Document gDmpggDZQVVZn9Y6YrgRoXbyQ
SECTION 10: VENTILATION PROGRAM / REPORTS
The Louisiana Division Ventilation Program complies with the Corporate Industrial Hygiene: Guidelines and Resource Document For the Selection, Use, and Maintenance of Chemical Laboratory Fume Hoods.
Ventilation systems are designed to protect the health of individuals by removing physical and chemical stresses from the workplace. To ensure that these ventilation systems are-operating.effectively,-theXouisiana Division Ventilation Program consists of a detailed inventory of the local exhaust equipment at the plant/department level. This equipment is placed on a plant/department-specific performance evaluation and maintenance schedule to ensure effective operation of the equipment. Manufacturer's specifications and applicable guidelines for all equipment and applications are utilized to ensure the proper operation of local exhaust ventilation.
Operating Criteria: Periodic performance evaluations are performed by the Industrial Hygiene Department. The Industrial Hygiene Department shall be consulted on the purchase and installation of all local exhaust and lab hood systems.
Local Exhaust Ventilation Performance Criteria: Capture velocities may range from 100-2000 feet per minute (fpm) depending on contaminant size, generation rate, air currents and other variables. Each local exhaust ventilation system must be independently evaluated to determine adequate operating parameters.
Laboratory Fume Hood Performance Criteria: Face velocity is measured according to operating conditions which can be with sash fully open, with the sash at 18" from the bottom of the hood, and with the sash at a marked restricted sash opening (if necessary). Average face velocity should be greater than or equal to 100 feet per minute (fpm) and not exceeding 150 (fpm). (NOTE: certain OSHA regulated carcinogens require 150 (fpm).} A smoke stream is introduced into the hood for measuring internal turbulence. If the air capture is well defined with minimal internal turbulence and no smoke swirls back to the hood face with a person standing in front of it, the hood air flow is judged as good. If the air capture is positive but has some internal turbulence observed at the hood face with no smoke escaping the hood, the hood air flow is judged as moderate. If the air capture is weak and/or not well defined and smoke escapes the hood face, the hood air flow is judged as poor.
Fume hoods with a locally-mounted pressure or flowing sensing device readings must be obtained quarterly. The readings should be recorded on Appendix "C" and retained in this section.
1/31/95
10.1
nti*l
Evaluation Schedule: All fume hoods must have an Industrial Hygiene Hood Evaluation. Lab hoods without a locally-mounted pressure or flowing sensing device must have 6 month evaluation conducted by the I.H. Department. Lab hoods with a locally-mounted pressure or flowing sensing device must have an evaluation every three years. After the hood evaluation is completed, an I.H. Hood Evaluation sticker is placed on the hood (Appendix E).
Training: Training on laboratory fume hoods shall be conducted periodically for all employees. The training consists of: 1) appropriate uses of laboratory fume hoods; 2) problems associated with hood location; and 3) criteria and methods of evaluation for performance of laboratory fume hoods.
Documentation: Documentation must be maintained by the Plant I.H. Contact as part of the plant/department Industrial Hygiene program (Appendix A-D). Each plant/department should prepare a Ventilation System Inventory of all lab hood and local exhaust systems located in their facility.
This section contains the following documents:
1. Plant/department-Specific Ventilation Program The following documents make up the plant/department ventilation program:
Ventilation System Inventory (Appendix A) industrial Hygiene Hood Evaluation (Appendix B) Quarterly Checklist For Fume Hood (Appendix C) Fume Hood Troubleshooting Guide (Appendix D)
2. Lab Mood/Local Exhaust Ventilation Inventory This provides a list of the type and location of the ventilation systems used in your plant/department.
3. Current Industrial Hygiene Hood Evaluation for Plant/department Area The most recent Industrial Hygiene Hood Evaluation documentation should be kept in the manual.
4. Corporate Industrial Hygiene: Guidelines and Resource Document For the Selection, Use, and Maintenance of Chemical Laboratory Fume Hoods
5. Quarterly Check of Flow Sensing Device for Fume Hood & Housekeeping This provides the necessary documentation to assure the hood is checked regularly for proper operation.
6. Fume Hood Troubleshooting Guide This provides a guide fortroubleshooting a fume hood system.
7. MSMS Welding Sign Illustration
8. Calculation Sheet for Number of Fans for Confined Space Entry
1/31/95
102
DO A 044098 C0NFID ENTTAI
Section 10 Ventilation Program/Reports Table of Contents
Section Name
See
Lab Hood and Local Exhaust Ventilation InventoryAppendix A
Current Industrial Hygiene Hood Evaluation for Plant/department AreaAppendix B
Quarterly Check of Flow Sensing Device and General HousekeepingAppendix C
Fume Hood Troubleshooting GuideAppendix D
Industrial Hygiene Sticker for Hood EvaluationAppendix E
Corporate Industrial Hygiene: Guidelines and Resource Document for the Selection, Use, and Maintenance of Chemical Laboratory Fume HoodsAppendix F
MSMS Welding Sign Illustration
Appendix G
Calculation Sheet for Number of Fans for Confined Space EntryAppendix H
A 044099
CONFrOFNTTAL
c
Appendix "A" Lab Hood
( and
Local Exhaust Ventilation Inventory
(
Do
Dotsip
Appendix A
ILffid) / H<[| dssIhaiQastt Wcraii8[litiaiPi Itawwiattoiry
Plant/Department:.
Year:
Hood Identification
Location
_Us!
Do COt\jpr A 447a
:NttAl
*Give the intended use for the ventilation source for example: for volatile liquids/vapors, dusty operation, welding, etc.
Appendix "B" Current
Industrial Hygiene Hood Evaluation
for
Plant/department Area
DO A 044102 CONFIDENTIAL
October 30, 1991
Dow U.S.A
The Dow Chemical Company P.O. Box 150
Plaquemme, Louisiana 70765-0150
Mike Brown
Solvents/EDC
Building 1601
cc: T. M. Gunn Wayne Miller Ronnie Hotard
Solvents/EDC Solvents/EDC Solvents/EDC
Building 1601 Building 1601 Building 1601
On October 29, 1991, the fume hoods in the Solvents/EDC Plant, Building 1601, were checked for face velocity. The Alnor Model 8925 Thermo Anemometer was used to take the face velocity measurements. These hoods must be a(n) "A" classification because of the work being performed in them and/or the chemicals stored in the hoods. The hoods were checked at 18"
and 28" (fully opened) sash openings.
Process Lab Hood #2 sash door is broken and a pipe is being used to keep the sash opened. This needs to fixed as soon as possible. West Acid Hood and Process Lab Hood #3 are out of service in this plant. The East Acid Hood is classed as "inadequate" and maintenance should be performed as soon as possible. This hood cannot be used for work with carcinogens or highly toxic chemicals until the hood is repaired and re-evaluated by Industrial Hygiene.
The criteria for hood classification, smoke tube observation, and flow measuring devices used in rating hood ventilation performance is attached.
Also included are recommendation(s), observation^), testing data sheet(s), an annual fume hood system maintenance check sheet and a weekly check of fume hood flow measuring device checklist which should be followed to maintain effective hood ventilation and appropriate classification.
Please respond in writing to Industrial Hygiene within one month as to action taken or planned in regard to these recommendations.
Please feel free to contact me with any questions.
Thank you,
^
Darlene S. Creel 3502-W Industrial Hygiene Ext. 6181
'
03 DO ft DEMTTftL
confi
k
Page 2
Observations: The laboratory hood designation, the average face velocity (FV) and minimum measurements (FVm) reported in feet per minute (FPM), and its rated classification is as follows:
DesignationSash Hood Opening
Acid Hood (West wall)
BROKEN
Acid Hood (East wall) Smoke Observation POOR.
18"
(FPM) FV
BROKEN
82
(FPM) FVm
BROKEN
63
Classification BROKEN
**
Loading Lab Hood #3 Smoke Observation GOOD.
18"
Static Pressure
at 18'1 sash opening.
Loading Lab Hood #4 Smoke Observation GOOD.
18"
Static Pressure 2Ji at 18"1 sash opening.
Process Lab Hood #1 Smoke Observation POOR.
28"
203 200 100
142 151 42
"A" "A" **
Process Lab Hood #1 Smoke Observation GOOD.
17"
183 153
Static Pressure L (Dwyer K.S.E. checked yearly by Craig. Landry).
"A"
Process Lab Hood #2
25"
156 116
Smoke observation GOOD-
Static Pressure .9 (Dwyer K.S.E. checked yearly by Craig Landry).
Process Lab Hood #3
BROKEN
BROKEN
BROKEN
"A" BROKEN
"INADEQUATE
Recommendations: 1. The hoods should be placed on the C-9 checklist for a weekly check of die flow
measuring device and an annual maintenance checklist performed on it. Process lab hoods #1 & #2 have a Dwyer K.S.E. flow measuring device on them and they are checked by Craig Landry annually. It is recommended that the lab supervisor look into installing a Dwyer Model 25 or 27 manometer on these hoods as to keep all flow measuring devices in the plant the same.
2. Air flow monitors are installed on the hoods to provide the means for checking velocity before hood use. Documentation of an air flow monitor device performance is to be done once per week. I am enclosing an example of the documentation needed so that these hoods may go on a two-vear survey rotation. Inspection, zeroing and calibration of air flow device is to be done once per year. This documentation is to be part of the Industrial Hygiene records for your
DO A 044104 CONFIDENTIAL
Page 3
L
department. Please forward documentation to the Plant Industrial Hygiene Contact for vour plant. 3. Keep lab equipment, supplies and samples/sampling equipment to a minimum inside hoods. 4. It is recommended that the lab purchase or make some type of rack(s) to get the samples/sample equipment raised from the bottom of the hood to facilitate better air flow. 5. Practice good housekeeping techniques. 6. Process Lab Hood #2 sash door is broken and a pipe is being used to keep the sash opened. This needs to fixed as soon as possible. 7. Mechanical stops are in placed on the Acid Hoods and Loading Lab hoods #3 & #4. It is recommended that the lab installed mechanical stops on the remaining hoods at an 18" sash opening.
n A 0^f
CRITERIA FOR HOOD CLASSIFICATION. SMOKE TUBE OBSERVATION. AND FLOW MEASURING DEVICES
Page 4
CLASSIFICATIONS:
CLASS "A" (High Toxicity Use) Carcinogenic, Toxic Highly Flammable
125-150 FT/MIN AVERAGE FACEVELOCITY 100 FT/MIN MINIMUM READING
CLASS "B" (MODERATE TOXICITY USE) Toxic or Flammable
INADEQUATE DOES NOT MEET MINIMUM REQUIREMENTS
100 FT/MIN AVERAGE FACE VELOCITY 80 FT/MIN MINIMUM READING
SMOKE TUBE OBSERVATIONS:
****GOOD (Air capture by hood is strong and well defined with minimal internal turbulence, and no observable smoke swirling back to hood face when person stands at hood face.)
****MqDERATE (Air capture by hood is positive but with some internal turbulence observed approaching the hood face. No smoke escaping the hood.)
****POOR (Air capture by hood is weak and/or not well defined. Turbulence inside the hood and smoke observed escaping hood face.)
FLOW MEASURING DEVICES:
When the static pressure deviates (-/+) 10% from the listed static pressure, item #21 should be followed on the maintenance checklist attached to this report. The static pressure reading was established at the time of the performance check and indicated by a red line on the device. Documentation of air flow monitor device performance is to be done once per week. Inspection, zeroing and calibration of air flow device is to be done once per year. This documentation is to be part of the Industrial Hygiene records for your plant. Please forward documentation to the plant Industrial Hygiene contact for your plant.
DO A 044106 CONFIDENTIAL
Page 5
LOUISIANA DIVISION INDUSTRIAL HYGIENE HOOD PERFORMANCE TESTING DATA
PLANT:
SOLVENTS/EDC BUILDING 1601
HOOD ID.: ACID HOOD (EAST WALL)
DATE: OCTOBER 29, 1991 TESTED BY: DARLENE CREEL
STATIC PRESSURE READING
NA
HOOD FACE VELOCITY READINGS AT A(N) 1*T SASH OPENING.
186 87 85|
|92 90 931
|63 67 73|
SMOKE TUBE OBSERVATIONS WITH A(N) l&l SASH OPENING -
****POOR (Air capture by hood is weak and/or not well defined. Turbulence inside the hood and smoke observed escaping hood face.)
DesignationSash Hood Opening
(FPM)
(FPM)
FVFVmClassification
Acid Hood (East wall)
18"
82
63
**
^INADEQUATE
Used the Alnor Model 8925 Thermo Anemometer.
FV=AVERAGE FACEVELOCITY FVm = MINIMUM MEASUREMENT FPM = FEET PER MINUTE
DO A 044107 CONFIDENTIAL
c Page 6
LOUISIANA DIVISION INDUSTRIAL HYGIENE HOOD PERFORMANCE TESTING DATA
PLANT:
SOLVENTS/EDC BUILDING 1601
HOOD I.D.: LOADING LAB (HOOD #3)
DATE: OCTOBER 29,1991 TESTED BY: DARLENE CREEL
STATIC PRESSURE READING_____3.4___ .
HOOD FACE VELOCITY READINGS AT A(N) DT SASH OPENING.
|221 220
235|
|190
190
2191
|184
142
222|
SMOKE TUBE OBSERVATIONS WITH A(N)
SASH OPENING -
****GOOD (Air capture by hood is strong and well defined with minimal internal turbulence, and no observable smoke swirling back to hood face when person stands at hood face.)
DesignationSash Hood Opening
(FPM)
(FPM)
FVFVmClassification
LOADING LAB HOOD #3
18"
203
142
"A"
Used the Alnor Model 8925 Thermo Anemometer.
