Document gDO7DDK7x2xRNrmv3677zxGae
1 90-deg long turn elbow._ 1 open return bend.. 1 open gate valve.. 1 open globe valve....--. 1 angle radiator valve.. 1 radiator.. 1. boiler or heater.. 1 tee ...............................................................................................:--.................................(Note*>)
#The loss of head in one elbow can be expressed in terms of the velocity head by the formula:
the loss of head in feet, v = the velocity of approach in feet per second, and 2g = 64.4 ft per second per second.
bThe loss of head in tees when water is diverted at right angles through a branch of the tee varies with the per cent diverted. When the water diverted is less than 60 per cent of that approaching the tee, the loss of head, in elbow equivalents, may be expressed as follows:
where
*^
he = the loss of head in elbow equivalents, n -- the velocity of approach, p* = the velocity of water diverted at right angles.
(2) '
Values in elbow equivalents for the most common percentages of water diverted in a Ixlxl in. tee are
as follows: 25 per cent____________ _____ :_____ _____ ________________ -- 16.0 33 per cent1............................................................ ........... .............. 9.0
50 per cent................................_.......... ....................................1---- 4.0
100 per cent................................:........................................ ............. 1-8
Table 4. Copper Elbow Equivalents3
1 90-deg elbow________ ______ 1 45-deg elbow._____i............... 1 90-deg long turn elbow....... 1 open return bendTM............... 1 open gate valve..................... 1 open globe valve....... :......... i 1 radiator valve'..... ........ ......... 1 radiator.... 1 boiler or heater._ 1 tee........... _.......
__ 1.0
0.7 ...._ 0.5
_ _ ; i.o
....,, 0.7
_.... 17.0
3.0 ___ 4.0
....., 4.0
..(Noteb)
aThe loss of head in an.elbow can be expressed in terms of the velocity head by the formula:
1
:h =
'
(3)
where
. 2s .
h = loss of head in milinches, v = velocity in inches per second, and g -- acceleration of gravity '(386 in. per second-per second).
bThe loss of head in copper tees:
(V + V>
.V 0.7 -
(4)
where .
N -- number of elbows that would cause the same los3 as the tee when the velocity of water in the
connecting pipe is v.
_
vt = velocity of the .water in the pipe entering the tee, and '
tj = velocity of the water in the pipe discharging from the tee at right angles to n.
Values in elbow equivalents for.most common percentages of-water diverted in a 1 in. x 1 in. tee.
100 per cent 50 per cent.-i. -..... --...................! 30 per cent....... ................................ ........ 25 per cent____J._____ ......................
1.2
. 4.0 . 16.0
20.0
3n Kt
346
Chapter 17. Hot Water Heating Systems and Piping
' The pipe sizes may he selected from Fig. 4 or from Table 1 which has been derived
from
supply main of the longest circuit first. Section AB carries 98 Mbh. From
- 1. ae;t will be noted that at 240 milinches per foot, a 1K in. pipe carries 98 Mbh.
ti? fore use lM in. P>Pe Section AB. Section BO carries 40 Mbh. A 1 in. pipe
Tberei
at 240 milinches per foot. Use a 1 in. pipe. Section OP carries 20 Mbh
^^Tthis will require % in. pipe. Section PQ carries 10 Mbh and requires ]A in. pipe.
nd t t|,e return start from the boiler and proceed backwards. Section IR carries
zn'Mbh and from Fig 4 a 1 in. pipe is required. Section RS carries 30 Mbh which is only
r htlv over the capacity of a % in. pipe, so use % in. Section ST carries 20 Mbh and
sll as a 3^ in. pipe. The radiator branches are.determined in the same manner. It is
r"n, from the chart that it is impossible to maintain a constant friction loss per foot
and therefore as the delivery varies there will be a change in the desired friction loss per
foot of pipeIt is desirable to check the various circuits so that if the variation from the calculated
distance is too great, it may be compensated by adding additional resistance at the r roper point. This may be accomplished by sizing the short circuits by the procedure previously outlined. Prepare a chart such as Table 5 to be used in calculating the
resistance of each circuit.
Section AB carries 98 Mbh with a unit head of 240 milinches per foot. In section AB there are 37 ft of pipe and 1M in. elbow. At 240 milinches per foot this is equivalent to gfiOO milinches total loss in this section. Section BC carries 58 Mbh with a length of 2 ft and 4 elbows. The unit loss in this section is 90 milinches per foot. Loss in this section is then 1080 milinches. Section CD carries 38 Mbh and has 16 ft of pipe and 1 elbow. The unit loss in 1 in. pipe is 155 milinches. The loss in this section is 2790 milinches. The balance of the supply main and the return main are handled in a similar manner.
Table 5. Piping Check Chart
Load. Mbh
Pipe Length
Ft
Elbows
Pipe Size In.
Unit Head Milinches
per Ft
Friction Milinches
Total Loss
Milinches
Supply Main
AB 98 BC 58 CD 38 DE 23 EF 11 fg 4
37 1
240 9600 9.600
2
4
lX
90
1080
10,680
16
1l
155
2790
13.470
9
0
M
220
1980
15.450
12 0
240'
2880
18.330
16
1
X . 50
850 19.180
HI 98 IJ 58 JK .54KL 47
LM 35 MN 20
Radiator Circuits
. CN 20 Supply * Return
DM 15
Supply Return
EL 12
Supply Return .
FK 7
Supply Return
GJ 4 Supply Return
5
'-5 `
IX
11 1 IX
16 1 1 .
11 0 1
9 . 0 .1
15 1 X
3 4
3 4.
14 15
3 4.
8; 9.
, 13 2
19 17
20 20
19 '. 17
.* 5 17 -
.X .X
X X
X X
- X
X X
347
240
4320
4.320
90
1260
5.580
300
5400
10.880
230
2530
13.410
140
1260
14.670
170 2890 . 17,560
170 3910
170
1190
5,100 .
420 9250
96
2880
12,130
270 9180 270 , 9450
18,630
100 2200
100
2100
. 4.300
50 650
50
1300
1,950