Document gapD37Yb74LjE08da2O6LNezJ

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION VI DALLAS, TEXAS 75270 CfJjUJL 9 Mr. W. R. Harris Vice President and General Manager PPG Industries One Gateway Center Pittsburgh, Pennsylvania 15222 Hear Mr. Harris: Your f etter dated December.720 , -l 976, ^Md^Ir'^Wyche.'.s r.l etter,to,f^ApiQVlvi5^ ly77,'requesting a waiver of conipliance-from certainirequlrenierits^pf^the national hazardous emission standard for-,vinyl chloride (40`CFRjPart^l'*-, Subpart F) for your LDC and VCi-i plants located in Lake Charles / Louisiana^ have been received and reviewed. 7 A waiver of compliance from 40 CFR Part 61, Subpart F, is herebyEsrantecf; for your EDC and VCM plants located in Lake Charles,-subject to-tjie^ specifications and conditions delineated In the enclosure to thisf letter. All requirements of 40 CFR Part 61, including Subpart F, must be complied with In all respects during the period of October 21, 1976 to the termination date of the waiver unless specifically discussed In the enclosure to this letter. The Enforcement Division Director, Region VI, environmental Protection Agency, 1201 Elm Street, Dallas, Texas 75270, must be notified no later than 10 days after each Increment of progress has been achieved. Prior to the termination date of the waiver, you are required to test emissions, using an approved test method, from the sources listed in the enclosure to demonstrate compliance with the vinyl chloride standard. This office must be notified at least 30 days prior to such emission test so that v/e may have an opportunity to observe the test. The emission test shall be conducted and reported as required by 40 CFR Part 61. For the remaining subject sources and vents which require testing, that are not delineated in the enclosure, i.e., those sources.and vents which you consider to be in compliance with the standard, you are also required to conduct appropriate emission tests. The schedule for conducting these tests will be arranged through our Surveillance and Analysis Division. For this purpose, please notify Hr, Philip Schwlndt of thes Surveillance and Analysis Division within 10 days of the receipt of this letter so that a test date and pre-conference. If necessary, can be arranged. Mr. Schwlndt may be contacted by telephone at (214) 749-7126. jLn CflX-2. U*,J 7>V\ I SL 105266 Please'be advised that, unless stated otherwise In the enclosed waiver, you are required to report, on a semiannual basis, all the Information contained in Section 61.70, Semiannual report. Your first report will be due on September IS, 1977. Any deviation from the conditions of this waiver, unless previously approved by the Director of the enforcement Division, shall be grounds for the immediate termination of this waiver. In addition, a situation of Inriilnent endangerment may warrant the Immediate Intervention of the Environmental Protection Agency. Other requests you may have submitted, such as equipment and test method equivalencies, will be addressed under separate cover. Additionally, we intend to discuss and evaluate your leak detection program during an on site Inspection, to be scheduled in the near future. Should you have any questions concerning the substance of this waiver, you may contact Mr. Gary A. Bernath of my staff by letter to this office or by telephone at (214) 749-7675. Sincerely, ORIGINAL SIGNED BY O. W. LIVELY, JR, FOR Howard G. Bergman Director, Enforcement Division Enclosure cc; Louisiana Air Control Commission P. 0. Box 60630 Hew Orleans, Louisiana 70160 James E. Wyche 111 Coordinator Environmental Systems PPG Industries P. 0. Box 1000 Lake Charles, Louisiana 70601l S SL, l52e? Applicable Regulation 7 2. 1 *' 161.62(a), 61.65(b)(9) n/^. n 161.63(a), 61.65(b)(3)(i) and (iv), 61.65(b)(5), ? (6), (7), and (9) Waiver of Compliance PPG Industries Lake Charles, Louisiana EDC and VCM Plants Emission Point EOc Plant VCM Plant Description As described in PPG's waiver request, dated December 20, 1976 As described in PPG's waiver request, dated December 20, 1976, and PPG's letter of April 15, 1977 Compliance Schedule Number 1: 1. Date by which equipment will initially be ordered 2. Date of commencement of on site construction 3. Date of completion of on site construction 4. Date of final compliance and date on which this waiver terminates July 1, 1977 December 30, 1977 October 1 , 1978 October 21, 1978 Sli X05268 Applicable Requlation 61.65(b)(1) 161.65(b)(2) l61.65(b)(3){i) 61.65(b)(5) 161.65(b)(6) 161.65(b)(7) 2- - Emission Point VCM Plant VCM Plant VCM Plant VCM Plant VCM Plant VCM Plant Description Loading and unloading lines All slip guages on VCM tank cars Rotating pumps (as identified in PPG1 s waiver request dated December 20, 1976) Manual venting of equipment prior to opening, as identified in PPG's letter of April 15, 1977 Opening of equipment, as identified in PPG's letter of April 15, 1977 Sample taking and disposal Compliance Schedule Number 2: 1. Date by which equipment will initially be ordered 2. Date of commencement of on site construction 3. Date of completion of on site construction 4. Date of final compliance and date on which this waiver terminates SL 105269 September 1, 1977 January 2, 1978 July 28, 1978 October 21, 1978 Applicable Regulation 61.65(b)(3)(i) tel.65(b)(3) Civ) -3- Emission Point VCM Plant VCM Plant Description _____________________ __ As identified in PPG's waiver request, dated December 20, 1976 Reciprocating VCM vent compressor Compliance Schedule Number 3: 1. Date by which equipment will initially be ordered 2. Date of commencement of on site construction 3. Date of completion of on site construction 4. Date of final compliance and date on which this waiver terminates September 1, 1977 November 1, 1377 March 31, 1978 October 21, 1978 Sb 105^ m -4- Applicable RegulationEmission Point 61.65(b)(9) EDC Plant 61.65(b)(9) VCM Plant s _____________ Description Bicarb surge drum drain Heutralizer flash pot drain Compliance Schedule Number 4: 1. Date by which equipment will initially be ordered 2. Date of commencement of on site construction 3. Date of completion of on site construction 4. Date of final compliance and date on which this waiver terminates September 1, 1977 February 6, 1978 July 29, 1978 October 21, 1978 SL 105271