Document gD9YmnOemovwMJe73ppe0bG19
Monsanto
rHOM t NftMt ft LOCAT
4Tf '
,
waiter
i
MrtaiNct
TO :
E. E. Stewart, Krummrich January 17, 1972 PCB ENVIRONMENTAL CONTROL SAMPLING
Mr. A. E. Leisy
0. L. Bratach
C. F. Buckley B. L. Caraway^^^ W. C. Engmart*TM
P. E. Helsler 0. A. Hlppe
R. M. McCutchan J. R. Savage - G.O.
We have reviewed the existing sampling system to control
PCB losses within the plant and- to provide historical
data related to the effectiveness of the PCB control
program. .
.
At present; We obtain samples on a routine basis. (Thursday and Monday) at five locations
--Z Department Effluent
2-A
241' plant exit sewer
1-B 30" plant exit sewer
Influent Waste Treatment Plant
Effluent Waste Treatment Plant
Futurei
Per our discussions we will eliminate sampling 4-Z, 2-A p.nd 1-B on a routine basis. We will
limit our routine sampling to the Waste Treatment Plant Influent and Effluent.
The Waste Treatment Plant Influent best reflects the true
losses from the plant. At this point we note trends and can evaluate effects df the control program.
The Waste Treatment Effluent Indicates PCB losses to the river. Our goal at this point Is 1 #/day. Measurements at this point would be of prime concern to any control agency because at this point the stream flows to the river.
All other samples are for control purposes and will be on a non-routine basis as we further perfect sampling techniques and want to better define sources requiring additional control.
We plan to continue to perfect the PCB sampling technique such that the results truly reflect the amount of PCB's
present in the sampled stream.
MGNS 099093
Hr. A. E. Lelsy PCB ENVIRONMENTAL
CONTROL SAMPLING
Page 2
1/17/72 WOK
A PCB laboratory analysis costs about $50. Our program Is designed to give us the required control data at mini mum costs.
Edward E. Stewart Technical Services Department
/tm
MOMS 099094