Document gDqe5gbjmVnO76OXR4VRq8Z6L
PLANT MANAGER'S SAFETY BOARD
Bostick
0-8
Forsthoffer 0-5
Gatewood Hammann
1Z 0-22
Hammond
0-12
J. S. Hagood B. C. Lancaster J. D. McPhail D. W. Metten S. G. Pappas
0-7
CED 0-6 OA-19
0-10A
G. T. Ryan
G. E. Small G. L. Tromblee G. L. Wofford
0-5
OA-12 0-10 OA-7
PMSB Meeting Minutes Distribution:
Anderson, W. T.
Attra, R. Barfoot, D. A. Bailey, E. P. Bell, E. W.
Berry, A. M. Bobo, W. R. Carlisle, J. F. Conrad, A. H. Curtis, B. P. Cruse, C. M. Danner, G. A. Daues, G. W. DuPuis, E. R. Eby, R. T. Evans, P. W. Fritz, R. M. Gaul, J. Hancock, C. M.
Heines, W. M. Hernandez, R. A. Jackson, R. S. Juhl, W. G.
0-18 OA-19 51D 2Z OA-19 SS-14 SS-14 OA-4 0-5 2R-46 0-11 0-21 0-21 OA-13
OA-11 OA-11 1R-16 AB-1 0-21 OA-13 OA-3 0-10A OA-13
Kos, D. D. Lacy, H. M. Latimer, W. W.
McCune, L. C. Meisetschlaeger, G. Newman, S. O'Donnel 1, W. Orum, G. A. Parker, R. V. Parks, J. C. Pease, D. Reid, W. Rolingson, W. R. Saunders, P. K. Schroeder, H. Sharp, R. Trafton, J. G.
Triplett, W. H. Uriarte, A. K.
Vanderhoven, P. Wise, D. R. Yeretsky, S. J.
OA-9 0-6 OA-16 OA-11 0-7 0-21 ED 2PD OA-9 OA-9 AB-3 OA-19 1R-16 3R-16 OA-19 PER OA-3 OA-4 2R-2
OA-19 OA-13 OA-7
NOTE: Notify Dorothy Bibby (3069) of any changes to the above mail codes.
SC 13688 LAM015437
PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING April 24, 1985
I. PLANT STATISTICS A. Texas City Plant Safety Performance Summary - March
INJURIES WITHOUT LOST WORKDAYS (medical treatment only)
LOST WORKDAYS CASES RESTRICTED ACTIVITY DAYS AWAY FROM WORK CASES
FATALITIES
TOTAL RECORDABLE CASES
1984 MAR YTD
00
00 00 00 00
00
1985 MAR YTD
01
00 00 00 00
01
1985 TARGETS
4
0 0 0 0
4
INJURY RATES PER 200,000 MANHOURS
1984
1985
MAR YTD MAR YTD
1985 TARGETS
1985
MFIC FEB
TARGET YTD
TOTAL INJURY-TIR TOTAL RECORDABLE-TRR TOTAL LOST WORKDAY-TLWR
DAYS-AWAY-FROM-WORK-DAWR
8.13 0.00 0.00 0.00
9.02 0.00 0.00 0.00
9.16 0.00 0.00 0.00
8.18 0.30 0.00 0.00
0.30 0.00
--
__-- 0.95
--
--
--
0.50 0.19 0.19
B. Off-the-Job Safety Performance
Cases
Frequency
March YTD
4 1..91 4 0.48
II. POLICY CHANGES
A. Interlock By-pass Procedure
Procedures for by-passing critical interlocks have been obtained from the Chocolate Bqyou and Pensacola plants (maleic anhydride). This information is currently under review by SHAC.
13689
LAM015438
PMSB Minutes of Meeting - April 24, 1985
Page 2.
III.
ACTION ITEMS
A. Job Safety Audits
Information and materials have been obtained and training of trainers in operations, maintenance and PT will be completed by May 31. Training of plant personnel is expected to be completed by Septenber 1.
B. HHM Audits
The report to Don Bell concerning the MFI HHM audit has been issued. Completion dates for action items are firm and must be adhered to.
C. Annual Safety and Housekeeping Inspection
The 1985 inspection is expected to be conducted in the same manner as last year's with an interchange of inspectors between Texas City and Chocolate Beyou.
D. Chemical Matrix Data
Data sheets have been received from all units and laboratories. This data will be reviewed to ensure uniformity. Sheets are expected to be available for display in appropriate areas by August 1.
E. 1984 Annual Safety and Housekeeping Recommendations
The status on these recommendations was reviewed. Two additional comments are:
Item 1: Review of operating manuals must be formalized to ensure that they are conducted on a periodic basis.
Item 6: The policy of supplying Universal with safety equipment will be reviewed.