FV=AVERAGEFACE VELOCITY FVm = MINIMUM MEASUREMENT FPM = FEET PER MINUTE
DO A 044103 CONFIDENTIAL
Page 7
LOUISIANA DIVISION INDUSTRIAL HYGIENE HOOD PERFORMANCE TESTING DATA
PLANT:
SOLVENTS/EDC BUILDING 1601
HOOD ID.: LOADING LAB (HOOD #4)
DATE: OCTOBER 29, 1991 TESTED BY: DARLENE CREEL
STATIC PRESSURE READING
2.8
HOOD FACE VELOCITY READINGS AT A(N) DT SASH OPENING.
|225
182
230|
|216
178
2051
1213 151
2031
SMOKE TUBE OBSERVATIONS WITH A(N) DT SASH OPENING -
****GOOD (Air capture by hood is strong and well defined with minimal internal turbulence, and no observable smoke swirling back to hood face when person stands at hood face.)
(FPM) DesignationSash Hood Opening FV
(FPM) FVmClassification
LOADING LAB HOOD #4
18"
200 151
"A"
Used the Alnor Model 8925 Thermo Anemometer.
FV=AVERAGE FACE VELOCITY FVm -- MINIMUM MEASUREMENT FPM = FEET PER MINUTE
DO A 044109 CONFIDENTIAL
Page 8
LOUISIANA DIVISION INDUSTRIAL HYGIENE HOOD PERFORMANCE TESTING DATA
PLANT:
SOLVENTS/EDC BUILDING 1601
HOOD LD.: PROCESS LAB HOOD #1
DATE: OCTOBER 29, 1991 TESTED BY: DARLENE CREEL
STATIC PRESSURE READING NA
HOOD FACE VELOCITY READINGS AT A(N) 28^ SASH OPENING.
1123 125 180|
1107
112
75|
| 69 67 42|
SMOKE TUBE OBSERVATIONS WITH A(N) 2*P SASH OPENING -
****POOR (Air capture by hood is weak and/or not well defined. Turbulence inside the hood and smoke observed escaping hood face.)
DesignationSash Hood Opening
FV
(FPM) (FPM) FVm_____________________ Classification
Process Lab Hood #1
28"
100 42
**
** INADEQUATE
Used the Alnor Model 8925 Thermo Anemometer.
FV=AVERAGE FACE VELOCITY FVm = MINIMUM MEASUREMENT FPM = FEET PER MINUTE
0441-10 DO P OPNTTAL
conFT
Page 9
LOUISIANA DIVISION INDUSTRIAL HYGIENE HOOD PERFORMANCE TESTING DATA
PLANT:
SOLVENTS/EDC BUILDING 1601
HOOD ID.: PROCESS LAB HOOD #1
DATE: OCTOBER 29, 1991 TESTED BY: DARLENE CREEL
STATIC PRESSURE READING___ 1.5____.
HOOD FACE VELOCITY READINGS AT A(N) HI SASH OPENING.
|191 |180 |192
166 197 213
1 1 187 187 187
1 1 153 156 157
_ 1_.
216| 206| 160|
SMOKE TUBE OBSERVATIONS WITH A(N) FT SASH OPENING -
****GOOD (Air capture by hood is strong and well defined with minimal internal turbulence, and no observable smoke swirling back to hood face when person stands at hood face.)
DesignationSash Hood Opening
Process Lab Hood #1
17"
(FPM) FV
(FPM) FVm________ Classification
183 153
"A"
Used the Alnor Model 8925 Thermo Anemometer.
FV=AVERAGE FACE VEIjOCITY FVm -- MINIMUM MEASUREMENT FPM = FEET PER MINUTE
DO A 044111 CONFIDENTIAL
Page 10
LOUISIANA DIVISION INDUSTRIAL HYGIENE HOOD PERFORMANCE TESTING DATA
PLANT:
SOLVENTS/EDC BUILDING 1601
HOOD ID.: PROCESS LAB HOOD #2
DATE: OCTOBER 29, 1991 TESTED BY: DARLENE CREEL
STATIC PRESSURE READING 0.9
HOOD FACE VELOCITY READINGS AT A(N) 25^ SASH OPENING.
(Process Lab Hood #2 sash door is broken and a pipe is being used to keep die sash) (opened. This needs to fixed as soon as possible.)
|201 197 200|
|151 139 132|
1131 116 135|
SMOKE TUBE OBSERVATIONS WITH A(N) 25^ SASH OPENING -
****GOOD (Air capture by hood is strong and well defined with minimal internal turbulence, and no observable smoke swirling back to hood face when person stands at hood face.)
DesignationSash Hood Opening
FV
Process Lab Hood #2
25"
(FPM) (FPM) FVm______________________Classification
156 116
"A"
Used the Alnor Model 8925 Thermo Anemometer.
FV=AVERAGE FACE VELOCITY FVm = MINIMUM MEASUREMENT FPM = FEET PER MINUTE
DO A 044112 CONFIDENTIAL
ANNUAL FUME HOOD SYSTEM MAINTENANCE SHEET
THE FOLLOWING ITEMS NEED TO BE INSPECTED AND/OR REPAIRED ON THE
FUME HOOD VENTILATION SYSTEM LISTED BELOW:
DATE:FUME HOOD I.D7LOCATION: INSPECTED BY:REPAIRED BY:
___________________
1. INSPECT/CHECK AND CLEAN FAN ASSEMBLY AND FAN SUCTION/ DISCHARGE (DIRT, CORROSION, ETC.)
_______________
2. LUBRICATED FAN BEARINGS PER REQUIREMENTS
_______________
3. CHECK FAN ROTATION AND OPERATION
_______________
4. INSPECT FAN WHEEL/BLADES FOR WEAR OR BUILDUP
_______________
5. CHECK FOR UNDUE FAN VIBRATION AND/OR AIR PULSATION OR NOISE
_______________
6. INSPECT FAN AND MOTOR HOUSINGS FOR WEAR OR HOLES
_______________
7. PERFORM MOTOR P.M. INSPECTIONS PER REQUIREMENTS (MOTOR TEMPERATURE, AMPERAGE, AND RPM.)
_______________
8. LUBRICATE MOTOR BEARINGS PER REQUIREMENTS
_______________
9. TIGHTEN ALL NUTS AND BOLTS
_______________
10. INSPECT MOTOR MOUNTS
_______________
11. INSPECT/CHECK BELTS AND SHEAVES FOR WEAR AND ALIGNMENT _______________
12. REPLACE AND/OR ADJUST BELTS AND SHEAVES AS REQUIRED
_______________
13. INSPECT VIBRATION ISOLATORS, PADS AND SPRINGS
_______________
14. LUBRICATE AND ADJUST DAMPERS AND LINKAGES
_______________
15. CHECK VIBRATION ISOLATION ON INLET DUCT FOR HOLES OR RESTRICTION
_______________
16. INSPECT ELECTRICAL CONNECTIONS AND ISOLATION
_______________
17. INSPECT AND CLEAN FILTERS AND DRAINS
_______________
18. INSPECT/CLEAN HOOD OF UNNECESSARY ITEMS (SUPPLES)
_______________
19. INSPECT/CLEAN SLOTS AND REAR BAFFLES INSIDE HOOD
_______________
20. INSPECT/CLEAN GLASS DOOR OF FUME HOOD
_______________
21. INSPECT/CALBRATE/ZERO PRESSURE OR FLOW-SENSING DEVICE (PER MANUFACTURER'S INSTRUCTIONS)
_______________
RETURN TO PLANT INDUSTRIAL HYGIENE CONTACT REV: 7/91 DSCxrnk
DO A 044113 CONFIDENTIAL
WEEKLY CHECK OF FUME HOOD FLOW MEASURING DEVICE
Weekly documentation on permanent, locally-mounted pressure or flow sensing device. If the static pressure deviates (+/-) 10% from the static pressure setpoint, inspect, calibrate and zero pressure measuring device according to manufacturer's instructions. If device is zeroed and static pressure is still out of (+/-) 10% range, please call Industrial Hygiene as soon as possible. The static pressure reading was established at die time of performance check by Industrial Hygiene and indicated by a red line on the device. When a continuous monitor device measuring velocity directly deviates 10% from the initial value, investigation and preventive maintenance shall be performed.
SETPOINT
ZERO
FLUID LEVEL DEVIATION
DO A 044114 CONFIDENTIAL
PAGE 2
SETPOINT
ZERO
FLUID LEVEL DEVIATION
REV: 7/91 DSCrcmk
DO A 044115 confidential
INDUSTRIAL HYGIENE REPORT
File Number LAD.IH- 95.01
GULF COAST INDUSTRIAL HYGIENE CENTER LOUISIANA DIVISION
Date Issued: 03/13/95
Plant Code: 0261 AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY
TiUe
Face Velocity Readings on Fume Hood #2601-A, Chlorine Facility, Plaquemine, Louisiana.
Authors
Darlene Creel
Reviewers
Introduction
Jackie Paul
An industrial hygiene ventilation survey was conducted on the fume hood #2601-A at the Chlorine Facility, Building 2601, Louisiana Division, Plaquemine, Louisiana, on February 24, 1995. Face velocity measurements were taken to assess the fume hood performance, in accordance with the surveillance plan outline in the Industrial Hygiene Program. Operating conditions during this survey were routine.
Background
Results and Conclusions
Observations
This facility has one fume hood that is equipped with a flow-sensing device. The fume hood is on an every three year industrial hygiene evaluation rotation.
The following conclusions were based on conditions that existed on the day of this survey. Changes in equipment, procedures, or other conditions that affect exposures could alter or invalidate these conclusions. The fume hood met face velocity measurements needed for the service of operation. The smoke tube observation within the hood showed no internal turbulence swirling back towards the face of the hood.
The average face velocity (FV) and minimum face velocity (FVm) reported in feet per minute (FPM), are as follows:
Designation #2601-A
Sash Opening 18"
FV (FPM) 94
FVm (FPM) 80
For more detailed information on individual hood evaluation, see attachment.
Recommendations This hood should be placed on a QUARTERLY check of the flow measuring device.
The sash door opening to be no greater than 18" high at any given time.
Please respond in writing to Industrial Hygiene within one month as to action taken or planned in regard to these recommedations.
Equipment Used
The Alnor Model #8925 Thermo Anemometer, Serial #1326, was used to take face velocity measurements at specific grid locations.
Quality Assurance The Alnor Thermo Anemometer was calibrated by the manufacturer in February 1995. A recheck for zero condition was done before and after each use acording to manufacturers' recommendation.
Do A 044116 CONFrDFNTIal
RESTRICTED FOR USE WITHIN THE DOW CHEMICAL COMPANY
DRAFT
Attachment #1
LOUISIANA DIVISION INDUSTRIAL HYGIENE HOOP PERFORMANCE TESTING DATA
PLANT:
Chlorine Facility Block #2601
HOOD I.D.: #2601-A
DATE: February 24, 1995 NEXT DUE DATE: December 1995
Hood Face Velocity Readings at a(n) lf Sash Opening:
120 123 100 100 90 80 90 90 80 80 80
Smoke Tube Observations With a(n) 1 Sash Opening-
"***GOOD (Air capture by hood is strong and well defined with minimal internal turbulence and no observable smoke swirling back to hood face when person stands at hood face.)
Designation
#2601-A
Sash Opening
18"
FV (FPM)
94
FVm (FPM) Results: .
80 Met face velocity measurements needed for the service of operation.
Measurements were taken with an Alnor Model #8925 Thermo Anemometer.
FV = Average Face Velocity FVm = Minimum Measurement FPM = Feet P er Minute
EVALUATION PERFORMED BY: Darlene S. Creel
A 044 1 1 7 confident TAL
RESTRICTED FOR USE WITHIN THE DOW CHEMICAL COMPANY
DRAFT
Appendix "C" Quarterly Check of Flow Sensing Device
and
General Housekeeping
DO A 044118 CONFIDENTIAL
APPENDIX C
Quarterly Check Of Flow Measuring Device For Fume Hood And
General Housekeeping Of Fume Hood
This document is for the required check on the permanent, locally-mounted pressure or flow sensing device (manometer or equivalent). The static pressure reading (setpoint check) was established at the time of the Industrial Hygiene Evaluation and is indicated by a red line on die device. When the manometer deviates (deviation check) (+/-) 25% from the initial value (setpoint check), refer to Appendix D - Troubleshooting Guide. If the device is zeroed and static pressure is still out of the (+/-) 25% range, please call Industrial Hygiene as soon as possible.
Quarterly housekeeping should include the following inspection and cleaning of:
a. unnecessary items (sample bottles, tools, paper, etc.) b. slots and rear baffles inside hood (wipe off dust, dirt, grime, etc.) c. operation and condition of glass door (cracked)
Plant / Department :
Hood ID:
Listed below are the Dow MSMS code numbers for the Dwyer II, Model #25 and the red gauge oil. The manometer is used on chemical fume hoods to determine static pressure.
Dwyer II, Model #25 -- measures -0.5 to 3.0. (comes with a small bottle of oil)
Dow Code #6451006
Red Gauge oil, .826 Specific Gravity, 4 oz bottle 1 pint bottle
Dow Code #6451012 Dow Code #6451010
RETURN TO PLANT INDUSTRIAL HYGIENE CONTACT*
rev. IHD 1-31-95
D0 A 044119
CONFIDENTIAL
lit! Instructions for Dwver Mark II Molded Plastic Manometers
Filling!
Back out (turn counter clockwise) the zero adjust knob: then turn in approximately three full turns so that there is room for adjustment in either direction. Remove the fill plug, add fluid until it is visible in the vicinity of the zero on scale, then replace fill plug. Use Dwyer red oil only -- other fluids may damage the gauge. Caution: Use 0.826 specific gravity red gauge oil for Gauge #'s 25 and 27. If the unit is overfilled to the extent that there is insufficient zero adjustment to accommodate it, the excess oil can be removed by inserting a pipe cleaner through the fill port and blotting up the excess.
FluidXevel Check. Zero Check, and Preventive Maintenance: Check oil level occasionally and adjust for exact zero setting with zero knob. There are two methods used to adjust the zero. Whichever method was used initially, should be used each time the zero is adjusted. Method 1: Be sure all pressure is removed by disconnecting tubing at top of gauge
before adjusting zero knob. Method 2: If the tubing can not be disconnected from the gauge for adjusting the zero,
then tum hood off, close sash, and adjust zero. Slight fluctuation of the zero usually occurs with this method. Add oil only when necessary. Clean with a soft cloth using a little pure soap and water. Use of a small brush will aid in cleaning the knobs. Avoid cleaning fluids and liquid soaps that may have chlorinated solvents in them as they may damage the gauge.
