80.0 46.5 35.0 51.0 56.5 70.0 81.6 73.0 85.3 Aroclor Losses (tf/day) 0.264 0.153 0.115 0.168 0.186 0.233 0.262 0.241 0.281 Average: , 64.3 0.212 COMPANY CONFIDtNTIAL HONS 056669 DATA SHCKT V Sample Location: Total riant Effluent Average Flow: 900 GPM Date 4/15 4/16 4/17 4/21 4/22 4/23 4/27 5/4 5/5 5/6 5/7 5/10 5/12 5/20 5/25 6/2 6/3 6/5 6/6 6/7 6/8 6/9 6/10 6/11 6/12 6/13 6/14 6/15 6/16 6/17 6/18 6/19 6/20 6/21 6/22 6/23 6/24 6/25 6/26 6/27 6/28 6/29 6/30 Average: Aroclor Concentration (PPB) 98 150 3.300 10,80<P 16,000 875 13,750 18,000 3,300- >* 9,750 9,900 3,300 1,327 2.650J 68 216 880 148 360 950 315 3,100 ' 400 760 1,540 1,875 85 820 520 1,820 490 3,500 3,825 800 720 1.920 1,620 1,460 2,940 680 3,966 3,200 ' 4,?on . 1,460 Arcelor Losses (#/dav) 1.08 1.65 36.30 119.00~\ 176.00 9.62 151.00 198.00 36.30 V 107.00 109.00 36.30 14.60 29.20y 0.75 2.38 9.70 1.63 3.96 10.45 3.46 34.10 4.40 8.35 . 16.90 20.60 0.94 9.00 5.72 20.00 5.40 38.50 42.00 8.80 7.92 21.10 17.80 16.10 32.40 7.47 43.60 35.20 46.20 15.74 m0NS 056670 DATA SHEET VI Sample Location: Snow Creek Sampling Station He tu 4/15 4/16 4/17 4/18 4/19 4/20 4/21 4/22 4/23 4/24 4/25 4/26 4/27 4/28 4/29 5/1 5/2 5/7 5/8 5/9 5/10 5/11 5/12 5/13 5/14 5/18 5/19 5/20 5/21 5/22 5/23 5/24 5/29 5/30 5/31 6/1 6/2 6/3 6/4 6/5 6/6 6/7 6/8 6/9 Aroclor Concentration (PH,) 1,800.0 233.0 124.0 . 499.0 - 5,435.0 1,950.0 1,220.0 \ 2,550.0 3,200.0 3,750.0 3,800.0 2,166.0 1,860.0 860.0 2,800.0 2,800.0 1,450.0 1,320.0 1,760.0' 1,840.0 9,600.0 1,740.0 3.8 1,566.0 1,325.0 x 1,920.0 2,400.0 1,320.0^/ 3,000.0 1,500.0 - 800.0 ^ 1,540.0 12.5 5.0 14.8 25.0 16.4 35.0 14.0 1,320.0 ' 140.0 240.0 104.0 430.0 HONS 056671 ) DATA SHEW VX - continued. Dnte 6/12 6/13 6/14 6/15 6/16 6/17 6/19 6/20 6/21 ArocLor Concentration . . (PPB) 030.0 . 760.0 254.0 1,470.0 41.5 110.0 216.0 ' 272.0 ' 480.0 ^ Average: 768.0 *L line a tone pit being cleaned cut - Data not included in average. COMPANY CONriDtNTIAL HOMS 056672 DATA SHEET VXX Sample Jtei-- Pate 1 10-8-69 Sonrnle Location Snow Creek at Glenaddle Aroclor Concentration (PPB) Mud Water 2.36 x 107 23.3 2 10-8-69 3 10-8-69 4 10-8-69 5 10-8-69 . 6 11-23-69 7 11-23-69 8 11-23-69 9 11-23.-69 10 11-23-69 11 11-23-69 Choccolocco Creek at Bolling Springs (upstream from Monsanto's effluent) Choccolocco Creek at City Treatment Plant (1 block below confluence of Snow and . Choccolocco Creeks) Choccolocco Creek at Jackson Shoals (20 miles downstream) Choccolocco Creek at Eureka Bridge (25 tnllea downstream, mouth of Choccolocco into Coosa River) Snow Creek - 1 block below plant Snow Creek at Glenaddle 78 738,000 7,300 3,240 2.19 x 106 1.84 x 10 Choccolocco Creek at Highway 9 (=15 miles upstream from the confluence of Snow end Choccolocco Creeks) . Choccolocco Creek at Bolling Springs (upetraam from Monsanto's effluent) Choccolocco Creek at City Treatment Plant (1 block below confluence of Snow and Choceolocco Creeks) Choccolocco Creek at Jackson Shoals (s?20 miles downstream) 1,536 26 470 8.1 < 2.0 5.8 < 2.0 20,300 1,435 11 10 58 10 COMPANY confidential HONS 056673