Document gEY01obBd8501rgkdb7Xrgr4e

SUMMARY OF ACTION ITEMS FROM CCU S/D PLANNING MEETING Participants Mike Anderson (part-time) Dave Atwood S. S. Braun-1100 Milam Mike Davis Dave Davison Dick Frutiger H. C. Grant-OSP Jerry Ransdell Phil Snyder Date: May 23, 1980 Action Items: PLAINTIFF'S EXHIBIT SH-1340 2) Sandblasting - The Complex policy of using an alternate material for silica sand will be followed on this shutdown. 3) Particulate Control - As a minimum, the contractor will be required to vacuum (or equivalent) particulates on the walls of equipment at least once per day, and twice per day during periods of heavy dust generation (gouging, blasting, etc.). Use of a super-vac or other means of controlling particulate generation will be investigated. 4) Asbestos - Investigate the use of a super sucker and equivalent to remove asbestos backed refractory to control asbestos exposure. If this is impractical, appropriate respiratory will be required. 7) Personal Hygiene Facilities - Contractor should be required to provide showers so that personnel can wash before leaving site. ABS-007403 LAM 024223 Summary of Action Items from CCU S/D Planning Meeting 2 '9 8) Monitoring - The industrial hygiene monitoring should cover the same materials monitored during the last shutdown plus the following: copper, cadmium, lead, and refractory silica. Dist.: Attendees LAM 024224 ABS-007404