Setpoint Check:
The static pressure reading (setpoint) was established at the time of the Industrial Hygiene Evaluation and indicated by a red line on the device.
Deviation Check:
When a continuous monitor device measuring velocity deviates (+/-) 25% from the initial value (setpoint), perform a fluid level check, zero check and preventive maintenance. Once the device is checked, and the static pressure is still out of (+/-) 25% range, please call Industrial Hygiene as soon as possible.
1/31/95 dsc
DO A 044120 CONFIDENTIAL
*
V.'LI.K LY CHE OK uF FLUE HUGO FLOW HEALURING
no j_ ZC T 4 \' '' . *L LL LAE j'"!'GLLF 'WILE l.i = } n'j'J1all LaF' L1NJLE
Hoo '1' 3 = 0.: .
north
Hl \ L* 1 = i.UAL1 LAr.' LOUTH
j.h: o '-Q
HOC*!.'
E 01 NT
;:ero
OH
OK OK
OK
FLUID LEVEL DEVIAT
0
0
OK 0 OK C
Jv
ir
r"
Ur.
V
. 00 Ur,
OK f;
DO A 044121 CONFIDENTIAL
I
30-01
3 4
1.5" . 95
. 05
OK
OK OK OK
OK OK OK OK
OK OK OK OK
OK
G 0 OK 0 OK 0
0 0 OK 0
OK 0
n\ !. 'ii
\ F'
OK.
OK
0K CK
;.Kt'
8-07-^:
o
d-i-i-y,:
- Ci
. 95
3.0" 2.7"
1 .5 1
r. 1
OK
OK
OK OK OK OK
OK
OK OK
OK
0 ,I
u
0
OK _ /I
OK
^ '
-- . J.
0
-.025' 3+. " OK 4.1"
'.'A L.'A
<'K OK u
OK '.J
CK .1J. 0
!';p; 0
+ .0:
ijjc OK rj r
DO A 0441^3
DONFrOENTlAl
11-09-92 -i. AI. - ^^ =>. ~ C-j1 I
1.5" . 925' 3.4" 2.8'
G\-l ^G %P-< '
g.4
1.5"
CK
OK
OK OK OK OK
OK OK OK OK
OK
)K
OK 0 OK 0
O
-.25" OK 0 OK 0
0 0
OK 0
OK 0
0
o . -Vr'i
.5 OK '-? * j
L/Ji
OK c;1 OK
OK
OK
i
0 0 0
0
OK 0 0
v-J\
00 A 044124 CONFIDENTIAL
OK OK 0 OK - 0 OK - +.05 OK OK 0 OK OK 0
DO A 044125 CONFIDENTIAL
s
borer IIruatnl lac. Material Safety Data Sheet
Bat* Praaared S-I2-B7
salt laa I (Material laaetlt Icat laal
Nava* Nad 6aaa Oil Haeufacturar* boyar lattrvoaet* lac.
P.D. Baa 17) Hlchloa* Cllr. ladlaaa 46)66
actlaa IV IFlra aad Eaeleala* Data)
, Floah Palati I41*F Hataadi ICC
LEI M/A I
r i.|. E*tlaalatila# Hadlai Brr Chaalcal. Faaa, CO7
i .<.ii Haiardava Bocaaaaallloa Product*! CO. C02. HF. CL?
baaclal Fir* Flatitlaa Pracadvraai Naaa Raaaa
Uauaal Fire aad E**le*la* Maiardi Naaa Raaaa
lactlaa V IHealth Hatard lafaraatleal
Paralaalbla Eaaaaura Laval (PEL I 300 PPM
(JCL. M/A 1
leloehaea* lfl 872-9141
Prlaarr Nautaa Of Eatrr Aad Eflacta Of Acuta Ovarataaaurai
Product Nvatari 71-440132-00
Hatard* Health 111 Fleooebllltr 111 beet la* 11 tHatardau* laaradlaata I
Cn
Naaetlvlty IBI IBI
*-------------------------------------.T-v. . .
'i
. a llt|a
CAB Muobor
'ft M # * . . Mata*
Boyar Nad Ba*a Oil
1 Allahatlc Patrol aw Blatlllat** 2 Salveat Raflead, Hydra!raatad.
Middle Blatlllato
2 Heavy Naohlhaalc Blatlllata
4 Polvaerlc 'Additive 1* Oil S Hlaar Additive* 6 Nad By*
M/A
64742-46-7
64742-32-3 HI* lure Hlalvra
M/A
12)
121
(21 (It 111 III
Hatao*
til Baaed aa data available 1* Boyar. thaaa caaaaaaata 1* this
araduct ara aat haierdau* uadar 0SH6 Haiard C
alcatlaa
(2* CFN 19)0.12001
12) KL 9BB PPM - NIOBH racoooaad* a Halt af IBB */
B hour llaa oelohted avaraaa.
12) Teaiclty data aat aaallabla far thee* caaaaaaata.
Era* * Caa cava* aavare Irrltattoa. radaaaa. taarla*. blurred
vlaloa,
Bfela - Praiaaaad ar raaeatad caatact caa cauaa aadarata Irrltatlaa.
. .< ,
dafattlaa. aad deraatltla.
at .... Braathlaa - Eacaaalva lahalallaa of vaeera caa cauaa aaaal aad
ttai i , .
raaalratarr Irrltatlaa, dliilaaaa. uoabaeoa, fatlava
, aauaaa. hoadacha. aaaalbla uacoaaclauaaaaa aad avea (
i aaahritatia*.
Baalleal at - Caa cauaa oaatralalaatlaal Irrltatlaa. aauaaa. vaaltlaa
aad diarrhea. Aaelratlaa af aatorlal lata the luet*
caa cauaa ehaalcal aaauaaalti* vhlch caa ba fatal.
Flrat Aldt
If Oa Bblat Haah atraced ara* alth aaaa aad aatar. Lauadar caataalaatad clathlao bafar* ra-va*.
If I* Eraai Fluah alth laroa aaauat* af uatar. llftla* uaaar . . aad iaaar lid*. Bat ttadlcal Attaatlea.
If Saalleeedi Da aat laduc* vealtla*. baaa aaraoa aara, oulat aad oat aadlcal attaatlaa. Aaelratlaa of aatarlala lata lu** due to vealtla* caa cauaa chaalcal aaouaealtl* vhlch caa b* fatal.
If Breathedi If affectad. raaava ladlvlduel I* fraah air. If braathlaa la difficult, odalalatar oaroaa. It braathlaa ha* ataaead olva artificial roaalratlaa. Baaa ear*** aara, aulat. aad oat aadlcal attaatlaa.
Beetlaa VI INeactlvItr Batal
The caaaaaaata af thla araduct are aat Hated alth HIP. IARC. ar Saetlaa 111 tPhyelcal Data)
Stability! Uaatahla ___ Stable _K_ Haaardov* PalrearItatlaai Mar Occur ___ . Mill Met Cccur _X_
Ceadltlaa* 1* Avoid* Naaa Reave lacaaaatlbllltv thalarlale to Avaldlt Btraa* Oaldlilro A*aet*
Balllaa Pelati Mat Avallatle Vaaar Preaauret Mat Available Vaaar Beaaltr lAlraltt Mat Available
elebllltr la Matan Naolldlbla
Baaclflc Nravltr <H10-lli .626 S Velatlla It Velma t Mot Available (vaaar at lav Nate I__________ ___ ______ lit Nat Available *Aaaaaraaca aad Odart Nad llauld altb allobt edar.
Sectlaa VII fBelli Or Leak Procedural
Btaea ta B* Take* la Caa* Material I* Nalaaaad Or Sallied* 111 Ellalaato all aaaalbla ioaltle* aavrea*-. 121 Saak a* eel11 alth abaerbaat aatarlal. ISaeduet. Varvlcullt*. ate.I
Uaata Blaaaaal Halhad* Dl****a af la accardaaca alth local. *tat* aad fadaral reouletlea*.
Nad Beoa Oil
Paoa I of 2
Nad 6aoa Oil Paoa 2 at 2
DO A 044127 CONFIDENTIAL
cl Ian VIII ISafa Haatlla* Aa4 Uaa Fracafuraal
fitiBlraltry Fralactlaai If aaatilatlaa la laafaaaata, uaa " raaalralar aaaraaa# far araaale alsta.
Vaatllatlaai fmlfi'liilflilMl aachaalcal (aaaaral ar lacal ' aahaatll aaatilatlaa.
in Fratactlaai taaalaa Fratactlaa Slaaaa. Waaaraaa Othar Fratactlwa Caalaaaati laaaralaaa clataiaa ar aaraa.
lactlaa IX (Saaclal Fracaotiaaal
j
Star a la Taatuallblaa Btaraaa Araa".
______________ l-------------------------------------------------------------------------------------------------
Mia lafaraallaa caatalaaf Harala la baaatf aa lha 4ata avallabla ta aa aa4
la ballaaaf <a ba rarract. Haaavar, Baaar aatea aa aarraatr. aaaraaaaf ar
laallaX raaarflaa lit acearacr af thla fata ar taa raaalla la aa abtaiaaf
fraa tha aaa taaraaf. Daaar aaaaaaa aa raaaaaaiaillta far lalura fraa taa
... .1 Ik.
....pi... ....|.
i
O oo
o Z50fk -f fk \> n 0
1 fata 1 af 3
Appendix "D"
Fume Hood Troubleshooting
Guide
APPENDIX D
Fume Hood Troubleshooting Guide
The following items arc to be inspected and/or repaired on the fume hood ventilation system listed below. Inspection of the fume hood can be performed by the block Electrician or Instrument personnel for Item #1. If Item #2 applies, the block Maintenance or Lab personnel can perform the inspection.
Date*_______ Inspected By:
Fume Hood I.D./Location:. Repaired By:____________
1. Perform motor inspections as needed:
a. Check motor temperature, amperage, ipm, vibration
_____
b. Lubricate motor bearings
_____
c. Inspect/check belts and sheaves for wear and alignment and condition of electrical connections and insulation
_____
Please add comments below concerning any problems, defects, or repair performed to the motor.
Perform fan assembly and fan suction/discharge inspections:
a. Inspect, check, clean fan assembly and check suction/discharge for dirt,
or corrosion, etc., condition of electrical connections and insulation,
wheel and blades for wear or buildup, belts and sheaves for wear
and alignment (Replace and/or adjust belts and sheaves as required)
_____
b. Check fan operation, rotation, vibration, noise, and/or air pulsation
_____
c. Lubricate fan bearings
_____
Please add comments below concerning any problems, defects, or repair performed to the fan.
2. If an oily or dusty operation is being performed in the hood on a continuous basis, the following should be performed:
Examples of oily or dusty operations: an oil bath is located inside the hood, drying or grinding slag, sifting powder substances for quality control, etc.,
a. Removal of baffle system to inspect for buildup (Powder, dirt, dust, oil, etc.)
_____
b. If excessive buildup has occurred behind baffle system, the discharge duct work must be inspected for possible buildup.
_____
Comments:
rev. IHD 2-4-94
Return To Plant Industrial Hygiene Contact*
DO A 044130 CONFTDFNTTAL
Appendix "E" Industrial Hygiene Sticker
for
Hood Evaluation
A 0441 31
C0NF10NTrAl
Appendix E
Industrial Hveiene Sticker For Hood Evaluation.
INDUSTRIAL HYGIENE HOOD EVALUATION
Hood Identification:.
Date Of Evaluations
Evaluator/Phone:__
Static Pressure:_____
Face Velocity @
Sash Opening
Classification
Chemicals Used Under Hood:
Smoke Observation: Good Classification:
A Carcinogenic or Highly Toxic Restrictions:____________________
Moderate
6 General Lab Use
Poor
Inadequate
* If static pressure readings vary 10% from setpoint, calibrate, zero and check device and/or exhaust system.
If modifications are made in hood operations or conditions, this hood should be rechecked. Please contact Industrial Hygiene at ext. 1883 or 2301. Dow Chemical Company Louisiana Division Plaquemine, Louisiana
Arrow Sticker Indicating Operating Sash Opening
DO A 04413? CONFIDENTIAL
Appendix Corporate Industrial Hygiene:
Guidelines and Resource Document for the Selection,
Use, and Maintenance of Chemical Laboratory Fume Hoods
CO A 044133
CONFIDENTIAL
GUIDELINES AND RESOURCE DOCUMENT
FOR THE SELECTION, USE AND MAINTENANCE OF CHEMICAL LABORATORY FUME HOODS
April 1992
The Dow Chemical Company Corporate Industrial Hygiene
Midland, Michigan
DO A 0A4134 CONFIDFNTTAL
SELECTION, USE AND MAINTENANCE OF CHEMICAL LABORATORY FUME HOODS
PREFACE
This document is meant for use by industrial hygienists, safety engineers, and laboratory environmental control or design engineers as a guide and tool for effective chemical fume hood system design and use. Section I consists of Guidelines for the Selection, Use and Maintenance of Chemical Laboratory Fume Hoods. These guidelines include the basic criteria for establishing a program to help ensure the proper use and performance of chemical fume hoods. Section II is a Resource Document which reviews and summarizes information and describes additional resources related to specific parameters of chemical fume hood design, use and evaluation. It provides a practical guide for meeting the conditions spelled out in the "Guidelines".
DO A 044135 CONFIDENTIAL
GUIDELINES AND RESOURCE DOCUMENT FOR THE
SELECTION, USE AND MAINTENANCE OF CHEMICAL LABORATORY FUME HOODS
J. P. Jurgiel, Corporate IndustrialHygiene, Midland, MI R. M. A. Hahne, Corporate Industrial Hygiene, Midland, MI D. T. Hitchings, Michigan Division R&D Operations, Midland, MI
THE DOW CHEMICAL COMPANY CORPORATE INDUSTRIAL HYGIENE
1803 BUILDING MIDLAND, MICHIGAN 48674
DO A 044136 C0NFTDFNTXAL
ACKNOWLEDGEMENTS
The authors acknowledge the following individuals who served as technical reviewers: D. L. Albert, Texas Operations Industrial Hygiene; R. W. Bohl, Corporate Industrial Hygiene, Midland; J. P. Cikalo, Dow Canada, Sarnia Division Industrial Hygiene and R. Thoulass, Dow Europe, Rheinmuenster Industrial Hygiene.
