Document gYbNLnvy56zegbyXq1yKqL19
OPERATING BULLETINS HISTORY SHEET
Ofctt _ aucCTi __
2r7=k2------------- \
_____Perf-A--Tape Joint System
cv Bnuxrri, ^ REVISION ________ CANCELS
tEQUESTED st:
J. 7. Gill, Besearch Department
SUUETIN M. 61-7-22JU
. /For." A* Berios Floats
Because of esrrat short supply of asbestos floats, plants to sake tha fallowing substitutians^in the manuftcture of Perf-A--Tape joint ceaent:
m ph
<nw eeasnt:
S% AUD (1:2) pica $ to 7% asbestos floats as required
netrfi the supply of asbestos floats is exhausted,
Then use 10? A20.
. `.
_.
1ok alkaline cement:
use present fonzola until supply of asbestos floats
is exhausted, then use 13? AMD.
Proposed sub3titiutioa will permit continued production of joint cement. Cement texture will be slightly grainier-
more noticeable In the low alkinity formula than in the high.
t Qualify will not be otherwise impaired.
\i -
Effect an costs will wary depending on the plant. At Gypsun,
the current cost of asbestos floats is $19.01 per U lbs. and
AMD $15.76.
-
PUi.SE SICK 6ULUTI* hEE
3eot. 1
name
.25.1
H. H. Huntsicker
Initials . Date Sinned
rHk vo," -Zj-lM
170-P ' M, G. Allison
lid ~.~. fSb
~?xr~ 1ir
170--7 C. W. Desgrey
JYin r---------
170-C K. R. Eckrota
TLlMjL
170-1 J. R. Newberry
170-E P. E. Roberts
.
_1SS__ ~170-J
J. P. Sanger J. IT. Timons J. 7. Butler
` C7~/
-4&/K-
K-3092 Rev. 6/1*7 (U.S.A.)
ClffCUllITD ami ^*7
Operation* .'tiff Manager
Ditte
3 -7- 4-9
HilLEO :
3 "Sf "U ^ '
onz:
SHEET 1-
DP007 1029