Document ga2K7m3qyLJ4avMp5w8VL0k7J

Monsanto ...................... ...... . TO : Bin Corlew. Krummrlch__________ August 6, 1970 Control of PCB's - Thermlnol, Hydraulic Fluids. Etc. T. Raanuss/ J. SafylgeJ M. Saadane- Buckley Messrs. E. B. Blllen B. B. Byrne T. W. Dalton C. H. Deubner J. E. Hastings ?. C. Hume D. W. Jackson E. H. Kimball A. E. Delay D. C. Otto B. R. Williams Confirming my comments In staff meeting this morning: Given the Intensive effort underway to control PCB effluent from the producing unit and to control end uses of the produot by forgoing plasticizer application business - It seems consistent and reasonable that we take steps to control the scrap fluids that heretofore have been put In the land fill. To this end the following things are already underway or are requested: (1) A used tank trailer Is being placed In service for use In collecting thermlnol (or other) fluids that are to be changed out from ln-plant applications. Parallel to this, tankage Is being set aside for collection of these bulk fluids for subsequent Incineration. ' Returned drummed material from customers Is being collected on the south lot to be held until the Incineration unit Is on line. In some ln-plant applications It may be easier to drum-and-store than to use the tank truck. (2) The only PCB materials that should go to the landrili, even In drums, are (a) material that Is In solid form at ambient temperature (Montar - until Incineration Is on-line, at which time Montar will be diluted and burned) (b) rags, contaminated chat, emptied sample bottles, etc. HONS 096^34 Plant Manager's Staff Control of PCB's - Thermlnol, Hydraulic Fluids, Etc. WOK Unresolved situations at present Include the followings (1) Best method of disposing of Aroclor tank car washings (presently collected In a tank truck and drained at landfill -- Incineration project calls for a settling sump for resolving this one). (8) How to handle lab-samples, i.e., emptying contents of control and reserve sanple bottles. At this point, the best contact man for disposal difficulties is Tony Rasmussen who Is the plant liaison man for the Incinera tion project. Overall goal of zero PCB losses to the sewers remains. /gjs Bill Corlew MONS 098235