C
.(
DO A 044137 COMF1 DH NTT.AL
CONTENTS
PAGE
I. Industrial Hygiene Guidelines for the Selection, Use, and Maintenance of Chemical Laboratory Fume Hoocls..................................................................................................... 1
n. Resource Document for Chemical Laboratory
Fume Hoods.....................................................................................................4
Purpose of Fume Hoods and Conditions of Use.............................................5
Location, Installation and Operation............................................................... 7
Types and Designs of Fume Hoods...............................................................10
Fume Hood Exhaust System.........................................................................15
Variable Air Volume (VAV) Control Systems............................................ 22
Performance Criteria for Fume Hoods.......................................................... 23
Evaluation of Fume Hoods.......................................................................... 26
Maintenance of Chemical Fume Hood Systems........................................... 33
Appendix A: Criteria for the Determination of Recommended Fume Hood Face Velocities.......................................................................... 35
Appendix B: Regulatory Requirements, Voluntary Standards, and Other References.................................................................................... 38
Appendix C: Definitions.......................................................................................... 41
Appendix D: Model Hood Survey Data Form........................................................45
Appendix E: Model Fume Hood Survey Tag.......................................................... 46
C
DO ONF
A D44138 rDENTTAL
SECTION L GUIDELINES FOR THE SELECTION, USE AND MAINTENANCE OF CHEMICAL LABORATORY FUME HOODS
DO A 044139 1 confidential
GUIDELINES FOR THE SELECTION, USE
AND MAINTENANCE OF CHEMICAL LABORATORY FUME HOODS
A. An inventory and identification scheme should be prepared for all the fume hoods located in a given facility.
B. A standard procedure to review the industrial hygiene considerations of the design, purchase, installation, relocation, or modification of fume hoods should be established. The procedure should involve the industrial hygienist or industrial hygiene contact and include for review items such as location with respect to doors, traffic, makeup air availability, location of general ventilation inlets and outlets, type of hood, and nature of the materials to be handled in the hood.
C A performance standard should be established for fume hoods, based on accepted criteria arising from peer-reviewed empirical data. The standard shall not conflict with any existing Dow safety standards or regulatory standards.
D. Each new or existing fume hood should have a pressure drop or flow-measuring device to monitor hood performance. The device should be visible to the hood user and clearly marked to indicate the value observed at the time of the last survey. A procedure should be established for verifying and documenting that the hood performance has not degraded significantly since the last survey. Degradation of performance should lead to identification and correction of the problem and subsequent re-evaluation of the hood.
E. Each fume hood should have a tag or label which indicates the performance characteristics of die hood and the materials and equipment used in the hood at the time of the last survey. The hood face should be clearly marked and labeled if there is a maximum opening which the sash(es) should not exceed.
F. The face velocity of every fume hood should be periodically measured and evaluated for acceptability against the specified performance standards. Measurement should be at the time of installation, modification, or relocation, and subsequently
DO A 044140 CONFIDENTIAL
at least once every two years if there is no change in the configuration of the hood, i.e. no significant changes in the materials or equipment being used in the hood. The hood should be re-surveyed immediately if significant changes in the hood configuration or performance occur. G. Communication and training programs related to fume hood performance and use should be provided to employees involved in the use of fume hoods. Such programs should include: appropriate use of fume hoods; misuses of fume hoods; criteria for the acceptability of hood face velocities; problems associated with fume hood location; methods of monitoring fume hood performance; and regulatory requirements governing the use and operation of fume hoods. H. A routine maintenance program for fume hood systems should be established and included as part of the preventive maintenance program for the building in which they are located. I. Chemical laboratory fume hoods shall meet the requirements of Corporate Loss Prevention's Loss Prevention Principles, 12.5.4, Lab Hoods or Fume Hoods.
DO A 044141 CONFIDENTIAL
3
SECTION H RESOURCE DOCUMENT FOR FOR THE SELECTION, USE AND MAINTENANCE OF CHEMICAL LABORATORY FUME HOODS
00 A 044142 CONFIDENTIAL
4
RESOURCE DOCUMENT FOR THE SELECTION, USE
AND MAINTENANCE OF CHEMICAL LABORATORY FUME HOODS
A. Purpose of Fume Hoods and Conditions of Use
1. Introduction
This document is intended to review the critical issues which need to be considered in the installation, use, modification, and maintenance of various types of laboratory fume hoods and is of primary value to the industrial hygienist or industrial hygiene contact who needs to deal with such problems in detail. Although the installation or modification of fume hoods, exhaust systems, or other types of laboratory environmental systems should be under the supervision of an experienced laboratory environmental control engineer or consultant, this document may also be of value to building or design engineers involved in such activities. Purchase specifications of fume hoods are not dealt with in this document, since in most locations the manufacturers already use some standardized performance test to evaluate a particular hood design. The (U.S.) ASHRAE Standard 110-1985 (Appendix B, Reference 9a) is one possible standard against which the performance of the hood could be compared. Other possible standards are given in Appendix B, References 3 through 7.
2. Purpose of Fume Hoods
Chemical fume hoods (or fume cupboards, as they are more commonly identified in Europe) fall into the broad category of engineering controls. Their use in controlling exposures of employees to chemicals is preferable to the use of personal protective equipment.
Fume hoods are especially important for use in research laboratories in which the toxic properties of many of the materials being handled may not be well known. Fume hoods should be considered a second line of defense in the reduction of exposures to the materials being handled.
5
^D A 04414^.
Confiobnttal
Adequate experimental design, knowledge of the chemical, physical, and toxicological properties and appropriate training in material handling procedures should all be considered prior to running a new experiment or procedure.
A chemical fume hood should not be considered an appropriate means of disposing of unwanted volatile compounds by simply allowing them to evaporate in the hood and be carried away by the exhaust system.
3. Installation and Use
Fume hoods, like any other piece of equipment, should be installed and used with due consideration for their limitations. Industrial Hygiene review must be a part of any project which may involve the purchase, installation or modification of fume hoods and air handling systems, or other local ventilation. Fume hoods can be subject to improper installation or modification, as well as to malfunction. A critical element in any fume hood installation is the balancing of the air handling system with consideration for adequate makeup air and the overall heating, ventilation and air conditioning (HVAC) system's effects on hood performance. Thus, in order to ensure proper hood performance, a program of routine maintenance and evaluation must be established. Section G addresses these points in detail.
4. Changing Uses or Changing Conditions
Fume hood users must recognize that changing uses or changing conditions can significantly affect the performance of the hood. The introduction of additional equipment in the hood, use of different materials, modifications to the HVAC system in the laboratory or specifically to the fume hood blower or ductwork will all impact the performance of the fume hood. Thus, although a hood has been found to perform adequately for one set of conditions, it cannot be assumed that it will perform satisfactorily for all conditions. Sections B and G present specific details regarding these considerations.
6 D0 A 044144
confidential
B. Location, Installation and Operation
1. Location Considerations
The proper location of a fume hood is essential to maintaining the proper capture efficiency. The following points should be observed:
a) Keep fume hoods at least 3-6 feet (1-2 meters) away from sources of outside air disturbances, such as windows, doors, frequently used passageways, supply air outlets, etc. Any air currents exceeding 30-50% of the fume hood face velocity and impinging on the fume hood opening will cause loss of containment.
b) Do not place a fume hood adjacent to the only exit of a laboratory. In case of a fire or explosion in the fume hood, access to the exit may not be possible.
c) Ensure that the local Industrial Hygiene Contact or Industrial Hygienist reviews all proposed laboratory construction or renovation plans involving the installation, renovation, location and sizing of fume hoods and exhaust systems.
2. Installation and Operational Considerations
In addition to location, a number of other considerations should be considered during the design, installation, and operation phases. The following parameters should be reviewed during the planning stage:
a) Design the exhaust system (fan and motor) so that the face velocity will be 10 to 15% above the recommended face velocities derived from the formula in Appendix A. This additional face velocity should compensate for unexpected flow losses in the ductwork or fume hood.
b) Never plan to connect another fume hood to an existing exhaust system, unless the new system design parameters for entire system have been reviewed, ensuring that all fume hoods connected to the system can be operated with adequate face velocity.
D0 ft 0441A5
cSnfident1al
7
c) Mount exhaust fans outside the building to keep ductwork inside the building under negative pressure, thereby minimizing the potential for contaminants to leak from the ducts into the work area. This will also help reduce fan noise in the work area. Fans should be mounted in such a way to allow ease of inspection and maintenance.
d) Prepare a written maintenance and cleaning schedule for ductwork exhausting dusts and/or condensable vapors. Ductwork carrying condensable vapors should be sloped towards a suitable sump or drain with a downward slope of at least 1 inch/10 feet (0.8 cm/m) in the direction of the airflow.
e) Avoid the use of manually adjustable dampers and blast gates to prevent changing the air flow distribution.
f) Avoid placing exhaust duct outlets near building fresh air intakes. See Section D, 3.
g) Rain 'caps' (weather protection) can be used on exhaust duct outlets, but must not deflect or allow for the entrainment of the exhaust plume into the building intake air. Since rain caps can also increase the static pressure the exhaust system fans must overcome, they also decrease the exhaust volume. The preferred rain 'cap' configuration is a larger diameter annulus which is coaxial with the exhaust duct, as specified in Appendix B, Reference 18.
h) In order to achieve the desired performance, an adequate supply of makeup air must be provided to replace the volume exhausted through the fume hoods. Consultation with the engineers responsible for the laboratory or plant HVAC systems is advised on this matter.
i) Design sink drains in fume hoods to include traps which prevent gases and vapors from entering the work area through adjoining fume hood drains. Fume hood sink drains should have standing tubes in them or a "dam" in place around them to prevent unintentional spillage of liquids into the drain.
A 044 8
j) Specify chemically-resistant materials for the construction of fume hoods, ductwork, drains and exhaust systems.
k) Use fume hoods equipped with side and lower edge airfoils to minimize turbulence at the hood face. The lower air foil should generally be raised about 1.2 inches (3 cm) above the hood floor to allow for external cords, hoses, etc., to be passed into the hood, under the airfoil, without blocking the sash.
l) Equip all fume hoods with a continuous flow- or pressure-measuring device such as an inclined manometer or Magnehelic gauge in order to detect any change in hood performance. In some cases, an audible alarm may be desirable to alert lab personnel of significant changes in duct static pressure.
m) Specify a "dished" work surface with a 0.25 inch (6 mm) minimum lip around the entire hood floor. Make sure that the hood floor is level, since a sloped surface will severely reduce the liquid containment volume in case of a spill. Seal the counter top to the hood lining with silicone (or other chemicallyresistant) caulk to prevent spilled materials from leaking into inaccessible areas.
n) Mark a line 5 to 6 inches (12 to 15 cm) back from the front edge of the fume hood to remind users that all work should be performed behind this line.
o) Before any work is done in a newly-installed or modified hood, the local industrial hygienist or industrial hygiene contact should conduct a performance evaluation of the fume hood.
p) Maintain a fume hood inventory for each laboratory.
q) Schedule periodic performance evaluations for all fume hoods.
r) Schedule periodic maintenance inspections of the entire fume hood exhaust system. (See Section H)
DO A 044147 CONFIDENTIAL
9
C. Types and Designs of Fume Hoods
1. General Purpose Hoods
a) Conventional Bench-Type Hoods -- This is a boxtype enclosure with a moveable sash on the front side for adjusting the size of the opening. It is typically mounted on a laboratory bench or work table. Interior baffles at the rear and top of the hood, which usually can be adjusted, are designed to provide a uniform air flow across the hood face. The hood's performance depends largely on the position of the sash since the face velocity is inversely proportional to the sash opening area.
b) Variable Air Volume Hoods -- This is a conventional (or non-bypass) hood fitted with a face velocity control. As the sash is closed, the air volume drawn through the hood decreases to maintain a constant face velocity. This type of fume hood system is recommended from a safety and energy conservation standpoint. Refer to Section E for more information and cautions regarding this technology.
c) Bypass Hoods -- This hood is similar to the conventional hood except it is designed so that as the sash is dosed, a proportional fraction of the air volume is drawn through an opening in the hood structure (above the sash) instead of through the open face. The purpose of the bypass is to reduce large velocity fluctuations at the hood face by maintaining an open area when the sash is lowered. The bypass opening's area should be dependent only on the position of the sash. This type of hood is recommended for many applications.
d) Auxiliary Air Hoods -- This hood is similar to the conventional hood except that it supplies untempered air at the hood face as an energy saving feature. However, this auxiliary air may create uncomfortable conditions for the user, carry excessive humidity which might affect experiments, and cause excessive turbulence in the
10 DO A 044148 confidential
hood. The auxiliary air hood should be avoided in all new laboratory installations.
e) Portable Hoods -- As the name implies, portable hoods are readily moveable to different locations. There are two types of portable fume hoods: ductless and ducted. Ductless hoods may be appropriate for control of certain dusts or aerosols, but should not be used for control of vapors and gases as the small-scale filtration systems are typically inadequate for effectively trapping the contaminants. Consult with your industrial hygienist for specific applications.
Portable, ducted hoods which connect to existing exhaust systems are suitable for use if they meet appropriate design and performance criteria discussed later in this document. Never connect such hoods to the HVAC return air ductwork--only to a dedicated chemical exhaust system.
