Document gDqe5gbjmVnO76OXR4VRq8Z6L

PLANT MANAGER'S SAFETY BOARD Bostick 0-8 Forsthoffer 0-5 Gatewood Hammann 1Z 0-22 Hammond 0-12 J. S. Hagood B. C. Lancaster J. D. McPhail D. W. Metten S. G. Pappas 0-7 CED 0-6 OA-19 0-10A G. T. Ryan G. E. Small G. L. Tromblee G. L. Wofford 0-5 OA-12 0-10 OA-7 PMSB Meeting Minutes Distribution: Anderson, W. T. Attra, R. Barfoot, D. A. Bailey, E. P. Bell, E. W. Berry, A. M. Bobo, W. R. Carlisle, J. F. Conrad, A. H. Curtis, B. P. Cruse, C. M. Danner, G. A. Daues, G. W. DuPuis, E. R. Eby, R. T. Evans, P. W. Fritz, R. M. Gaul, J. Hancock, C. M. Heines, W. M. Hernandez, R. A. Jackson, R. S. Juhl, W. G. 0-18 OA-19 51D 2Z OA-19 SS-14 SS-14 OA-4 0-5 2R-46 0-11 0-21 0-21 OA-13 OA-11 OA-11 1R-16 AB-1 0-21 OA-13 OA-3 0-10A OA-13 Kos, D. D. Lacy, H. M. Latimer, W. W. McCune, L. C. Meisetschlaeger, G. Newman, S. O'Donnel 1, W. Orum, G. A. Parker, R. V. Parks, J. C. Pease, D. Reid, W. Rolingson, W. R. Saunders, P. K. Schroeder, H. Sharp, R. Trafton, J. G. Triplett, W. H. Uriarte, A. K. Vanderhoven, P. Wise, D. R. Yeretsky, S. J. OA-9 0-6 OA-16 OA-11 0-7 0-21 ED 2PD OA-9 OA-9 AB-3 OA-19 1R-16 3R-16 OA-19 PER OA-3 OA-4 2R-2 OA-19 OA-13 OA-7 NOTE: Notify Dorothy Bibby (3069) of any changes to the above mail codes. SC 13688 LAM015437 PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING April 24, 1985 I. PLANT STATISTICS A. Texas City Plant Safety Performance Summary - March INJURIES WITHOUT LOST WORKDAYS (medical treatment only) LOST WORKDAYS CASES RESTRICTED ACTIVITY DAYS AWAY FROM WORK CASES FATALITIES TOTAL RECORDABLE CASES 1984 MAR YTD 00 00 00 00 00 00 1985 MAR YTD 01 00 00 00 00 01 1985 TARGETS 4 0 0 0 0 4 INJURY RATES PER 200,000 MANHOURS 1984 1985 MAR YTD MAR YTD 1985 TARGETS 1985 MFIC FEB TARGET YTD TOTAL INJURY-TIR TOTAL RECORDABLE-TRR TOTAL LOST WORKDAY-TLWR DAYS-AWAY-FROM-WORK-DAWR 8.13 0.00 0.00 0.00 9.02 0.00 0.00 0.00 9.16 0.00 0.00 0.00 8.18 0.30 0.00 0.00 0.30 0.00 -- __-- 0.95 -- -- -- 0.50 0.19 0.19 B. Off-the-Job Safety Performance Cases Frequency March YTD 4 1..91 4 0.48 II. POLICY CHANGES A. Interlock By-pass Procedure Procedures for by-passing critical interlocks have been obtained from the Chocolate Bqyou and Pensacola plants (maleic anhydride). This information is currently under review by SHAC. 13689 LAM015438 PMSB Minutes of Meeting - April 24, 1985 Page 2. III. ACTION ITEMS A. Job Safety Audits Information and materials have been obtained and training of trainers in operations, maintenance and PT will be completed by May 31. Training of plant personnel is expected to be completed by Septenber 1. B. HHM Audits The report to Don Bell concerning the MFI HHM audit has been issued. Completion dates for action items are firm and must be adhered to. C. Annual Safety and Housekeeping Inspection The 1985 inspection is expected to be conducted in the same manner as last year's with an interchange of inspectors between Texas City and Chocolate Beyou. D. Chemical Matrix Data Data sheets have been received from all units and laboratories. This data will be reviewed to ensure uniformity. Sheets are expected to be available for display in appropriate areas by August 1. E. 1984 Annual Safety and Housekeeping Recommendations The status on these recommendations was reviewed. Two additional comments are: Item 1: Review of operating manuals must be formalized to ensure that they are conducted on a periodic basis. Item 6: The policy of supplying Universal with safety equipment will be reviewed. 13690 /dgb R. T. Hammann LAM015439