Document gDGQddzQBgn9wkbQmX7EL27nJ
i I . GENERAL ENFORCEMENT TRENDS
A. Water Pollution
With Congress deeply involved in other problems, com paratively little attention was given to pollution. There was little evidence of real pressure from the Nixon administration to speed up pollution control or to Increase federal financing of control projects. David Dominick (a young lawyer-politician with no* background in pollution control) was appointed Com missioner of the Federal Water Pollution Control Administration (FWPCA). A proposed.Water Quality Improvement-Act of 1969 is being kicked arounaT~but "appears to be mostly concerned with oil spill clean up. The 1% Investment Tiix Credit for control facili ties will be out and may be replaced with a 3- or 5-yeur write-off provision.
Carl K]cln. Arsistant Jieare~tar-v-o-P--Infee-rl-orm--rie>:Tar-n his policy intention to halt new enforcement actions and, rather, to rely on informal progress review ses sions. He was promptly squelched by a number of organizations and had to back off.
Only real activity affecting us is the FWPCA pressure ' on Iowa to set early dates for secondary treatment
along the Mississippi and Missouri Rivers. Iowa Is * refusing to do this. As part of the scheme to bring Iowa into line and to speed up secondary treatment on the Mississippi, Missouri was forced to hold a hear ing on June 13 for moving forward the date of 1982 for secondary treatment in the Saint Louis area. No report has been forthcoming from the hearing, but we expect the date to be moved to 1975 or 1976. Early secondary treatment will cost the Organic Division about t'l " 1.5 M extra annually for the two Saint Louis area plantB.
I!, Air Pollution
Little new activity. The federal regional program is moving deliberately. Guidelines were issued for Dot ting the required air quality standards and the accom panying timetables.
The Illinois Air Pollutl.ojiJlpD.trol Board, in deep political trouDie, was given a last-minute reprieve by the new Governor in the closing hours of the Illinois Legislature and is still in existence with reasonably adequate funds. The reprieve was coupled with a warning to "shape up" public relationB-wise. Accordingly, the Board is in process of adopting extremely stringent air quality standards and un realistically tight timetablee for the Chicago and
OSW 01*630
M 28931
HARTOLDMONO017944
a
Saint Louie Regions, This will eventually cause high
control costs at W, G. Krummrich, which is in an area of relatively high pollution.
In Missouri, Peabody Coal dropped plans to open a
lou-oulfur coal mine for the Saint Louie area.. The control agencies are trying to force compliance this coming winter with the low-sulfur coal regulation.
An injunction suit will be heard September 3 to delay the date when low-sulfur coal must be burned. Chicago delayed for one year enforcement of their low-sulfur coal ordinance because of Inability of the coal market to Pupply the coal.
II. W. G. KRUMMRICH PLANT
A. Water
Phenol losaes to sewer were generally lower with May performance outstanding:
April
- 1,335 pounds per day average
May - 890 pounds per day average
June
- I,2o3 pounds per day average
vs. First Quarter average of 1,6?1 pounds per day and
goal of 1,100.
.
Contamination of the Rnnney wells and of the test wells around the toxic landfill was substantially lower - due probably to sustained high river levels.
Sauget Village applied for the conditionally approved federal grant for the waste treatment plant. The
treatment plant was idle during the entire quarter due to high river levels and inability of the new Corps of Engineers pump Btation to operate.
A "Total Oxygen Demand" instrument was tested as a continuous waste monitor. Test was generally satis factory and a unit will be ordered. Performance of
this unit vs. the "Total Carbon Analyzer" at Nitro will be watched carefully so as to guide in selection of monitors for other locations.
B. Air
The Buell dust collector on #9 boiler is operating at only about 75^ efficiency vs. 9J4^ guarantee. Reason is unknown and the vendor is working with us to solve the problem. Meanwhile, two additional units are being installed on Nos. 7 and 8 boilers.
OSW 014631 M 28932
HARTOLDMONOQ17945
3
A bag house for dust from the AC1 drier wbb approved by the Inorganic Division. Completion of thiB project (F.DC December, 19^9) should halt the intermittent problems with "oxidant1' emissions experienced over the past several years. This problem has been potentially very serious from the public relatione viewpoint.
A rupture of a safety disc in Santoflex 77 operations - caused 1.9,000 of auto paint claims.
In late June, a biologist from a Washington University task group studying air pollution called attention to "growth regulator" foliage damage over a wide area west of the J. F. Queeny Plant. W. 0. Krummrich Plant is collaborating in the investigation, but there is no real evidence that an emission from W. G. Krummrich
caused the problem. We can expect adverse publicity when the biologist's report is released.
III. J. F. QUEENY PLANT
A. Water
The Scope and Authorization Request were prepared for
CEA-2107 (Waste Segregation and Neutralization, NFC 960,000) needed for preparing acidic wastes for
municipal treatment. The Corps of Engineers gave per
mission for submerging our river outfall through which clean acid will be discharged without further treat- '
ment. In late June we received notification that our share of the cost of the Corps of Engineers floodwall pumping station was being further escalated to "over
$^00,000." Our entire commitment to this project is being reviewed.
The BiEphenol A phenol reduction project'was completed, but total reduction expected was not attained. Problem iB under Btudy.
B. Air
The Particulates and Odor Survey is mostly completed. This survey will establish priorities for further vent clean-up projects.
CED is proceeding on Scope preparation for installing - a dust collector on #16 Qeyer Avenue boiler.
Coal suppliers are being contacted for possible supply ing of low-sulfur coal during the forthcoming winter in event the Peabody injunction 1b denied in early
September.
DSW 014632
M 28933
HARTOLDMON0017946
V. NITRO PLANT
A. Water
Pilot plant testing of the activated sludge process is continuing with good waste destruction in reasonable sojourn time but with continued difficulty maintaining and building sludge. This means that, in event of severe mechanical sludge loss or sludge poisoning, a future treatment plant could be out of action for an extended period (several weeks). We need to discover what is inhibiting sludge growth and then to provide alternate in-plant disposal for the inhlbitor(s). As an alternative procedure, in case in-plant control is not feasible, would be to set up very tight controls on operation of the plant.
With edvent of warm weather, treatment efficiency of the present aerated lagoons increased considerably 6o that, as long as the aerated lagoon treatment was functioning normally, waste discharge loading was well below permit level. However, failure of the neutralization bed by in-plant excessive losses of H2SO4 necessitated operating at low rate for three weeks followed by renewal of the bed in late May. Procedures for handling H2SOI1 were surveyed and pro cedures instituted to prevent recurrence of the excess losses. Control of Tall Oil losses was excellent throughout the entire quarter.
CED is proceeding on scope preparation for conversion - to the-activated sludge process. Pre-project approval
was given for purchase of three additional aerators (floating type) to Increase treatment capacity of the present lagoons. These aerators will be used in the activated sludge process later.
B. Air
No activity. Citizen/politician complaints about air pollution in the Kanawha Valley apparently are becom ing more vocal.
V . DELAWARE RIVER PLANT
We signed a contract for our share ($3^,000) of the engineer ing and pilot plant study for regional treatment by the DRBC. A consultant was retained by the DRBC and the study is under way.
The pilot plant testing of our wastes by a S^lnt Louis con sultant showed that our wastes are reasonably amenable to treatment by the activated sludge process Including the wastes from the phosphate esters plant.
Most of the pollution abatement projects are reasonably
DSU 014633
M 28934
HARTOLDMONO017947