Special Purpose Hoods
a) Distillation and Walk-In Hoods -- Walk-in hoods are similar to the conventional hood except that they are usually larger and are floor-mounted rather than bench-mounted to accommodate larger equipment. A distillation hood is usually mounted on a low bench, ca. 18 inches (45 cm) high, under which equipment such as vacuum pumps, etc., can be kept. Walk-in hoods are mounted directly to the floor. Face velocity controls are recommended for these hoods because of the large air volumes required to operate them and because most have horizontal sashes which prevent the use of a bypass.
b) Perchloric Acid Hoods -- These hoods are similar to a conventional bench top hood except that materials of construction must be able to withstand a highly corrosive and oxidizing environment. All interior surfaces (including ductwork) should be made of inert materials such as stainless steel, ceramic coated steel, glass, or polyvinyl chloride (PVC). The bottom and sides should have continuous welded seams, and all right angles
11 DO A 044149
CONFIDENTIAL
should be coved to facilitate cleaning and eliminate deposition of perchlorates* The entire exhaust system including the stack, fan, ductwork and hood should have a wash-down feature, with a gutter and drain to capture and remove the wash water. (See Appendix B, Reference 18, Chapter 10, for additional design parameters.)
c) Radioisotope Hoods -- These hoods are similar to conventional hoods except that the bottom and sides should be coved. The interior surfaces should be made of a material which allows for easy cleaning and decontamination. The bottom should be constructed to support a number of lead bricks for shielding purposes. All air from radioisotope hoods should be filtered using a high efficiency particulate air (HEPA) filter.
d) Glove Boxes -- The glove box is a special case application required when dealing with highly toxic materials. Glove box requirements are beyond the scope of this document.
e) Biological Safety Cabinets (BSC) -- The BSC is a special case application required when dealing with biohazards. BSC requirements are beyond the scope of this document.
3. Hood Design and Construction
The following specifications apply to all types of hoods unless otherwise noted:
a) Perimeter of Opening
An airfoil should be provided at the base of the hood to reduce turbulence. The airfoil should have a 90 arc with a minimum radius of 1.5 inches (3.8 cm) and a 1.2 inch (3 cm) air gap between the airfoil and the hood base.
The side posts of the front face should also incorporate a similar airfoil, or at least have a 45 taper at the forward, inside edge of the post. Squared edges around the perimeter create
confiobnt^l
unwanted turbulence that can allow contaminants to escape from the hood.
b) Sash
The open face of the hood should be provided with a transparent, moveable sash that allows for closing of the entire face of the hood. The sash should be constructed of approved safety glass.
There are three standard types of sashes: vertical sliding, horizontal sliding, and a combination which includes horizontal sliding sashes within a vertical sliding sash. Face velocities of hoods with vertical sashes are easier to evaluate because the sash height is the only variable. Hoods with horizontal sashes afford the advantage of a smaller area opening for manipulating inside the hood, thus requiring a lower air flow rate.
The bottom edge of the vertical-sliding sash should be designed with an airfoil or a 45 tapered edge to reduce excessive eddy currents. No more than 5 pounds of force should be required to raise or lower the sash. The sash should be able to remain in place at any position. A sash enclosure may be provided at the top of the hood to receive the vertical sliding sash as it moves upward.
c) Work Surface and Walls
The work surface or floor of the hood should be seamless, level, and be recessed at least 0.25 inch (0.6 cm) to aid in containing spills.
All materials of construction for interior surfaces should comply with standards on combustibility. For example, in the United States, the construction materials must have a Flame Spread Index of 25 or less when tested using (U.S.) National Fire Protection Association (NFPA) #255, Standard Method of Test of Surface Burning Characteristics of Building Materials. The bypass opening on a bypass hood should be shielded by a slotted panel to impede flying debris and/or liquids in the event of a runaway reaction or explosion.
13
DO
A
044*51 I AD
d) Baffles
The rear and top interior of the hood should incorporate baffles with at least three adjustable slots across the entire width of the hood for achieving a uniform flow of air into the hood under a variety of use conditions. Optimum performance can be achieved through trial and error adjustments of the slots under normal use conditions. A good rule of thumb is to have one slot at the base of the back of the hood, one slot at the middle of the back, and one slot at the top of the back. Slot widths generally range from 1 to 2 inches (2.5 to 5 cm). At least two slots should remain open at all times.
e) Utilities
Controls for utilities serving the hood should be readily accessible, directly outside the hood. Each control should be clearly identified with a tamper proof label. If there is a water spigot inside the hood, the water should be directed to flow directly into a cup drain.
All valves and switches should meet relevant national standards, such as the (U.S.) American Society of Mechanical Engineers (ASME) standards, and (U.S.) National Electrical Code (NEC) requirements. Under no circumstances should permanent electrical switches or outlets be located inside the hood. All outlets should be of the ground fault circuit interrupter type. Panels which permit access to the utilities for maintenance purposes should be on the outside wall of the hood.
Light fixtures mounted outside the hood liner should be protected by a sealed, transparent, impact resistant vapor shield (Flame Spread Index of 25 or less). Access should be from the exterior of the hood. Light fixtures mounted inside the hood liner should be explosion proof and corrosion resistant. Access may be from the hood interior. Fluorescent lighting is preferred.
r
DO A 044152
14 CONFIDENTIAL
f) Noise
Moving the large quantities of air which are required in laboratories can cause excessive noise if proper noise attenuation techniques are not employed. Excessive noise or a significant increase in noise level in an existing system may indicate a problem and should be investigated. Dow corporate Program Requirements for Hearing Conservation and any relevant governmental noise regulations must be observed (Appendix B, Reference 10).
D. Fume Hood Exhaust System
1. Ductwork Systems
There are two major fume hood exhaust system designs to choose from: (a) individual systems consisting of one fan per fume hood and (b) manifolded systems with many fume hoods connected to a common exhaust system which may consist of more than one fan for redundancy and reliability. Each of these systems has advantages and disadvantages. Manifolded systems consisting of more than four hoods in the same general location generally cost less to install, operate, and maintain. However, the chemicals used in the fume hoods connected to this type of system must be carefully evaluated to minimize the risk of cross-reactions occurring in the exhaust system. For the most part, this is not a problem due to the low concentrations involved, coupled with the high dilution factors inside the manifolded systems. In large buildings with many hoods, the ideal exhaust system will probably be a combination of manifolded systems serving most of the fume hoods along with a few individual systems serving perchloric add hoods, biological safety cabinets, and radioisotope hoods.
a) System Design
Duct systems should take the shortest and most direct route possible. The number of bends, elbows and offsets should be minimized to reduce the static pressure losses in the system. Where needed, bends
ic ^0 A 0441 e;-5
15 C0^rDeNTiAL
and elbows should have a centerline radius of least twice the duct diameter (see Appendix B, Reference 18). Round ducts are preferred to rectangular ducts because of the lower static pressure loss and higher strength. Avoid the use of dampers, blast gates and baffles in the ductwork whenever possible. In order to assure a negative pressure in the portion of the exhaust system located inside the building, the exhaust fan should be located outside the building. This will insure that if there are any leaks in the system contamination cannot escape into the building.
Static pressure losses in the duct system are proportional to the square of the duct velocity. Therefore, duct velocities should be kept as near to the minimum velocity of 1000 ft/min (5.1 m/sec) as possible to minimize the static pressure losses of the system. Certain circumstances may exist which require higher minimum duct velocities, such as when it is necessary to maintain dusts or aerosols in suspension to prevent their deposition in the ductwork. In order to minimize condensation in the ductwork during cold weather, a backdraft damper should be installed when the system is shut down. Insulation of the ductwork should be considered in unheated ceiling spaces. Velocities above 2000 ft/min (10.2 m/sec) should be avoided due to the resulting high noise levels.
In situations where the duct velocity is insufficient to remove dusts or where condensation may form, the duct system should be designed to carry the additional load of the duct partially filled with the deposited material. Built-in spray down capabilities with wet collection systems may be needed in some instances to allow for routine cleaning during normal operation. Sloping ductwork which lead to drains in the direction of the airflow should be considered if condensation is expected to be a problem. All systems should be designed so that routine maintenance and cleaning can be accomplished quickly and thoroughly.
16 DO A 044154
CONFIDENTIAL
b) Duct Material
The ductwork is usually round in shape and can be fabricated from a number of materials. Flexible ductwork should not be used because of the high static pressure losses and leakage associated with this type of ductwork. The interior of the duct should be smooth and obstruction-free. The duct should be constructed of material which is non combustible and chemically resistant to the materials in the airstream of the duct. Combustible ducts, exhibiting a Flame Spread Index of 25 or less when tested in accordance with ASTM El62-87, Standard Method for Surface Flammability of Materials Using a Radiant Heat Energy Source, may be used if installed in accordance with approved standards and regulations. Protective coatings on the interior surface of the ductwork should be used with caution. Some common ductwork materials include galvanized carbon steel, stainless steel, glass fiber-reinforced plastic, and polyvinyl chloride (PVC).
c) Special Considerations
1) Perchloric Acid Hoods: Exhaust systems for perchloric acid fume hoods must not be connected into non-perchloric add fume hood exhausts. The entire hood, duct, fan and stack surfaces must be equipped with water washdown capabilities. The ductwork shall be stainless steel with smooth-welded seams and shall provide a positive drainage back into the hood. The hood and exhaust system must meet the requirements of the (U.S.) NFPA Standard 45, Fire Protection for Laboratories Using Chemicals (Appendix B, Reference 11a).
2) Radionuclide Hoods (hoods for use with radioactive materials): In the United States, fume hoods used with radioactive materials must be in accordance with regulations established by the (U.S.) Nuclear Regulatory Commission (NRC) (Appendix B, Reference 1). Similar regulatory agencies exist in many other countries, as well. Any maintenance activity or
17 D0 A 044155
CONFIDENTIAL
decommissioning of a fume hood must be in accordance with these guidelines or license requirements and should be reviewed by the Radiation Safety Officer (RSO). All hoods handling radioactive materials must be equipped with HEPA filters to capture radioactive particulates before exhausting to the atmosphere.
2. Fans
The driving force behind any fume hood and fume hood exhaust system is the exhaust fan. All fans in the United States should be certified by the Air Movement and Control Association (AMCA). In other locations, they should comply with local minimum requirements. Fans should be selected so that their performance is as near as possible to the point of optimum efficiency on the fan curve. The two main factors in matching a fan to a system are the flow rate and the static pressure. The fan should be selected to allow a 10 to 15% increase in flow rate. The calculated static pressure should account for all static pressure losses in the system, including the fume hood losses, duct entry losses, ductwork losses, fan entry losses, effluent cleaning device losses and stack losses.
There are two basic types of fans: axial fans and centrifugal fans. Axial fans should be avoided for contaminated airstreams because the belts, bearings, and in many cases, the motors, are located in the airstream. Axial fans are also very sensitive to changes in pressure which may lead to degradation in system performance. Types of centrifugal fans include airfoil, backward-inclined, radial, and forward-curved. The ideal fan for most fume hood exhaust applications is the backward-inclined centrifugal fan or the forwardcurved centrifugal fan. In clean-air environments (little dust, aerosols or other particulates which could clog a fan), the forward-curved operates at a lower RPM than the backward-inclined fan for the same flow rate. The backward-inclined centrifugal fan is more rugged than the forward-curved centrifugal fan. The forward-curved fan has a greater tendency to become loaded with dust, thus decreasing fan performance. Other factors to consider for fan selection include the
A 044156 confidential
composition of the fan itself. The fan should be constructed of material which is corrosion-resistant to the expected contaminants. Although belt-driven fans allow for more flexibility in the operating speed of the fan, they do require additional maintenance. Fan selection should be made by someone knowledgeable about fan characteristics such as a mechanical engineer.
The exhaust fan should be mounted so that it is isolated from the building structure to prevent transmission of the fan vibration back to the building.
The fan should be equipped with a drain at the lowest point to allow for condensation removal, if condensation is expected. There should be ready access to the fan for easy cleaning.
All fume hood fans should have spark-resistant construction. In the United States, AMCA Type "C" construction is the minimum requirement. Under certain conditions, more protective specifications such as AMCA Type "B" or AMCA Type "A" construction may be necessary.
Fans for use with perchloric acid hoods must be equipped with water washdown capabilities and must also be acid-resistant. The motor for the fan and any belts, which must be conductive, must be outside the ductwork.
Exhaust fans with mushroom-type caps are prohibited for use with laboratory fume hoods. They cannot be vibration isolated, are frequently excessively loud, and their exhaust outlet is too near die roof.
3. Discharge Stacks
Care should be taken to ensure that contaminated air discharged from fume hoods or other sources is not drawn back into the building through building air intakes or other openings. The turbulence around a building caused by the wind is complicated by the wind direction, local topography, and the presence of nearby structures. Appropriate location of exhaust stacks and air intakes may require dispersion modeling or other aerodynamic methods.
DO A 0441S7
19 "^rDENTIA,
Empirical research has determined the minimum exhaust stack heights that are required to prevent recirculation of contaminated air back into a building or into a nearby building- The following general recommendations are taken from a Dow Chemical USA, Michigan Division Engineering Practice and are applicable for the majority of cases where nearby structures do not exceed the height of the building in question, where the terrain is essentially flat, and where no unusual meteorological phenomena are common: 1) all laboratory fume hood exhaust systems require a stack at the outlet of each fan which should extend a minimum of 10 ft (3.3 m) above the tallest roof or air intake within a 1000 foot (328 m) radius, in order to avoid contamination of building air supply systems; 2) the stack is to be sized for 3000 feet per minute (10.2 m/sec) discharge velocity at nominal flow. For VAV systems, a minimum discharge velocity of 2000 feet per minute should be observed. Above 4000 feet per minute (20.3 m/sec), static pressure in the system becomes excessive. See Chapter 14 of the American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) Guide and Data Book for more information regarding exhaust stack design criteria (Appendix B, Reference 17).
A discharge stack should be supported 10 feet below the top with four guy wires attached to building structural steel or other rigid structure or else supported with a steel frame attached to the building structure. If the stack is short and wide enough, guy wires may not be needed. An engineer must be involved in stack design to ensure that the stack can withstand design wind loading in accord with applicable building codes.
Stack configuration should be the no-loss design, as outlined in the ACGIH Industrial Ventilation Manual. The exhaust stream should be directed straight up and all types of caps, e.g. rain caps, triangular caps, elbows, etc., should be avoided.
