Document gaN6V62wDvw34ZLZq0EpdZo1N
REPORT
TECHNICAL SERVICES OEPT. - W, . KRUMMRICH PLANT
I job mo.
'
| q 1 7 ill *1|11C
REPORT NO. '
OATS
, . *>
9 /221 69
w.e. krummricn plant
*fB E.Billen IS E. Malone *BJ A . E. Leisy
0T. *. DALTON
IS M.Ooldasich B 3-. Shafer IS. R.McCutchan 5 J. Davis
GDj, W. Kolloy 0 E.Mares
SO, L. Bratsch 6 Q.Hudson QD. J. O'Toole 0 F.Elliott
Bl}. V. Jaokson ^ R.Hamlet
*0 L. Sprandel S B.R.Williams
B D.Sartor gg R.Spiller
research
Q C-.O.
OCMCRALOPPICC
* J. E, Smith
Q J. 0. Bright 00. BANNA
W.R. Richard
D. E. Cayard
C, E. AHAONOBTOPOULOf *0P. 8. gSOARBS
` 'IB P.B.Hodges
R. E. Howard
' TS W.A.Kuhn
*. A. HIININMN
g] B. e. HOMES
Hr C. Carder
*0 N. L. SAMPLE
OTHERS (
J. R"* Savage
eltie * t. fi. KKLL044
*S j ,c. Landwehr ^ So. 2nd St. * P. 0. DeGarmo *0 T.M. Patrick * J.F. Quinn (3 E.S.Tucker-
0 JFQ
E) R, Stratmeyer
TO RECEIVE DETAIL SECTION
TITLE!
WATER POLLUTION: AROCLOR CONTROL
TEaEONNCLl
IM. Pierle (C. P. Bucwley)
To determine source and quantity of Aroclor losses to the sewer.
Aroclor losses are confined to Departments 238, 217, 218, 243, 245, 246, 258. 270, 273, and 275. Department 245 is now hauling 3o00-4800 gallons/year of spent aroclor to the Monsanto landfill. The remaining major source of aroclor in the sewer is Department 246. From yield losses it is estimated that these losses total 40,000 #/yr. to the sewer. A project with estimated cost of $10,000 is presently being developed to minimize the Department 246 losses.
Water and mud samples are being taken to determine both the actual plant losses and the effect of W.G.K.'s outfall on the aroclor levels in the Mississippi River.
M. A. Pierle Technical Services Dept.
Jo
COMPANY CONFIDENTIAL
TRAN 023780
COMPANY CONFIDENTIAL INFORMATION
flUs deoBaant Is the feepetty of Noa**rto Cempmf sad the r*elpte is repeatsfete far Its eaieteeplag asd dUpoaklee. & emi alms coafldoe* a! iafematiofi of Moosmto Cotapisay whkk st set fes repwdwsed, reweted to aaeutborteed persona or soot outside tfes etmpmy wUheoS
proper entherUatioa. Either rotate la eeerae Alee er destroy.
HARTOLDMONOOQ7563
913^1:^119(1)
-2- September 22, 1969
BACKGROUND:
The outbreak of adverse publicity toward the use of chlorinated hydrocarbon insecticides has caused the W.Q.K. plant to study the losses of polychlorinated biphenyl (aroclor) from the plant. Recent studies have indicated that PCB materials act similar to the insecti cides in that they are resistant to biological breakdown in the environment, and therefore, they tend to concentrate in animals such as birds or fish.
The object of this report is to summarize preliminary information on the sources and quantities of aroclor material in the W.G.K. plant effluent.
DETAILS:
A. Sources
1. Each manufacturing department was surveyed to determine whether or not aroclor could be present in its effluent. The use of aroclor is confined to Departments 238, 2*3> 2^5, 258, 270, 273, and 275.
2. Aroclor has also been detected in the catch pot systems in Department 218 and 217. This is contained in the HC1 off-gas from Department 2*16.
3. The manufacturing department, 2 *16, has aroclor in its effluent. This is readily visible in the department's
trench sewers.
B. Quantity
1. Although aroclor is used in the above stated departments, only two departments (2**5, 238) have to completely change out their system on a routine basis.
