Document gEvJeGvrrN04DJ7rgoXVM6wZe
FILE NAME Corning OC
DATE 1972 Jan 31
DOC OC084
DOCUMENT DESCRIPTION Memo RE Developing an Asbestos High Temperature Insulation
_
an
oo.
+27
ZEDAVIS SHANNON CC ZEDAVIS
gpm
Thi OnesoOnenson
:
FEB 3 1972
company correspondence
to
J. H. Thomas - Toledo 27
from date
L. W. Saxby - Toledo 23
January 31 1972
subject
W. W. Boeschenstein - 27
_
C. E. Peck - 25
/ _
a
Confirming our conversation of last Thursday here is a brief status report on high temperature insulation as you requested
Immediate development of top priority program for
an asbestos the Construction
high temperature insulation is a Group and the Mechanical Products
Division due to --
1 Accelerating trend by owners and engineers to issue insula-
tion specifications excluding products.containing asbestos
Standard's 2 New Proposed Federal
issued under the Occupational
Safety and Health Act which will all probability signifi-
cantly increase the installed cost of all products containing
:
asbestos
In my
a new
three
1
_
this development development work must be completed in time to introduce
judgment asbestos product by January 1 1973.
Currently we are pursuing
different programs to solve this problem as follows
We are continuing on a priority basis our development of
a completely new and improved high temperature product HTIS
At this time we are conducting trials at Kenetics in
Greenville S.C. on prototype equipment which utilizes an
extrusion process This is the preferred product based upon
preliminary physical and thermal test data and gross margin ...
|
co.
projections
:
2 Dick Shannon is currently evaluating all asbestos calcium silicate products now on the market in an attempt
to find a combination of fibers that will produce a satio-
factory asbestos Kaylo product utilizing our pan pour
process manufacturing equipment in Berlin
) M has verbally offered to license our new asbestos
They apparently want something from OCF in return
pburtocweessdo not know what that something is at the moment
The M development apparently uses glass fibers for rein-
forcement but they do no
eve that their process will
.
ee
work in our pan pouT OF
e
.
crue
"
We introduced in November &
" product called Glaslag to be used
This product con /
.
where mineral wool pipe insula
was been specified
alsts of strips of IS Board turned on end and adhered to an aluminum
jacket
It is recommended for operating temperatures up to 800 F. ve
so
es.
| L,- ad
nr
wd;
ate
eet
a,
: aoe
lw
toa
s
ee
.
a
.
;
fee
.,
. e
. > GT net s ;
:
,
-
soos
8
8
e
)
. .
"
f
LES / j ty
- .
oe
fees P. Kera