4. Effluent Cleaning
On occasion it may be necessary to remove a contaminant from the exhaust air before discharge to
20 DO A 044158 CONFIDENTIAL.
the atmosphere. If possible, the effluent from small processes should be scrubbed within the hood. For example, if a potential byproduct of a reaction was hydrogen cyanide (HCN), the discharge port from the reaction flask/vessel should have an alkaline scrubber to trap any HCN released from the vessel. If cleaning of the entire air stream from the hood is necessary, the following questions need to be answered:
a) What is the maximum allowable concentration (or maximum emission per unit time) of the contaminant in the exhausted air?
b) Will the introduction of an air cleaning system affect the flow characteristics of the hood system?
c) How will any waste material collected from the air stream be disposed of and what handling procedures will be required?
d) What routine maintenance will be necessary to assure that the system is working properly?
Effluent cleaning could entail either the removal of particulate matter, a gas or vapor. For particulate matter, filtration would be the method of choice, if the dust loading averages a few milligrams per cubic meter or less. Heavier loadings would require a dust collection device. Extremely small particles require a HEPA filter which removes particles with a diameter of 0.3 pm with at least 99.97% efficiency. The efficacy of a filter is often judged by noting the initial pressure drop across the filter and monitoring the change in pressure drop during the filter's lifetime. When the pressure drop increases by a predetermined fraction, the filter is replaced.
Certain radioactive effluents may require particulate removal with a HEPA filter before venting.
For removal of a gaseous contaminant from a fume hood exhaust, absorption, adsorption, combustion, condensation, or digestion are all possible options. Absorption involves passing the effluent through a scrubbing solution, spray device, or bed containing the absorbing material. Adsorption involves trapping the
DO A 044159 21 CONFIDENTIAL
material on a solid sorbent such as activated charcoal, silica gel, or a molecular sieve. Combustion involves passing the effluent through an oxygen-rich flame that could oxidize, and render harmless, the material of interest. Condensation entails passing the effluent through a cold trap which condenses out the material of interest. This can be done using a refrigerant, dry ice, or liquid nitrogen, depending on the nature of the material being trapped. Digestion or biofiltration is a relatively new technology which uses the catalytic and microbiological properties of soil to clean the airstream.
Details concerning the various measures needed for effluent cleaning can be found in the ACGIH Ventilation Manual (Appendix B, Reference 18).
E. Variable Air Volume (VAV) Control Systems
Fume hood face velocity controls are used to maintain a constant face velocity by varying the volume of air exhausted from a fume hood in relation to the sash position. Laboratories having fume hoods with face velocity controls are referred to as VAV laboratories.
Variable air volume (VAV) designs are being used with increasing frequency for many of the newest laboratory environmental control systems. Return on investment in a VAV system, due to energy savings, is possible within a year's time. Existing facilities retrofitted with variable air volume systems have shown net cost savings after three years or less.
The following considerations are critical in successful VAV designs:
VAV laboratory designs must meet the criteria of providing a comfortable working environment for researchers and other users.
The total environmental control system design must be well coordinated and integrated with the function of the existing building systems.
Effective maintenance training and monitoring procedures must be implemented.
D0 A 044160
22 confidential
In searching for energy savings, the environmental control system engineer and user should not forget all of the safety considerations that need to be implemented in laboratory design.
Maintaining a negative differential static pressure between the laboratory and adjoining spaces is required, for example, by the NFPA Standard Code No. 45 in order to prevent the migration of a fire or spill. In a constant volume laboratory this is difficult to do. In a VAV laboratory it is even more difficult to do unless the appropriate equipment, instruments and controls are employed corrertly. These techniques may require HVAC engineers to seek the assistance of a consultant or mechanical engineer experienced in VAV laboratory technology.
The actual control methods and technologies necessary for various types of VAV control systems are beyond the scope of this document.
F. Performance Criteria for Fume Hoods
It is necessary to have a readily measurable, objective means of determining if a chemical fume hood is performing acceptably.
There are several approaches for determining the acceptability of fume hood performance. In some cases, one approach or technique can be used to supplement another more complicated one for purposes of more frequent verification.
1. Quantitative Performance Assessment
a) Face Velocity Determination
The most widely accepted criterion for determining the acceptability of laboratory fume hoods' performance relates to the air velocity at the face of the fume hood (face velocity).
In the absence of any specific regulatory requirements, an acceptable average face velocity
for a fume hood can be determined using the Dowdeveloped formula and guidelines provided in Appendix A, Criteria for the Determination of Recommended Fume Hood Face Velocities. Using the formula found in these criteria, one can estimate an acceptable face velocity based upon four factors: the toxicity of the materials used in the fume hood, the potential for the generation of airborne material, the external air disturbances at the face of the hood, and the sources of turbulence within the hood.
Using this formula, optimal capture is attained with face velocities between 70 and 120 linear feet per minute and values below or above this range reduce the capture efficiency. Face velocities under 100 ft/min should only be used under nearly ideal conditions or when the materials being used are of low toxicity.
b) Tracer Gas Analysis
A performance evaluation of a fume hood may also be conducted using a tracer gas and measuring the capture efficiency, rather than using face velocity as a measure of adequate hood performance. Performance evaluation entails measuring the concentration of the actual material to be used in the hood or introducing a known concentration of a tracer representing that material (the tracer is a material that can be readily detected at low concentrations) at the face of the hood and then determining the concentration of the actual material or tracer at certain locations outside the hood.
Quantitative performance evaluations are normally done in a formalized, reproducible manner, so that measurements from different investigators are comparable. The hood capture efficiency is the parameter of interest in such an evaluation, and it is defined as the ratio of the concentration of the test material at the release point to the concentration of the test material at a point outside the fume hood, in what would be the normal breathing zone of the hood user.
D A 044
24 CONFIDENT
However, performance criteria based on capture efficiency are rarely used. In most cases this procedure is impractical because of its complexity and cost.
c) Uranine Dye Method
The U.S. Environmental Protection Agency (EPA) has developed a method to evaluate the ability of an auxiliary air fume hood to capture contaminants released inside the hood. This test is only required for evaluating the hood under conditions where exhaust and supply air volumes are equal, and not for evaluating a hood under normal operating conditions in which the volumes are different. The use of such hoods is strongly discouraged. For any locations that have such hoods and wish to do a quantitative evaluation of this aspect of the auxiliary air fume hood's performance, refer to Appendix B, Reference 16.
2. Continuous Flow Monitoring
Continuous flow monitoring constitutes measuring on a continuous basis some parameter directly related to hood performance. A continuous flow monitoring device is used to determine, on a real-time basis, if the hood is performing properly, or if its performance has changed. The lack of such a device necessitates more frequent checks of the face velocity. Several types of devices are available for such monitoring. One directly measures the air velocity at some location in the hood. This device is quite expensive in comparison to other devices, which measure the static pressure difference between the outside of the hood (essentially at the hood face and inside the exhaust duct.
Significant changes in pressure drop from that noted at the time the hood was evaluated are taken as an indication of malfunction.
A velocity or static pressure measuring device can also be connected to an alarm system, so that when the air velocity or pressure drop falls below some preset level, an audible alarm sounds. This eliminates the necessity
25 DO A 044163
CONFIDENTIAL.
of checking the monitoring device visually. However, if the device gives false alarms, people are sometimes known to shut it off, leaving the hood with no operational monitoring device.
3. Qualitative Performance Assessment
A qualitative method to observe the capture efficiency of a fume hood is to generate visible smoke and watch the air flow pattern. Smoke can be generated using smoke bombs, candles or smoke tubes. Smoke can also be used to observe dispersion patterns from the fume hood exhaust outlet, if there are concerns regarding the recapture of effluent by fresh air intakes.
G. Evaluation of Fume Hoods
This section describes the different ways of testing and evaluating the performance of fume hoods.
1. Face Velocity Measurements
The measurement of the air velocity at the face of the fume hood is the method of choice and most common means for quantitatively evaluating chemical fume hoods.
a) Air Velocity Measurement Devices
The most commonly used device for measuring the velocity of air at the face of a fume hood is a hot wire (thermal) anemometer. There are several types of hot-wire anemometers, including: (a) direct reading analog instruments such as the TSI 1650 Air Velocity Meter, (b) the miniature Kurz Series 490 Minianemometer, (c) the digital readout Alnor Model 8565 CompuFlow Thermoanemometer with averaging and printout capabilities, and (d) the digital readout Solomat MPM 500e with the Model 127 MS hotwire probe (which can perform time-averaging of air velocities over a time period of the user's choosing). Such devices, when appropriately calibrated, should give reliable velocity readings over a range of 10 to 3000 linear feet per minute. Calibration of the velocity measuring device should be done in a calibrated
26 00 A 044 1 (LA C0NrrDFNTlA(4
r
wind tunnel once a year, or in accordance with the manufacturer's recommendations.
Other devices for measuring face velocity include a pitot tube, rotating vane anemometer, swinging vane anemometer, and heated thermocouple. These devices are described in some detail in Appendix B, Reference 18.
b) Survey Procedures and Documentation
A Hood Survey Data Form (similar to that shown in Appendix D), can be used for reporting the key information about the hood characteristics and performance during a survey. Information similar to the following should be documented:
study file number building number date type of hood hood location sketch of hood sash configuration to be tested,
including dimensions of the opening presence of internal dampers presence of external baffles chemicals handled in the hood number of other hoods connected to this system sources of external air disturbances to this hood instrument used for the survey surveyor's name and signature
c) Face Velocity Measurement Procedures
1) With the hood blower off, measure the velocity of the air impinging at the face of the hood from external sources. If it exceeds 30 ft/min (0.015 m/sec), the situation must be corrected before making face velocity measurements. This step is very important and must not be overlooked. If flow disturbances caused by doors, windows, pedestrians, traffic, air supply diffusers or other sources are present, the hood face velocity measured may indicate adequate performance when the actual performance is unacceptable.
27
A 044 3 65 conftdfmx tal
2) A series of velocity measurements should be made across the face of the hood, at the center of a series of imaginary, equal-sized rectangles with dimensions in the range of 12 to 24 inches (30 to 60 cm) on a side. Air velocity measurements should be made in the plane defined by the sash in the dosed position. The face velocity should be measured at a minimum of six points, regardless of the open area of the hood face. The greater the variation in veloaty readings across the hood face, the greater the number of measurements that should be made.
3) Allow the air velodty meter to stabilize for at least 10 seconds at each measuring location. Record average values for each location.
4) Repeat these steps for each fan speed and sash opening to be tested.
5) If the face velocity does not meet the Dow performance criteria, then the sash height (or width), baffle position, damper in the exhaust duct (if present), or fan speed should be adjusted in order to meet the specifications.
6) If the ratio of the range of face velocity measurements to the mean face velodty exceeds 0.7, the hood performance must be improved, and then remeasured, prior to completing the survey.
d) Recording and Evaluation of Data
1) HOODLUM
Corporate Industrial Hygiene has prepared a computerized hood evaluation program under the name "Hoodlum", which simplifies and standardizes the evaluation of laboratory fume hoods. This program is written in an IBMcompatible BASIC language. The menu-driven program allows the surveyor to enter in data on the materials being used in the hood, the physical configuration of the hood and the air velocities measured for each sash height and fan
28 DO COA/p
speed tested. The program will calculate the average velocity, the maximum and minimum velocities, the variability of the velocity, and the recommended face velocity for the use(s) described. The use of HOODLUM encourages a standardization of fume hood reports and generates an output which can constitute the major portion of a fume hood evaluation report. Copies of the software for HOODLUM are available from Corporate Industrial Hygiene, 1803 Building, Midland, Michigan, U.S.A. HOODLUM may not be applicable if there are local Dow or regulatory requirements which differ from the Dow performance criteria.
2) Manual Calculations
If HOODLUM is not available, using the formula and guidelines in Appendix A, calculate the recommended face velocity for the chemicals being used. If the hood is to be used for a variety of compounds, make the calculations using the worst case scenario, i.e. assuming the most toxic and volatile compound that might be used in the hood. The standard Hood Survey Data Form (Appendix D) can be used for sketching a layout of the fume hood and reporting key information.
3) Recording Performance Data
A) Prepare and affix a fume hood survey tag (see Appendix E), to the hood for quick reference, indicating the correct hood fan speed and sash height for safe operation of the fume hood and the date of the survey.
B) Mark maximum sash heights on hood and/or install sash stops which allow for the safe operation of the fume hood.
2. Tracer Gas Analysis
Although rarely utilized, a performance evaluation of a fume hood may be conducted by using a tracer gas and measuring the capture efficiency. Typically a
00 A 044167
29 CONFIDENTIAL
human mannequin is placed in front of the hood and the concentration measurements are taken in the "breathing zone" of the mannequin. Some of the reasons for doing this include: 1) to determine the adequacy of the hood design and the resulting capture efficiency; 2) to determine if the configuration (i.e. the particular arrangement of equipment or apparatus in the hood) of the hood is such that it must be empirically determined if the hood can capture escaping vapors, dusts, or fumes; 3) to evaluate hood design or operational parameters, e.g. air foil design, face velocity, or relative positions of upper and lower hood baffles.
The contaminant historically used in tracer gas analysis is dichlorodifluoroethane (chlorofluorocarbon-12). A portable nondispersive infrared spectrophotometer is used to detect the gas. Concerns about atmospheric ozone depletion and recent cost increases in this compound have precipitated the use of another test material, sulfur hexafluoride (SFe). This material can be measured with a detector based on the electron capture principle used in many gas chromatographs. The American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) 110-1985 Performance Test (Appendix B, Reference 9a) specifies in detail how the quantitative evaluation using a tracer gas is to be performed.
A paper in the American Industrial Hygiene Association Journal gives an alternative method for determining hood capture efficiency while normal work activities are ongoing (Appendix B, Reference 19).
3. Continuous How Monitoring
a) Hot-Wire Anemometer
Continuous flow monitoring devices may be used to determine if the hood is performing properly, or if its performance has changed. A hot-wire anemometer can be used to directly measure the air velocity at some location in the hood. This device needs to be placed at a location where no particulate
30
CnMc-A 04416; CONFIDENTIAL
matter could interfere with the operation or damage the hot wire probe. One possible location is between the inner and outer walls of the hood which, in most fume hoods made in the United States, is open to the room air.
b) Static Pressure Gauges
Both Magnehelic gauges and inclined manometers are used to measure the static pressure differences between the outside of the hood (essentially at the hood face) and inside the exhaust duct. The Magnehelic gauges are slightly more expensive, but do not require the periodic maintenance needed for a manometer. With either device, significant changes in pressure drop from that noted at the time the hood was evaluated are taken as an indication of malfunction.