Department 2*15 uses 600 gallons every 1 1/2 - 2 months, and Department 238 uses about 2,000 gallons/year. Other department losses are from vapor losses due to tank breathing and leaks from pump parking.
2. The amount of aroclor in the HC1 off-gas system is believed to be minor since it is infrequently found in the 217 and 218 catch pots.
3. Based on yield losses. Department 2**6 losses are estimated at tJOjOOOii'/yr.
COMPANY
CONf:uENTiAL
1
TRAN 023781
HARTOLDMONOOQ7564
913^1:^119(1)
-3- September 22, 1969
B. Quantity (continued)
. General
The following sampling program has been developed to quantify the losses from the W.G.K. plant and to de
termine the effects in the Mississippi River.
Liquid Samples
1. Plant outfall - one weekly composite sample. 2. One weekly composite sample representing effluent
from Department 2^6.
Mud Samples
1. Sample from primary treatment plant sludge. 2. 0.5 miles upstream of outfall. 3. 200 feet below outfall. Jl. 1.0 miles below outfall.
All of above are taken once per month.
To date, due to work priority, analytical results are not available. Samples will continue to be collected.
C. Control Measures
1. Dept. 2^5 - The aroclor which previously had been sewered is now being hauled to the Monsanto landfill. This amounts to a plant reduction of 3600 to ^800 gallons per year.
2. Dept. 238 - This material has and will continue to be dis
posed of at the landfill.
-
3. A project is presently being developed for Dept. 2^6 as part of a general paving project which should minimize aroclor losses. It involves the construction of settling chambers in trench sewers which will act as collection basins for the aroclor. The material will be removed by either a steam jet pump or a sump pump if it is needed. The estimated cost for aroclor loss control is $10,000.
COMPANY
CONFIDE. ,, 7,AL
`
TRAN 023782
HARTOLDMONOOQ7565
91341:4119(1)
-4- September 22, 1969
CONCLUSIONS:
1. The major sources of aroclor in the plant effluent
la Department 246,
.
2. Laboratory results are not yet available to actually quantify total plant or Department 246 losses.
3. A project to minimize Department 246 losses is being developed. Estimated cost is $10,000,
FUTURE WORK: 1. Continue supplying samples to the laboratory. 2. Improve monitoring system in Department 246, 3. Report on analytical results when obtained.
COMPAQ
CONFiDEN HAL
k TRAN 023783
HARTOLDMONOOQ7566
APPENDIX
COMPANY CONFIDENTIAL
i TRAN 02378%
HARTOLDMONOOQ7567
OR Log No.
RESULTS WGK WATER SAMPLES
- Sample Identification
Date Taken
Amount Found (Reported
As ppm Aroclor 1242
Except Where
.
Noted)
'
14 WGK 15 WGK 16 WGK . 17 WGK 18 WGK . 19 WGK ' .19 WGK 20 WGK 21 WGK 95 WGK
96 WGK
37 WGK
98 WGK '
99 WGK
100 WGK
101 WGK
102 WGK
'_
24N, #1, Sewer
7/69
' 0.05
. or
24N, #2, Sewer
7/69
1.40
/ VO
SVO, #1 Sewer
7/69
lO:r8> .
SVO,#2. Sewer
7/69
c&rS'P '67
24N, #1
7/18/69 .
. 1.87
/. 8 7
MVO, #1
7/18/69
MVO, n , on Layer 24N #2
7/18/69 7/15/69
0.17% 1.71
f-~? 1
MVO, n
7/15/69
MVO. 24N 24N SVO 24 N MVO 24N
..
.
10/2/69 -10/7/69
9/25/69 -9/30/69
10/2/69 -10/7/69
9/25/69 -9/30/69
7/28/69 -8/3/69
7/28/69 -8/3/69
. 7/21/69
/ *$ 6<U 0.20 c.L\. 0.45
li*. 0.04 ^Bsj? V/-/6 0.03
(.z. o L7( 0
.a ?
.03
MVO
.
... ...
.
7/21/69 * TVU.I
CVS?*'3* 73.3 : . It. LI
9. a v
A -> 4
z^ u.
i., f
. . .. ...
. ..
.'
SVoA V ^
COMPANY confidential
.
tran
' t *
023785
HARTOLDMONOOQ7568