PCB losses as measured from the plant and at the treatment plant have been as fellows this year.
Combined 24" & 30" Plant Exit
Sewers
Treatment , Plant
Influent
Treatment Plant
Effluent
January February March April May June July August (thru
25 th)
44 #/day 29 34
29 20 15 18 13 '
84 #/day 50 25 76 68 77 20 32
49 #/day 12 9 24 22
. 36 8
12
Losses as measured at the plant exit sewers continue to decrease slightly. Losses at the treatment plant effluent appear to be leveling and are above the plant goal of 2 #/day.
There is a discrepancy in the difference between the plant exit sewers and the treatment plant influent. These two values should be about the same. We have not found major amounts of PCB's in the flows external to the plant that combine with the plant sewer before entering the treatment plant.
Also, measurements at the department average less than 1 #/day. This is far below values from the plant or at the treatment plant.
b bte
ur immediate plans are to:
1. Obtain a.dditional samples from an adjacent (3B) sampling spot in the 24" sewer to cross-check routine samples obtained at (2A).
6/2.5/^/
e/jo Bit,
*3-6
0;H
o.5
AA
HP lo.o
XL 7,7
DSW 295933
STLCOPCB4065877
V ' VV
Mr. A. E, , Leisy PCB Sewe r Losses
Page 2
WGK
8/31/71
ilfry(zr
l-K
2.
2^lw) 4 (*.,
H O'") ztyo*, 3.
l A~.<. .3^*
Obtain grab samples at treatment plant and possibly other locations to compare with routine samples in effort to cross-check existing sampling procedure.
4tttiiKui... / *" t
Install additional sampler at point where
fyvJdCL ^/z/iI
department losses are measured (4Z). Will
be a shift sampler and will check only for
'U&f'/
presence of two phases. Will not analyze.
*
_.
Sample tube to extend to bottom of sewer box.
/p/i
Intent is to detect slug flows from the de partment.
dtrut/, {'I; 4~Y 4
`^K/4. M
Compare analyses before and after blowing of
sewer lines (mercury project) to note possible ' removal of PCB's from sewer system.
4 Qu-j: \ 5. Complete research work related to analysis
of PCB's in sewer streams. Resolve quantita tive method based on peaks or area under GLC curves.