"J. P. BUFE - GENERAL OFFICES (4-6491) NOVEMBER 15, 1968 UTILITIES REQUIREMENTS CEA 2080 - SOLID AROCLOR EXPANSION - ANNISTON MR. R. S. YATES ^ cc R. M. KOUNTZ G. McILJWJVVArtIXNlNECj --- A/1JN.NLNN XISDTIVOINN jTf, NEFF R, L. SANDSTEDT W. F. TAFFEE - ANNISTON . This confirms our discussion on the supply of utilities for the reference expansion. Electrical 13 motors with an installed capacity of 130 hp. The primary transformer and the Aroclor transformer have adequate capacity to supply the increased load. The cable to the motor control station and the motor control area should be checked for cap acity and space. Tower Water One heat exchanger with a load of 200 gpm. The existing Aroclor and PNP cooling tower has adequate capacity to supply the increased load of 200 gpm. City Water . The existing system has adequate capacity for the 50 gpm increase. Steam - 901b Generation and steam distribution system have adequate capacity for the 600 lb/hr increase. /dh Attachment *35908 TOWOLDMONOQ48264