Document gDLnXvjR4xwmxqp1kypBmao49

ANNUAL VCM 1988 SURVEY Table of Contents The New Module The VCM Tank Far The Old Module Summation Chart VAB.0001154335 A ANNUAL VCM 1908 SURVEY ** ### LEAK # 001 # * 002 003 004 * $ 005 006 007 008 009 010 Oil 012 Part One The New Module This component was bagged -for the survey COMPONENT TYPE PPM LOCATION V (G) 300 Reactor 741,, Shell level,. East side evaculation valve stem F (G) 300 Reactor 741, Condenser level, Northwest side tee to pressure gauge F (G) 50 Reactor 741, Condenser level, * 9Flange on small vent line F <G) 1000 Reactor 741, Condenser level. South side of condenser, * pressure transmitter fitting F (G) 1000 Reactor 744, Condenser level, * J* Flange for Chem Nash, Rinse nozzle closest to reactor F (G) 1000 Reactor 745, Condenser level, ** Second vent valve. Flange on top or 745, Condenser si do F (G) 100 Reactor 745, Shell level. Southeast side of reactor, Vacuum gauQ fitting F <G) 70 Reactor 745, Shell level, NorthSSsf side evacuation valve flange (along siderail) V (L) iooo Reactor 743, Bottom 1evel, Second VCM valve F <G> 150 West RVCM receiver. Top level, North side pressure gauge F(L) 200 West RVCM receiver, Middle level, North side elbow in insulated line VAB.0001154336 A 013 ** 014 015 --A ** 016 -A *# 01 7 -A 018 F (L) V <L> V/F(L) V (L> V (L) F (L) V (L) V <L) V (L> 019 -A 020 021 022 023 -A ** 024 -A 025 ** 026 A B *C D E ** 027 028 V/F(L) F(L) V/F(L) V (L) V/F(L) FCG) FCG) F (G) F (G) F <G) V <6) V (G) V <G) F (G) F (G) F (G) V (G) V <G) 20 500 20 20 700 40 50 50 1500 50 250 50 20 100 150 200 FVCM receiver. Middle level, i1 North side manway North FVCM filter, Supply line, Diaphram valve RVCM charge piping, Supply side. Equilibrium valve between RVCM charge pumps Top of RVCM filter. Bleeder valve Zero Top of RVCM filter. Bleeder valve Zero RVCM charge line, just before tie in to FVCM piping, Valve 019 V/F<L> 50 N FVCM filter. Discharge valve North FVCM filter, Discharge valve Bottom of FVCM receiver. East side. Valve and/or flange Bottom of FVCM receiver. Charge valve Bottom of FVCM receiver, Nest side. Valve and/or flange South seal water seperator, Top level Northeast side pressure gauge Recovery East VCM Fitting Zero building, Second floor. condenser. Top pressure gaug North seal water seperater, Rupture disk South Zero Zero Zero vacuum pump. Discharge valve West of south compressor. Equilibrium valve, CV-854 y building, Ground floor, Middle of the east side, North/ transfer lines along ceiling, B val ve 1154337 ANNUAL VCM 1988 SURVEY ## ### LEAK # 100 101 102 103 104 105 106 107 108 109 110 Part Two The VCM Tank Farm This component was bagged for the survey COMPONENT TYPE PPM LOCATION V (G) 500 North VCM unload station, North of bridge. East side valve V (L) 150 North VCM unload station. South of bridge. East side valve F (L) 500 Middle north VCM unload station, South of bridge, VCM tank car connecting line F (G) 500 Middle north VCM un1oad station, V South of bridge. West side flange F (L) 700 Middle south VCM unload station, East side. Plug on line south of VCM car F (G) 50 Middle south VCM unload station, East side. Union on west side of VCM v- t an k c ar F (L) 70 Middle south VCM unload station, West side, North of bridge. Next to handrail, Flange F <L) 50 South VCM unload station. East side North of bridge, Next to handrail. Flange below valve F <G> 70 South VCM unload station. East side. Union on west side of VCM tank car F (L) V/F(L) 500 200 South VCM unload station. East side, Union on south si de of VCM tank car South VCM unload station. West side, North VCM railcar unloading line. Check valve VAB.0001154338 r 111 112 ** 113 ** 114 -A --Bc -D ** 115 ** 116 117 ## 118 119 120 V <L) V (L) F (L) V (L) F (L) F (L) V (L) V <L) F (L) F (L) V <G) V <L) F <G) F (L) 200 50 50 700 South of VCM sphere, VCM transfer pum Recycle valve to VCM sphere Compressor shed. East pipe rack, Fourth vertical line from north, - Horizontal valve, Stem Compressor shed. East pipe rack. Third vertical line from north, Flange to sensal1 control Compressor shed, East pipe rack. Second vertical line from north, Horizontal valve, Stem 30 100 20 750 30 100 Compressor shed. First compressor from south. South flange Compressor shed. Second compressor from south. Pressure gauge fitting Compressor shed, West pipe rack, Fourth vertical line from north. Check valve Compressor shed, West pipe rack. Sixth vertical line from north. East vertical valve South of VCM sphere. Relief valve, Discharge flange South of VCM sphere, Middle of piperTk FIange VAB.0001154339 A ANNUAL VCM 1988 SURVEY Part Three The Old Module ** ### This component was bagged for the survey LEAK # COMPONENT TYPE V (L) PPM LOCATION North RVCM receiver. Bottom level. Valve stem under receiver 202 203 F (L) F (L) 30 700 North Valve on receiver South RVCM receiver, Between levels, Nest side, Grade level connection, FI FVCM receiver, Second level, North side. Pressure gauge plug * 205 206 207 208 ** 209 210 211 F (L) V (L) V (L) V/F(G) F (G) V/F(G) F<6> 100 100 80 150 500 100 50 North FVCM filter. South side, Pressure gauge connection RVCM filter, East end. Top side, Val ve Reactor 500, Bottom level, * Main dump valve Reactor 500, Shell level. Northeast side. Auto AMS injection valve Reactor 600, Shell level, ** North side. Vacuum gauge tubing Reactor 600, Shell level, Northeast side. Auto AMS injection valve Reactor 400, Condenser level. North side. Thermowell stuck in flang VAB.0001154340 212 213 ** 214 215 219 220 221 A V <G> V/F(G) V <G) V(G) V (G) V (L) V (L) 70 100 100 500 iooo 500 700 Reactor 400, Condenser level, West side. Main recovery valve Reactor 600, Shell level. West side. Secondary recovery valve Reactor 700, Shell level, - Southeast side. Valve off of f 1 ange 12 inch Reactor 700, Condenser level, Southwest side. Secondary vent valve Southwest side. Rupture disk flange -fSeacrCOr J7 deiTser-- Northwest side, Rupture disk flange Zero anway u--ring Reactor 300, Condenser level, * Chem wash/rinse valve Reactor 600, Sround level, Secondary VCM valve. Stem +* Reactor 700, Ground level. Main VCM charge valve, Stem VAB.0001154341 SUBTOTAL UTQUID G tfS OQ FLAN6E ---------------------------------------------------- ------------- ----------i------------------------------------------------------------------------ ------------------------------------ ------------------------_J- VALV/E 1 UMPETEKfATtACD So BTOTA l_ NEW MODULE VOA TAM (c Ym o\t> module neuu module UCM TAM* TAStt O lf> MOi>t>L Gas uauio 7'OTA 1Q 8 o 1 X V V \lX X XV V I V^ %\n S | o 1 vf O 1 rx v/ O Q 8 Q 2 | Ho oc o 6 1 Oc Io (1 c ccr> i2 1 2 ) t 3 1 MM .. -- BP. c 0oi i<2 5o cM O oi o oo o a o oJ ai 7 A }^ A ij O 20 15 3 i ^ s |/ 1 S o u3 & 2 1 &8 H (0 15 5 IL 3 H H ..........................---i * 0 3= 37 J ------------------------------------------------------ -- .....................................A 8 f V. i VAB.0001154342 tb