Document gDxv32JoZD8g597VJr3Y7moY9

' UNION CARBIDE CORPORATION P. D. BOX BOO-3, SOUTH CHARLESTON. W VA. 25303 Silicones end Urethane Intermediates South Charleston Plant MEMORAND U M l TO: Mr. J. K. Corrie, Jr. Mr. J. Dauch Mr. B. P. Johnson, Jr. Mr. H. E. Lanham/Mr. S. A1 len Mr. A. E. Thompson Mr. W. C. Young/Mr, W. J. Vincent CC: Mr. w. E. Ballard Mr. L. T. Brannon Mr. C. E. Fry Mr. L. B. Hewitt Mr. G. F. Fainter rir. T. * Swanson Mr. J. L. Worste11 FS I.i ef 1 . 2, A 5 FROM: J. G. Roy DATE: December 31, 1985 SUBJECT: No. 2 Steam Plant - Asbestos Removal Attached is the plan to remove asbestos from idle facilities, in No. 2 Steam Plant. 1 believe that all of the agreements we reached in our 12/23/85 meeting are covered. I'm sure other needs and concerns will arise as we get into the project but this appears to be a solid starting point. JGR/sj Attachment UCC 002552 UNION CARBIDE CORPORATION P. O BOX BDO^, SOUTH CHARLESTON. W VA, 25303 Silicones and Urethane Intermediates South Charleston Plant MEMORANDUM TO: Mr. G. L. Bailey Mr. C. C. Carr Mr. R. L. Cummings Mr. F. W. Good Mr. J. D. Patton CC: Mr. J. K. Corrie* Mr. T. G. Swanson* Mr. A. E. Thompson ES List 1 , 2, and FROM: J. G. Roy SUBJECT: No. 2 Steam Plant UCC/Contractor Interface letter only Removal Project - Attached is a copy of the Asbestos Removal Project work plan and a copy of the contractor's sign-in form. As indicated in the work plan under Operation Department requirements, the ES Supervisor will be the key interface. As indicated, the project will be conducted under a Class "A" HWP and each of you will serve as the safety monitor and enforcer of plant safety rules. Inasmuch as there is no tag and lock out required of the idle equip ment, there is no need for a master card. However, there is a need to know where people are working for control purposes. The sign-in sheet is designed to minimize traffic in the control room and let you know on a daily basis where everyone is working. I believe we have addressed all of the major requirements for a successful project. Should anything come up that is not covered by the plan, please let me know. JGR/sj Attachment UCC 002553 No. 2 Steam Plant Asbestos Remova1 Project Plan - January 1986 1. UCC Contractor Safety Orientation - Johnson A. The contractor's personnel will be staying at the Ramada Inn. Contractor supervision will be provided with vehicle passes to transport their workers to the job site and parking will be in the visitor section of the upper island lot. B. All of the workers, except one, were on the No. 1 Steam Plant project and have been given the safety orientation. The orienta tion will be given to the new person. 2. Operation Department Requirements - Thompson/Roy A. The contractors will wear hearing protection in addition to the personal protective equipment outlined in the safety orientation. B. Working hours inside the building will be after 4:00 p.m. Monday through Friday. Day time activity is permissible for outdoor removal and on Saturday and Sunday. The contractor plans to start on January 2 and plans to work the first weekend. C. Work will be conducted under a Class "A" permit. While a MT/LO card will not be used, the contractor supervisors will sign in with the ES supervisor showing the crew size and work location. D. The ES supervisor will be the UCC interface and will be responsible for ensuring that safety procedures are followed. E. The contractor supervision will be responsible for installing barrier tape around the parameter of each work site. F. The ES supervisor will maintain a supply of Type 9910 masks and paper coveralls for any necessary work site entries by either Operations or Maintenance personnel. A plastic bag lined container will be provided by Operations to dispose of used masks and disposable coveralls. G. J. G. Roy will attend the Area III Maintenance tailgate meetings on December 30 and January 6 to cover the plan with Maintenance personnel. H. Dave Hall will include status of the project and work activities in his daily notes to the shift group. 3. Maintenance - Corrie/Lanham A. The dumpster will be located east of the No. 2 inclined belt next to the roadway. Trucking will be arranged to ensure that the dumpster arrives at Goff Mountain before 11:30 a.m. on week days. Dave Hall will prepare the waste manifest. UCC 002554 3. Maintenance - Corrie/Lanham (continued) 2 B. The contractor will keep the dumpster covered with plastic during rain or snow conditions and during off hours. C. Hot water from the control room/office water heater and cold city water will be provided to the contractor's change room. D. Adaptors will be provided to connect the standard three-pronged 120V cords to the other style 120V receptacles, (two required tor 25 amp loads). E. ,, The contractor's change room will be a temporary enclosure (built by the contractor) located at the north end of the storage area on the east side of the basement floor under the office/control room. The north end door to the storage area will be used during the project and access to the storage area will be the south door. 4. Safety - Vincent/Young A. The Safety Department will ensure that the rescue squad vehicle has a supply of masks and paper coveralls to permit rescue inside the barri caded vork sites. E. The Safety Department will survey the work areas and install strateg ically placed continuous air quality monitors outside of the barricade areas to ensure that air quality is not deteriorated by the asbestos removal work. 5. CouLracter A. The contractor will limit the crew sizes to 5 or less per supervisor and plans to work up to three crews. He estimates a February 1 comple tion. B. The contract workers will use their own showering facilities which are equipped with water filters on the drains. They will use a "Cadle" portable toilet. C. The contractor will enclose the work areas and use a blower equipped with an approved filter to pull air from the enclosure as a means of controlling fugitive fibers. UCC 002555 No. 2 Steam Plant Asbestos Removal Project Daily Contractor Sign-In Log Date: Sune rvi sfir Signatures: Crew I Crew 11 Crew 111 T f rne 7 fl Time Out Crew Size tlj u c ^ nl Work Site Identification 1. 14 I.D. Fan & Breec hing 2. 12 Prec ini t at o1" Nop npr? I , 3. 13 Precipitator Hoppers 4. 14 Boiler 3rd & 4th Leve1s 5. 14 oiler 1st & 2nd Levels 6. 12 Precipitator Breeching/Duct 7. 12 Boiler 1st & 2nd Levels 8. 12 Boiler 3rd & 4th Leve1s 9. 12 Bubar 10. 12 A 13 Pulverizer Ducts 11. 12 & 13 Coal Feeder Air Ducts i 2. No,. 3 BFVJ? Piping 13. Other UCC 002556