A visit to the Puget Sound Plant on Jane 29-30, 1978, was made in order
to furthar evaluate air sampling data collected for beaeene exposures and to con
duct a walk-through industrial hygiene.survey of the plant. Accompanied by Mr.
Jack Drummond, Safety Supervisor, Mr..J. D. Watts of the Houston Industrial Hygiene
Group conducted the andit and general survey.
. ..
Tha following recosmendationsjeere .made to.the Paget Sound management
In connection with the valk-through .survey:
. . .. ......................
(1} It was recommended that an exposed asbestos nicking material ha covered With some suitable..metal lagging on the pipe rack Inside the 12 coMiag tower cljeaical abed. . ..
(2) It is a good safety practice (1910,107 (e) (9)) to follow in that
all liquid transfers frofe a metal drum to a metal container have
the drum or barrel properly grounded if the flash point of the
liquid is below 100?. Therefore, It was recommended that a drum
of flammable paint thinner he.grounded at the.paint shop and like
wise on a drum of propylene dichloride (flash point 60F) at the
#2 CBU.
,.
(3) It was recommended that a carbon monoxide alarm system be investi
gated for the compressed air system used by the sandblasters near
the paint shop area; reference OSHA 1910.134 (d) (ii). A cost-'
versus-benefit approach was recommended on installing the above
or using bottled breathing air.
.
(4) A noise source was found..to be associated with the use of the
polnt-of-source exhausters in the welding shop. The noise source
seems to be the fan noise which travels down the various ducts to
the employe work area and. therefore, the exhausters have a less
frequent use. It was recommended that this area be further in
vestigated by the plant.v Furthermore, please contact Mr. James
Stackhouse with Beacon R..& T if any additional control measures are
needed.
,,.
(5) The tool rest on the grinder in the welding shop should be reset to the proper distance, reference OSHA 1910.215 (4).
WA-TEX 000004
O INSTRUCTIONS--CANCELS LBTTERCS) OF.
Mr. ?> C. T*plt<m PERMANENT
Q ROUTINE
P*gO 2
..
-SIGNED BY. TEMPORARY
Form M18B C9-76)
(6) In association with a previous industrial hygiene survey report
(reference R. t. Richard* to J. M. Ssadu|ns, August, 1976), It was
raeoamended that a material safety data ..sheet on Turco Cleaner
(corrosive) be obtained end eye wash facilities located in the
proximity of utilisation,. ..
.
.
(7) It was recommended that the wording "chlorine gas mash" should..
he stenciled on the yellow box at the affluent plant"for better
visibility. .
._
.
__
(8) Due to the use of e number of chlorine cylinders at the effluent
plant, a chlorine gai mash station Is located at the fire .house,
this location is predominantly downwind from the chlorine cylinders. .
Therefore, it was recommended..that the mask station be relocated
or an emergency action plan implemented. . .
.
(9) With regard to future sit sampling for benaene, it was .recommended
that ceiling limit (fifteen minute samples) determinations ba made
during tape gauging and sample collection aboard marine vessels at
the dock (also,barge loading), further sampling was also advised at
the following locations s(a) .truck loading rack-calling limit
samples, (b) laboratory n technician duties, AK room, and bottle
wash room.
_.
(10) A preliminary ventilation survey of the laboratory showed several hoods to be below the acceptable standards for adequate face (capture) velocity. For most petroleum laboratories, - a minimum face velocity of 100-125 feet per minute is recommended; however, more toxic sub stances require a higher^rate. If any further assistance is needed in this area, please consult the Health Division.
In summary, the general audit.jud walk-through survey indicated that .an effective safety and health program was being practiced. 1 wish to thank the Puget Sound management, especially Messrs. Drummond, Templeton, and Long for their hospitality and cooperation during the visit.
JDW/rab x cc: KTR1*'
,BE0*H
J. D. Watts
WA-TEX 000005 ~. >