Any flow monitoring device must be checked periodically to ensure that the hood is working properly. For example, the low pressure side of a differential static pressure measuring device should be disconnected to check that the pressure reads zero and whether manometer fluid needs to be added.
c) Correlation of Data to Static Pressure Device
Measure the static pressure of the fume hood (when using an inclined manometer or Magnehelic gauge to indicate changes in performance) once the performance criteria have been met.
1) The static pressure gauge must be set to zero by disconnecting the low pressure tube and adjusting the zero knob.
2) Reconnect the low pressure tube to the static pressure gauge and determine the static pressure from the static pressure gauge at the different fan speeds with the sash fully open.
DO A 044169
31 confidential
3) Record the static pressure readings on the Hood Survey Data Form (Appendix D) for the different fan speeds.
4) Mark the static pressure for the normal hood parameters (if there are such) on the inclined manometer using a small adhesive arrow or line, for easy determination of pressure variability. Also include the fume hood static pressure on the Fume Hood Survey Tag.
4. Qualitative Performance Testing
The capture efficiency of a fume hood can be observed by watching the smoke pattern generated by the use of smoke bombs, candles, or smoke tubes. Smoke can be generated using either titanium tetrachloride (TiCLj) or stannic tetrachloride (SnCU), both of which are volatile and hydrolyze in the presence of atmospheric moisture to form titanium dioxide or stannic oxychloride smoke and hydrogen chloride. TiCU or SnCU on a cotton swab, or in a smoke tube, are ways of generating smoke for this purpose. Smoke tubes (e.g. Draeger and MSA) with other chemical formulations are also commercially available for such purposes. Smoke candles or bombs with varying burn times and smoke volumes are also commercially available. Typically, a thirty second smoke candle placed inside a hood should be adequate to evaluate the hood performance.
5. Frequency of Testing
a) Routine fume hood performance testing for each fume hood equipped with a manometer or other performance indicator should be at least once every two years if there is no drastic change in the chemicals or equipment being used in the hood. Hoods not equipped with such a device must be tested every six months. In some locations, regulatory requirements may necessitate more frequent testing.
Chapter 6 of (U.S.) NFPA 45, Fire Protection for Laboratories Using Chemicals, indicates that fume hoods should be checked in such a manner once a year, but makes an exception for programs that
32
provide an equivalent level of performance. It is felt that a well-run program such as that described above meets the NFPA 45 criteria and should suffice to assure the user that the hood is functioning adequately.
The (U.S.) Scientific Apparatus Makers Association (SAMA) also specifies in the (non-mandatory) Appendix C of their SAMA Standard LF10-1980 (Appendix B, Reference 15), that face velocity measurements be made at least annually, as part of the inspection and maintenance activities.
b) Fume hood performance testing should be performed before additional work is done in a fume hood when the static pressure deviates from the listed static pressure by more than 25%, when the fume hood is altered or damaged, or when the materials and/or equipment used in the fume hood are changed.
(Since the air flow through the hood is proportional to the square root of the static pressure, a 25% deviation in the static pressure entails a flow change of only about 12%.) If the continuous monitor measures velocity directly, then a deviation of 10% from the initial value should be cause for investigation and remediation.
Maintenance of Chemical Fume Hood Systems
In addition to doing routine evaluation of the fume hood's performance, the entire system should also be subject to a program of routine maintenance. The following list indicates those items which should be included in a routine maintenance program for fume hood systems (Appendix B, Reference 10c):
1. check and clean fan assembly 2. lubricate fan bearings per requirements 3. lubricate motor bearings per requirements 4. check belts and sheaves for wear and alignment 5. replace and adjust belts and sheaves as required 6. tighten all nuts and bolts 7. check motor mounts 8. check vibration isolators, pads, and springs
D0 A 044171
33 CONFIDENTIAL
9. check motor temperature, amperage, and revolutions per minute
10. inspect electrical connections and insulation 11. lubricate and adjust dampers and linkages 12. check fan rotation and operation 13. check fan wheel/blades for wear or buildup 14. check and clean strainers, traps, valves, and drains 15. inspect filter and shaft coolers 16. check fan and motor housings for wear or holes 17. check cutoff for proper spacing 18. check for undue fan vibration and/or air pulsation 19. check flex connections at fan suction and discharge for
holes or excessive wear 20. inspect horizontal ductwork for dust deposition or
condensation.
i
DO A 044172
34 CONFIDENT!AL
APPENDIX A: CRITERIA FOR THE DETERMINATION OF RECOMMENDED FUME HOOD FACE VELOCITIES
Vrec = 70 + A + B + C+ D (ft/min) or
Vrec - 0.35 + A'+ B' + C + D' (m/sec)
where Vrec and V'rec are the mean air velocities measured at the hood face.
A, A' = terms to compensate for materials requiring additional exposure control.
A = 0 ft/min (A' = 0 m/sec) for materials with an exposure guideline greater than 100 ppm.
A = 10 ft/min (A' = 0.05 m/sec) for materials with an exposure guideline of 10 to 100 ppm.demo
A = 20 ft/min (A' = 0.10 m/sec) for materials with an exposure guideline of 0.1 to 10 ppm.
Materials with an exposure guideline of less than 0.1 ppm should be evaluated on a case by case basis for the appropriateness of special handling procedures.
B, B' = terms to compensate for increased contaminant generation.
In general, materials with a boiling point greater than 100*C are considered to be of low volatility, while those with boiling points of 100*C or less are considered to be highly volatile.
B = 0 ft/min (B' = 0 m/sec) for materials of low volatility which are handled in closed systems.
B = 5 ft/min (B' = 0.025 m/sec) for materials of low volatility in an open system (significant evaporative surface); or highly volatile materials in a closed system that may be occasionally opened.
35 DO A 044173
CONFIDENTIAL
B = 10 ft/min (B' = 0.05 m/sec) for highly volatile materials handled in an open system which require frequent direct handling.
Special consideration must be given to high pressure or heated systems where significant volumes may be released.
C, C = terms to compensate for external conditions that can cause turbulence at the hood face.
C = 0 ft/min (C = 0 m/sec) for minimal outside disturbances expected to create less than 10 ft/min (0.05 m/sec) of external air flow at the hood face.
C= 5 ft/min (C* = 0.025 m/sec) for frequent outside disturbances expected to create 10 to 20 ft/min (0.05 to 0.10 m/sec) of external air flow at the hood face.
C= 10 ft/min (C = 0.05 m/sec) for frequent outside disturbances expected to create 20 to 30 ft/min (0.10 to 0.15 m/sec) of external air flow at the hood face.
External disturbances greater than 30 ft/min (0.015 m/sec) require corrective action prior to hood use.
D, D' = velocity terms to compensate for turbulence caused by internal conditions which result in poor air distribution.
This term takes into account the variability in hood face velocity as a result of internal conditions in the hood. The variability, calculated as the face velocity range divided by the mean face velocity, is used as a measure of balanced air distribution.
D = 0 ft/min (D' = 0 m/sec) for good air distribution: the ratio of face velocity range to the mean face velocity is less than 0.3
D = 5 ft/min (D' = 0.025 m/sec) for moderate air distribution: the ratio of face velocity range to the mean face velocity is 0.3 to 0.5
DO A 044174
36 CONFIDENTIAL
D = 10 ft/min (D' = 0.05 m/sec) for marginal air distribution: the ratio of face velocity to the mean face velocity is 0.5 to 0.7
For variability greater than 0.7, hood modifications and/or equipment rearrangements should be implemented.
DO A 044175 CONFIDENTIAL
37
APPENDIX B: REGULATORY REQUIREMENTS, VOLUNTARY STANDARDS, AND OTHER REFERENCES
REGULATORY REQUIREMENTS
1. U.S. Nuclear Regulatory Commission (NRC): Nuclear Regulatory Commission (NRC) Regulation Guide 8.21, 1979. Section 1.14.
2. U.S. Occupational Safety and Health Administration (OSHA): Safety and Health Standards: (a) 29 CFR 1910.252 {1 (c) (2), (3) & (4)} (b) 29 CFR 1910.1003 - 1016 (l (b) (11); (c) (l), (c) (4) (ii) & (d) (4) <i)] (c) 29 CFR 1910.1017 flK/)(l)&<2)} (d) 29 CFR 1910.1018 (H (g) (l) (i) & (ii)} (e) 29 CFR 1910.1025 {fl (e) (1) (i), (ii) k (e) (5) (i), (ii)} (f) 29 CFR 1910.1028 (II </> (1) (i) & (ii)} (g) 29 CFR 1910.1450 {1 (b); (e) (3); (I) (App. A) (C) (4), (E) (1) (n), (E) (3)
(c) & (E) (4) (c), (k)}
3. Australian Standard 2243.8 (1986); "Fume Cupboard" AS 3/86.
4. British Standard BS 7258, Laboratory Fume Cupboards, Parts 1, 2, 3 and BSI1990.
5. Dansk (Danish) Standard DS 457 "Stinkskabe: (October 1986).
6. German Standard: DIN 12923 and 12924; "Laborabzuege: (1991).
7. Norme Francaise NPX 15-203 and 206 "Sorbonnes"; (NF) (December 1987).
VOLUNTARY STANDARDS
8. American National Standards Institute (ANSI): (a) ANSI Standard Z9.2-1979, "Fundamentals Governing the Design and Operation of Local Exhaust Systems," American National Standards Institute (ANSI), Inc., New York, NY, 1979. (b) ANSI Standard Z9.5-1989, "Laboratory Ventilation," American National Standards Institute (ANSI), Inc., New York, NY, 1989.
DO A 044176 CONFIDENTIAL
38
9. American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE): (a) ASHRAE Standard 110-1985, Method of Testing Laboratory Fume Hoods, American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE), Atlanta, GA, 1985. (b) F. H. Fuller and A. W. Etchells, "The Rating of Laboratory Hood Performance," ASHRAE /., pp. 49-53 (1979). (c) K. J. Caplan and G. W. Knutson, "Laboratory Fume Hoods, A Performance Test," RP 70 ASHRAE Trans., 84, a) (1978).
10. Dow Chemical Standards (a) Dow Chemical U.S.A., HEH2.16-1-K1): Development of Improved Laboratory Fume Hood Performance Criteria, R. W. Bohl, et al, 1984 (b) The Dow Chemical Company Loss Prevention Principles, Section 12.5.4, "Laboratory Hoods or Fume Hoods" (1991). (c) Dow Chemical U.S.A., Texas Operations; Safety Reference No. 7, "Laboratory Exhaust Hoods". (d) Dow Europe; Guidance Note for Industrial Hygiene Functions: "Assessment of Local Exhaust Capture Hoods". (e) Dow Chemical U.S.A., Eastern Division; Safety Reference No. 9. (f) Dow Chemical U.S.A., Michigan Division, Engineering Standards and Practices: Design Aid M5B-5072-00 (1990).
11. National Fire Protection Association (NFPA): (a) NFPA Standard Code No. 45, Fire Protection for Laboratories Using Chemicals, National Fire Protection Association (NFPA), Quincy, MA, 1986. Chapter 6; "Laboratory Ventilating Systems and Hood Requirements.
12. National Institute of Health (NIH): NIH Guidelines for the Laboratory Use of Chemical Carcinogens, National Institute of Health (NIH) Publication 81-2385, May, 1981.
13. National Institute of Occupational Safety and Health (NIOSH): Recommended Industrial Ventilation Guidelines, U.S. Dept, of Health, Education and Welfare, HEW Pub. No. 76-162, NIOSH Contract No. CDC-99-74-33, prepared by Arthur D. Little, Inc., Cambridge, MA, GPO1976-657/5543, January, 1976.
14. National Sanitation Foundation (NSF): NSF Standard No. 49, National Sanitation Foundation Standard for Class II (Laminar Flow) Biohazard Cabinetry, NSF No. 49, National Sanitation Foundation (NSF), Ann Arbor, MI, 1987.
DO A 044177
39 CONFIDENTIAL
15. Scientific Apparatus Makers Association (SAMA): SAMA Standard LF 10-1980, "Laboratory Fume Hoods," Scientific Apparatus Makers Association, Washington, D.C., 1980.
16. U.S. Environmental Protection Agency (EPA): Laboratory Fume Hood Standards as recommended for the U.S. EPA dated January 15,1978, Contract No. 68-01-4661.
17. ASHRAE Guide and Data Book, American Society of Heating, Refrigeration, and Air Conditioning Engineers, 1989.
OTHER REFERENCE MATERIAL
18. American Conference of Governmental Industrial Hygienists (ACGIH): (a) Industrial Ventilation - A Manual of Recommended Practice, 21st Ed., Committee on Industrial Ventilation, American Conference of Governmental Industrial Hygienists (ACGIH), Cincinnati, OH, 1992. Chapter 3: Local Exhaust Hoods; Chapter 4: Air Cleaning Devices; Chapter 5: Exhaust System Design Procedure; Chapter 6: Fans; Chapter 8: Construction Guidelines for Local Exhaust Systems; Chapter 9: Testing of Ventilation Systems; Chapter 10: Specific Operations
19. A New Method for Quantitative, In-Use Testing of Laboratory Fume Hoods, R. E. Ivany, M. W. First, and L. J. Deberardinis, A.IJ1.A. Journal, 50 (5), 275-280 (1989).
20. National Research Council, Prudent Practices for Handling Hazardous Chemicals in Laboratories. National Academy Press, Washington, D.C., 1981. Chapter I, Section H: Laboratory Ventilation.
