B2SH P. G. Benignus December 1, 1971 Leaky Askarel Drums .
B2NK E. M. POTTER
B2SA B2SA B2NK
B2SL B2SH 1740 1650 I65O
John Mason H. S. Bergen W. B. Papageorge T. L. Gossage C. Paton Art Leisy P. L. Slayton J. G. Bryant
WGK called today that two drums of Inerteen from a shipment to Boston Edison arrived empty.
Some time ago we met to point out that we have a faulty drum problem.
While we warn the user to spill none, we ship out some drums that spill their entire content.
Evidently the drum problem is not solved.
If this is not solved promptly with assurance we will have to stop drum shipment of PCB.
The sole reason the plant called was to get my views about forcing the customer to file claim for the lost material shipped on an FOB basis. On this basis by law the customer is respon sible. This is ever more reason why Monsanto must either cor rect this drum problem or stop use of these containers.
Please advise all recipients of this memo as to where we stand.
Thank you.
P. 0. Benignus cs