August 17, 1982
SAC Minutes - 8/10/82
! VInCI
J. A. Glass D. E. Kaldenberg S. G. Pappas
PMSB
PLAINTIFF'S EXHIBIT
1. Quarterly Inspection Program
Reviewed SHAC's proposal for a competitive quarterly inspection scheme. See attached for recommended changes.
2. PMSB Minutes
SAC was asked to consider the publication of ABRIDGED PMSB minutes to plantwide distribution. It is our opinion this wider distribution will serve to improve communeiations on plant safety policy and high light the management concern for safety. It is proposed that LP&S will prepare summary minutes to be issued through the safety organization (Hourly Safety Committee and Unit/Craft Contact Supervisors) for review at the meetings of the safety organizations, and further distribution or discussion with hourly groups through this network.
These minutes should be approved by the Superintendent of Personnel before issue.
3. Old Business
The following items of unfinished business were briefly discussed. Detailed status will be reported in September.
a) Flame Retardant Tarps (JAG) b) Guide to Accident Prevention (JAG) -c) Communication Procedures for HCN & Emergency Alarms (JAG)
d) Breaking into Process Equipment Procedure (CFN)
e) Passengers on Drott Crane (JAG) f) AN Walkway (CFN) g) Revision to P-0117 (Permits) (JAG)
C
/ob Enclosure
0
C. F. Navarrete
LAM003245
SC 002040
QUARTERLY INSPECTIONS
OBJECTIVES
SHAC
Promote competition Recognize achievement/needs Improve quality of inspection and feedback
ADDED BY PMSB & SAC
Simple and credible ranking criteria Consistency
Inspection ratings Application of Safety Procedures/Programs . Promote continuing improvement V Visibility of management concern
CFN/ob 8-17-82
SC 002041
LAM003246
QUARTERLY INSPECTION
RECOMMENDATION
Adopt SHAC's recommended scheme with these exceptions:
1. Rating Criteria
A. Simplify Rating
- Non-Numerical Best/Good/Unsatisfactory/Skunk (later)
- Inspection team to assign rating
B, Basis for Rating
Three Parts
Pre-Judged
Two Groups
Improving Not Improving
1.
Inspection
2.
Inspection
3.
_ -^
Safety Performance of Unit Pre-ranked as proposed BUI SHAC to review
at PMSB prior to inspection.
Basgs*^^ x-uct&ents - Recordable record (as proposed) - Total Injury TREND for each unit
(rather than absolutefrequency) Housekeeping Level of Unit As proposed - non-numerical value judgment. Unit Safety Improvement Program Two components: Use of plantwide programs (STOP., Safety
Mtgs., U/C SPT, etc.)
Unit programs
2. Inspection
Adopt as proposed except for manufacturing units.
Change to:
# Two teams vs. three (everyone has a chance to be a hero or a skunk.)
Plan 6-hour tour for each team. # More involvement of unit supervisor Rotate all of PMSB through these two mfg. unit teams as well
as all the others.
LA/WQ03247
CFN/ob 8-17-82