21. Safe Laboratories: Principles and Practices for Design and Remodeling. P. C. Ashbrook and M. M. Renfrew, Eds., Lewis Publishers, Inc., Chelsea, Michigan, 1991. Chapter 6: Basic Principles of Ventilation in Chemical Laboratories; Chapter 9: Ventilation, A Consultant's Perspective; Chapter 10: Basic Principles of Fume Hood Design and Operation; Chapter 11: Common Ventilation and Fume Hood Problems; Chapter 12; Basic Concepts for Improving Ventilation During Major Remodeling Projects.
22. CRC Handbook of Laboratory Safety, Third Edition, A. K. Furr, Ed-, CRC Press, Inc., Boca Raton, Florida, 1991.
DO A 044178
40 CONFTDFNTTAL
APPENDIX C: DEFINITIONS
ACGIH: American Conference of Governmental Industrial Hygienists.
AIHA: American Industrial Hygiene Association.
Air Foil: A curved or angular member at the fume hood face.
Air Intake: An air inlet which draws fresh air in from the outside of the building and circulates it through a ventilation system.
AMCA: Air Movement and Control Association.
Anemometer: Any device used to measure the velocity of air. Common types include the rotating vane, swinging vane and thermo: anemometer (hot: wire anemometer).
ANSI: American National Standards Institute.
ASHRAE: American Society of Heating, Refrigerating, and Air: conditioning Engineers.
ASME: American Society of Mechanical Engineers.
Balanced Branch Ventilation System: A local exhaust ventilation system designed by selecting duct size for generating adequate static pressure to distribute air flow without the use of dampers (blast gates). The balanced branch system is less prone to tampering and plugging than the blast gate system.
Blast Gate Ventilation System: A local exhaust ventilation system designed with blast gates (dampers) for controlling air flow through the system. This system is prone to tampering by workers and to plugging. It is not recommended for use.
By pass Hood: An enclosed fume hood designed so that as the sash is closed, air flow is maintained through the air foil.
California Style Hood: A benchtop fume hood with horizontal sliding sashes on both sides of the hood.
Capture Velocity: The velocity of air necessary to capture the contaminant(s) of interest, typically by use of local ventilation; the higher the release velocity of the contaminant, the higher the required capture velocity.
DO A 044179
41 CONFIDENTIAL
Conventional Hood: A basic enclosed fume hood which has interior baffles at the rear and top of the hood which are used to evenly distribute air flow.
Damper: A gate or valve within a duct which controls air flow.
EPA: U.S. Environmental Protection Agency.
Face Velocity: The air velocity in the theoretical plane defined by the front of the hood, usually in the same plane as the sash (see below).
Flow Rate: The rate at which a blower is exhausting air through the hood or local ventilation system, expressed in volume/time (cfm or m3/sec).
Glove Box Hood: An enclosed fume hood with protective gloves built into one side of the hood for access.
HEPA Filter: High Efficiency Particulate Air filter. A HEPA filter collects 99.7% of all particles of 0.3 microns in diameter or greater.
Hood Configuration: A particular combination of sash height, fan speed, equipment or other items in the hood, materials (and amounts) being used, and static pressure drop across the hood which define a specific set of performance characteristics
HVAC: Heating, Ventilation and Air Conditioning system. The HVAC system is designed to temper fresh and recirculated air within a building for comfort, safety and health.
Magnehelic Gauge: A device which measures the static pressure differential across a barrier (i.e., the difference between the static pressure inside the fume hood and the outside atmosphere).
Makeup Air: That air which must replenish the air being removed by a fume hood or local ventilation system; lack of adequate makeup air will reduce the effectiveness of a fume hood or local ventilation
Manometer: A device which measures the pressure differential across an enclosure and the open atmosphere.
Minimum Duct Velocity: The minimum velocity in the duct which will adequately transport contaminants (i.e., particles, vapors, mists, etc.) in order to prevent plugging or damage to the duct (i.e., corrosion).
D0 A 0A4180
42 CONFIDENTIAL
Negative Pressure: Pressure differential such that the pressure inside an enclosure is less than the atmospheric pressure. Air moves inside the enclosure.
NFPA: National Fire Protection Association.
NRC: U.S. Nuclear Regulatory Commission.
OSHA: U.S. Occupational Safety and Health Administration.
Performance: In reference to a fume hood, the extent to which the hood accomplishes its task of quantitatively removing the vapor or particulate matter released by a source located within it.
Permissible Exposure Limit (PEL): The employee exposure limit to chemicals established by OSHA.
Positive Pressure: Pressure differential such that the pressure inside an enclosure is greater than the atmospheric pressure. Air moves out of the enclosure.
Sash: A movable (but occasionally fixed) transparent panel, which can move vertically or horizontally, or sometimes in both directions, which is used to open or close the one open side of a fume hood.
Sash Height: The position of a vertically: movable fume hood sash.
Static Pressure: The pressure attributed to air confined within an enclosure which exerts pressure perpendicularly to the walls of the enclosure. The sum of static pressure and velocity pressure is equal to the total pressure.
Thermoanemometer: An anemometer which utilizes the change in resistance in electrically: conductive probe as a function of the air passing over the probe to determine air velocity.
Threshold Limit Value (TLV): The recommended employee exposure limit to chemicals established by ACGIH.
Total Pressure: The pressure exerted in a duct as the sum of the static pressure and the velocity pressure.
Turbulent Flow: Air movement which is not uniform; turbulence reduces hood capture efficiency.
DO A 044181
43 CONFIDENTIAL
Velocity Meter (velometer): A device which measures air velocity. Velocity Pressure: The pressure attributed to the velocity of air.
oo * 0447ftD :nttAl
44
APPENDIX D: MODEL HOOD SURVEY DATA FORM
HOOD SURVEY DATA
RECOMMENDED MEAN FACE VELOCITY FOR THIS HOODF.P.M.. 000ft OPEN____________________ ________________--IN. ftECOMteeED EXHAUST RATE FOR THIS HOODC.F.M.
HOOD CONDITIONS DURING THE SURVEY
MAXIMUM
MINIMUM
MCA*
ACTUAL FACE VELOCITIES MOOD FACE AREA DURING SURVEY EXHAUST HATE DURING SURVEY UAXUUMOPEMMSs HEIGHT
_ IN.. WIDTH
F.FAL
F.PJA.
n ft
C.F.M.
IN. MAXIMUM MOOD FACE ABEA
FJiJL
MSTINMCMT USCD FOft AM VfLOCTTY MCASUMMOftl
SCVIAL NUMCC
KAIUKCE sa FT.
DO A 044183
CONFIDENTIAL
45
APPENDIX E: MODEL FUME HOOD SURVEY TAG
INDUSTRIAL HYGIENE HOOD SURVEY HOOD IDENTIFICATION________________________________ DATE OF SURVEY_____________________________________ SURVEYOR___________________________________________ STATIC PRESSURES':
LOW SPEED: INCHES WATER HIGH SPEED: INCHES WATER FACE VELOCITIES, FPM @ SASH OPENINGS, INCHES:
& CHEMICAL USED IN EVALUATING HOOD RESTRICTIONS:
'NOTE: IF STATIC PRESSURE READINGS VARY 25% FROM THOSE MEASURED, THE EXHAUST SYSTEM SHOULD BE CHECKED.
M-70355 R-7-S9 vhv
DO a
DO/VFj d 44l84 NTTAL
46
Appendix "G" MSMS Welding Sign Illustration
/
c&?t4&8
PART NO.: DOW027 SIZE: 10" x 14" MATERIAL: Accu-Shield
RECOMMENDED PRODUCT USAGE Use at all unlevel floor areas where tripping hazards exist.
Dow Code: #2790825
14'
WATCH YOUR HEAD...
WATCH YOUR STEP
PART NO.: DOW015 SIZE: 10" x 14" MATERIAL: Accu-Shield
RECOMMENDED PRODUCT USAGE General information sign used to warn of low pipes, racks or overhead beams. Place wherever tripping hazards exist
Dow Code: #2790826
10"
CAUTION
WORK OVERHEAD
PART NO.: DOW022 SIZE: 7" x 10" MATERIAL; Accu-Shield
RECOMMENDED PRODUCT USAGE Use to temporarily identify overhead work areas where falling objects may be a hazard.
Dow Code: #2790827
14"
10"
Welding may prodjca fum and gtaaa hncrdoua to haalth. Avoid braathtag that* fum* and qmm. Uaa adaquata
vantllatba ANSIZ4*.1-1W7 Safaty to Waiding and Cutting. pubHahad
by tha American WaldRig Soclaty.
PART NO.: DOW4003 SIZE: 10" x 14" MATERIAL: Accu-Shield
RECOMMENDED PRODUCT USAGE
All areas which contain gas cylinders, calcium carbide, and materials which may release toxic fumes and gases during use must be posted with adequate warnings.
(Refer to OSHA standard 29CFR1910.252)
Dow Code: #2790862
DO A 044186 CONFIDENTIAL
14"
CAUTION
CONTAINS FLUORIDES
TW* flu* wtari tafttod gto* off turn** that mv krIM* *yM, no#*, d VtroA
1. Avoid tmm -* tay h *t vwtaftd ipfe*
LAwM niaiiUBiWuyik 1, to m( ak* Mamafty
PART NO.: DOW4004 SIZE: 10" x 14" MATERIAL: Accu-Shield
RECOMMENDED PRODUCT USAGE
All areas which contain gas cylinders, calcium carbide, and materials which may release toxic fumes and gases during use must be posted with adequate warnings.
(Refer to OSHA standard 29CFR1910.252)
Dow Code: #2790863
14"
WARNING
HEAT RAYS
Infrarad Radiation from Flam* orHotMotal. WoarCorroct
Eya, Ear, and Body Protection.
PART NO.: DOW4005 SIZE: 10" x 14" MATERIAL: Accu-Shield
RECOMMENDED PRODUCT USAGE All areas in which Welding is present shall be posted with adequate warnings against related hazards.
(Refer to OSHA standard 29CFR1910.252)
Dow Code: #2790864
14"
Arc Rays Can Injure Eyes and Burn Skin. Wear Correct Eye, Ear, and Body Protection.
PART NO.: DOW4006 SIZE: 10" x 14" MATERIAL: Accu-Shield
RECOMMENDED PRODUCT USAGE All areas in which Welding is present shall be posted with adequate warnings against related hazards.
(Refer to OSHA Standard 29CFR1910.252)
Dow Code: #2790865
mnm
CONTAINS CADMIUM . POISONOUS FUMES MAY BE FORMED ON HEATHG
Done!Mt>tan Dmrtyefttatakfdillita tvdi m turn ealedan, adiwd vntlian, or *
fcAN$Ztti-m IdtaptaMtfktflaw
*****m cddrtarbmidita
PART NO.: DOW4007 SIZE: 10" x 14" MATERIAL: Accu-Shield
RECOMMENDED PRODUCT USAGE
All areas which contain gas cylinders, calcium carbide, and materials which may release toxic fumes and gases during use must be posted with adequate warnings.
(Refer to OSHA standard 29CFR1910.252)
Dow Code: #2790866 D0 A 044187
confidential
c
Appendix "H" Calculation Sheet
for
Number of Fans
for
Confined Space Entry
c
DO A 044188 CONFIDENTIAL
Calculation For Adequate Ventilation For Welding In A Confined Space
According to the welding standard 29 CFR 1910.252-257, welding in a confined space requires a minimum of 2,000 ft3/minute/welder.
Fans from Tool Room
6" Air Mover 10" Air Mover
36" Box Fan 36" Box Fan 20" Copus Blower
Air Pressure (psig) 70 81
High setting Low setting
80
Air Flow (CFM) 3150 5560 10,300 6810 11,000
10 volume changes / hour required according S&LP: Volume of vessel = 132,935 ft3 10 X 132,935 ft3 = 1,329,350 ft3/hr
How many Copus type blowers needed for 10 changes/hour?
1.329.350 ft3/hr
= 2 coppus blowers
11,000 CFM/blower x 60 min/hour
The minimum rate/minute/welder = 2,000 CFM
How many welders can be working with 2 Copus Blowers?
Q. 2 x 11.000 CFM
- 11 welders
2,000 CFM/welder
To handle 17 welders: # Copus Blowers =
To handle 19 welders:
17 x 2.000 CFM 11,000 CFM
34.000 11.000
- 3.09
# Copus Blowers
19 x 2.000 CFM 11,000 CFM
88.000 11,000
3.45
You would need 4 Copus blowers for 20 or more welders.
BH/MRM 9/22/92
SECTION 11: HEAT STRESS PROGRAM
Environmental conditions, work demands, and clothing requirements may increase body temperature and cause heat stress. Heat stress can diminish employee's work performance and adversely affect their health and safety. The normal response to heat stress is sweating, an elevated body temperature, and an increased heart rate. These responses mean that the employee is at an increased risk for a heat illness, fatigue, an accident, or an error in judgment. Employee well-being and an increase in productivity can be achieved through a program which manages heat stress.
A satisfactory program includes prevention of heat stress through education and training. The training program should emphasize: 1) recognizing the signs and symptoms of heat illness, 2) stressing the need for adequate water intake, 3) replacing the lost salt by maintaining the correct electrolyte balance through proper nutrition, and 4) pre-job planning.
Methods for controlling heat stress may include: 1) adjusting the movement of air, such as floor fans or a portable air conditioner(man-cooler), 2) retreating to an air-conditioned room, 3) providing cooling vests for use with chemical protective clothing, or 4) adjusting the work/rest schedule to accommodate the amount and type of work being performed.
The Heat Stress Prevention Guidelines (developed by the Texas Operations Thermal Stress Prevention Team) provides additional information on: the heat illnesses (heat rash, muscle cramps, exhaustion, and stroke), adjusting the work/rest schedule, acclimatization, employee heat stress evaluation, recommendations for supervisors, and methods for control.
This section contains the following documents:
1. Heat Stress Program Guidelines The Heat Stress Prevention Guidelines details the minimum requirements for an acceptable heat stress program within Louisiana Division.
2. Heat Index Table and Overhead Transparency This table provides the apparent temperature the body feels from the combined effects of humidity and temperature.
3. Resources for Heat Stress Prevention Training This section contains a list of some of the resources for training on heat stress which are available through the LAD Safety and Industrial Hygiene Departments.
10-26-92
11.1
DO A 044190 CONFIDENTIAL