Re:
Hawaiian Electric Co., Inc. Waiau Station Unit No. 3 Contract No. 15265
March 1, 1993
M. J. Hornik
CVCSC Windsor 611-RB2
o w
As requested during our phone conversations and your letter dated February 18, 1993, I am presenting below boiler/insulation report on Hawaiian Electric - Waiau #8, Contract No. 15265:
Contract No. 15265 Hawaiian Electric Co.. Inc.. Waiau Station Unit No. 8. Honolulu. Hawaii
Purchaser:
American Factors Ltd. (AMFAC) Inc. Honolulu, Hawaii
CE furnished (1) Type "RRP" Radiant Reheat Pressurized Steam Generating Unit having a capacity of 575,000 lbs./steam per hour maximum continuous - no peak. Furnace width 19'-11" and furnace depth 28'-8". Unit is an exact duplicate of Unit No. 7 supplied under Contract No. 5863.
Purchaser supplied necessary field labor to install the CE supplied boiler and auxiliaries and CE supplied setting materials. ^ Purchaser supplied and installed insulation materials and CE supplied setting materials.
During the life of the contract Hawaii became the 50th state.
During the life of the job "American Factors Ltd." name was changed
to "AMFAC Inc.".
Export Sales Agreement 1/15/59 CE/American
Factors Ltd. CE/AMFAC Sales Representative Agreement 7/1/67 under
which AMFAC is paid a commission based on contracts sold involving
EXHIBIT C
DOOOl
'G. Kittle
2 March 1, 1993
AMFAC purchase order for the boiler includes CE Proposal No. 15763A 4/3/63 as part of their purchase order. Proposal under Settings includes refractories and no insulation material by CE and under Insulation not- by CE - Purchaser supplies on a' delivered and erected basis.
Estimate includes under Setting refractory materials only and no insulation material by CE.
Manufacturers Data Report indicates Boiler Serial and National
Board No. 20694 and year built 1967-68 with Certification of Field
Assembly Inspection - Post Hydro by Royal Indemnity Co. of New
York, New York on 10/9/68.
Certification that erection was
performed in accordance with requirements of ASME Code by
Customer's Erection Subcontractor BWK Joint Venture 8/20/68. CE
Erector E. King Curry. Unit went into commercial operation in
November 1968.
Attached are the following CE purchase orders issued on suppliers involving Settings part of CE supply:
P.0. No. 1702177 5/8/67 issued to Refractory & Insulation Corp.
ordering refractory setting materials including 150 lbs. super
stic-tite plastic insulation, 40 lbs. Mix "A" packing material.
Balance of materials super 3000, moldit, pourable insulation are
non-asbestos.
Engineering Requisition No. 314-SET (in file)
covers.
P.0. No. 1702460 5/23/67 issued to Refractory & Insulation Corp.
ordering mastic materials including 100 lin. ft. JM #4200 asbestos
rope or equal.
Engineering Requisition No. 317-SET (in file)
covers.
P.0. No. 1702178 5/8/67 issued to Refractory & Insulation Corp. ordering asbestos packing consisting of 60 lin. ft. asbestos tubing for drum seal at roof enclosure. Material to be equal to H. K. Porter Co., Thermoid Division. Engineering Requisition No. 311-SET (in file) covers.
P.0. No. 1702179 5/8/67 issued to Refractory & Insulation Corp. ordering weatherproofing for walls and doors consisting of 5,400 gallons of Insulkote "ET" as manufactured by Johns Manville Corp. Engineering Requisition No. 312-SET (in file) covers.
Attached CE engineering refractory specifications pages 1 thru 8 inclusive and CE engineering insulation specifications for furnace walls, ducts, related equipment and piping pages 1 thru 26 inclusive. Note page 2 stating Purchaser supplies and installs insulation materials as covered by specifications.
D00002
G. Kittle
3 March l, 1993
This concludes our report on Contract No. 15265/Hawaiian Electric, Waiau #8.
As advised during our phone conversation, copies of CE/AMFAC Sales Agreement should be obtained from CE Legal Dept.
MJH:smt 930066