Stan,
Louie and I went over the first projected project for Asbestos removed equipment needs.
A P ^ | Sujffi V S Vi 0 LU* ri
Louie is going to be rerouting the #7 air injector line. This project will need some asbestos removed. In that same area, the exhaust pipe to the #7 turbo condensate pump is continually being worked on and also needs to have the Asbestos removed.
This is the list of asbestos that I would like to see taken care of in the month of March.
1. Remove 4'x4` yellow air cell asbestos on the east elbow of the #7 air injector / steam line.
2. Remove approximately 5 foot of the yellow air cell asbestos insulation on the exhaust of #7 turbo
condensate pump.
3. Remove the old water PIPE (approximately 80 feet) line which is no longer in use. This pipe can be
wrapped in plastic and cut down with the asbestos in place. This pipe parallels the #1 turbo condensate
pipe in the basement.
4. Remove approximately 200 feet 1501b steam line in the east bay on the main floor of the Power house.
This pipe is no longer in use and contains friable asbestos which in my opinion, because it is no longer in
use, may as well be removed instead of patching up and still having to maintain it. It too can be wrapped
in plastic and cut out in sections with the asbestos intact. Because of it's size, this will be a little more
difficult. Your cost will be in disposal.
GAft
V
Let me know the status of this project so I can put in a work order. rumoOeA or-iccT7
TBtr
OlA
~y y s
V.Ay, -- ncA \r\
.__________ ___________________ _
PVIT*
L2^2.1
n<
I'-ng. \s rtrouAci.
\ -Vo puA c< "V V\c_re_
Tro-p cViciv
Vo rejrouJxe_ Wv-.g.
| xlr\GLU_TT
oi 4$ 7 T'-A'doo
)r\&ejr>>Se*i
loo cr70 37<?7
Page 1
ASARCO ELP OOI1296
jjd/ uj&y
-f-
SKips
ASARCO ELP 0011297
Munsell, Peggy
From: To: Cc:
Subject: Date:
Munsell, Peggy Parnell, Stan Borunda, L A; Castor, Larry
Power House Asbestos Removal Wednesday, February 26, 1997 2:59PM
Stan,
Louie and I went over the first projected project for Asbestos removal based on employee exposure and equipment needs.
Louie is going to be rerouting the #7 air injector line. This project will need some asbestos removed. In that same area, the exhaust pipe to the #7 turbo condensate pump is continually being worked on and also needs to have the Asbestos removed.
This is the list of asbestos that I would like to see taken care of in the month of March. 1. Remove 4'x4' yellow air cell asbestos on the east elbow of the itl air injector / steam line. 2. Remove approximately 5 foot of the yellow air cell asbestos insulation on the exhaust of #7 turbo condensate pump. 3. Remove the old water PIPE (approximately 80 feet) line which is no longer in use. This pipe can be wrapped in plastic and cut down with the asbestos in place. This pipe parallels the #7 turbo condensate pipe in the basement. 4. Remove approximately 200 feet 1501b steam line in the east bay on the main floor of the Power house. This pipe is no longer in use and contains friable asbestos which in my opinion, because it is no longer in use, may as well be removed instead of patching up and still having to maintain it. It too can be wrapped in plastic and cut out in sections with the asbestos intact. Because of it's size, this will be a little more