UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4
ATLANTA FEDERAL CENTER 61 FORSYTH STREET S.W
ATLANTA, GEORGIA 30303-8960
SENT VIA ELECTRONIC MAIL
Anthony Gregory General Manager Republic Services/Richland Creek Road Sanitary Landfill 5691 South Richland Creek Road Buford, Georgia 30518 agregory@republicservices.com
Dear Mr. Gregory:
Enclosed is a copy of the final report generated by the U.S. Environmental Protection Agency's Region 4, South Air Enforcement Section, for the inspection conducted at the Richland Creek Road Sanitary Landfill, located in Buford, Georgia, on July 8, 2021.
If you have any questions, you can contact me at (404) 562-9134, or by email at taylor.kevin@epa.gov.
Enclosure
Sincerely,
Digitally signed by KEVIN
KEVIN TAYLOR TAYLOR Date: 2021.10.19 13:36:35 -04'00'
Kevin Taylor Environmental Engineer South Air Enforcement Section
ENCLOSURE FINAL INSPECTION REPORT
United States Environmental Protection Agency (EPA) Region 4 Air Enforcement Branch Draft Inspection Report
I. GENERAL INFORMATION
Facility Name: Richland Creek Road Sanitary Landfill
Location (Address):
5691 South Richland Creek Road Buford, Georgia 30518
Inspection Date:
July 8, 2021
Type of Inspection (Full or Partial Compliance Evaluation): Partial Compliance Evaluation
ICIS-Air Number:
GA0000001313500219
EPA Investigator(s)/Inspector(s): 1. Kevin Taylor, Environmental Engineer 2. Sydnee Adams, Environmental Engineer 3. Andrew Mills, Environmental Engineer 4. Katelyn Bergl, Environmental Engineer 5. Bethany Terpin, Environmental Scientist
State/Local Investigator(s)/Inspector(s): 1. Kenneth Phillips, Georgia Environmental Protection Division (EPD)
Person(s) Contacted at Facility (Name and Title): 1. Justley Harston, SE Area Environmental Manager 2. Tony Gregory, General Manager 3. John Odom, Operations Manager 4. Benjamin Haney, SCS Field Services 5. Greg Hinson, SCS Field Services 6. Sowmya Bulusu, SCS Field Services
Report Prepared by: Kevin Taylor
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 1 of 11
II. FACILITY INFORMATION A. Facility and Permit Information Facility and Permit Information
Comments
1. Type of facility (e.g., chemical plant, refinery, cement manufacturer, etc.).
2. Air permit number(s) and type of permit (e.g., Title V, PSD, Synthetic Minor, etc.).
Municipal Solid Waste Landfill
Title V Operating Permit No. 4953-135-0219-V-04-0
3. Air permit issuance date.
06/01/2018
4. Air permit expiration date.
05/31/2023
5. Facility classification (Major, Synthetic Minor/Conditional Major, Minor).
6. Major source pollutants (if applicable).
7. Applicable regulations (e.g., State Implementation Plan, MACT Subpart FFFF, NSPS Subpart EEEE, etc.).
Major
Hazardous Air Pollutants (HAPs) Volatile Organic Compounds (VOCs) 40 CFR Part 60 Subpart WWW NSPS - Municipal Solid Waste Landfills
40 CFR Part 61 Subpart M NESHAP - Asbestos
8. Types of air emission points (e.g., tanks, process vents, boilers, etc.).
9. Types of air pollution control equipment (e.g., baghouse, scrubber, afterburner, etc.).
40 CFR Part 63 Subpart AAAA MACT - Municipal Solid Waste Landfills Gas Collection and Control System (GCCS)
Gas generated from the decomposition of waste is sent to either an enclosed flare, (2)
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 2 of 11
open flares, or a 3rd party power generation facility (separately permitted).
B. Process Description (provide narrative or attach description provided by the company or excerpts from the permit)
Richland Creek Road Sanitary Landfill receives, manages, and disposes of solid waste, including, but not limited to, municipal solid waste, commercial waste, and industrial waste. The maximum permitted design capacity approved is 34.7 million cubic meters. Waste is accepted, compacted, and covered daily. Waste decomposition produces landfill gas and leachate, both of which are managed through collection and control systems. Gas generated from the decomposition of waste is collected by a gas collection and control system (GCCS) and either burned in an enclosed flare or two open flares or sent to a third-party power generation facility. The third-party power generation facility has its own landfill gas treatment system.1
III. INSPECTION ACTIVITIES
Activity
Yes
Comment
No
NA
Opening Meeting
1. Date and time entered the facility.
Yes The EPA Region 4 inspectors entered the facility on July 8, 2021, at 10:00 am (EDT).
2. Credentials presented to facility personnel (include name and title).
Yes Upon arrival, EPA Region 4 inspectors presented their EPA credentials to the facility personnel.
3. Conducted an opening meeting to explain the purpose and objectives of the inspection.
Yes The EPA Region 4 inspectors held a virtual opening meeting with the Richland Creek Landfill personnel and representatives of the SCS Field Services contractors via Microsoft
1 The process description was taken from the overall facility process description described in the UWL/Richland Creek Road Sanitary Landfill Title V Operating Permit No. 4953-135-0219-V-04-0.
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 3 of 11
Teams on July 7, 2021 at 2:00 pm EDT during which the purpose and objectives of the inspection were explained.
4. Discussed safety issues.
Yes The EPA inspectors discussed with the facility the personal safety equipment needed to conduct the inspection, emergency procedures for the facility and COVID-19 safety protocols required by EPA and the facility.
5. Discussed which records to be reviewed.
Yes Based on Covid-19 safety protocols, no records were reviewed onsite during the inspection. Maps and semiannual reports were acquired prior to the onsite inspection.
6. Discussed the facility walk-through Yes EPA inspectors discussed the overall
and the areas to be observed in the
inspection plan, which included starting at the
facility.
flares, monitoring ground level methane
around the perimeter and then walking the
grid pattern in areas to be determined during
the walk-through.
7. Discussed facility policy regarding photographs or video (if applicable).
Yes EPA inspectors indicated that videos may be taken with the infrared camera. If a video was taken, EPA would give the facility prior notice of the recording and ask that the facility identify any proprietary concerns before any video was taken to help EPA assess the need for the video. All videos taken during the inspection would be sent to the facility.
8. Discussed the use of the infrared camera, TVA, PID, and any other equipment.
Yes EPA inspectors communicated the use of the infrared camera, the toxic vapor analyzer (TVA) and GPS unit for location identification.
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 4 of 11
9. Discussed CBI.
EPA inspectors requested that anything that the facility considers to be CBI be identified. The facility would also have an opportunity to review the EPA inspection report and any recorded video for CBI content prior to finalizing it. Any information identified as CBI would be treated in accordance with regulations.
Records Reviewed at the Facility
10. The types of records reviewed and the time period reviewed.
No Due to Covid-19 safety concerns, no records were reviewed during the inspection.
Facility Walk-Through Observations
11. The process equipment observed Yes See Attachment A and the associated operational rate observed (e.g., Furnace 1 production rate was 5 lbs/hr on 1/1/15, at 2:00 pm - permit requires max rate at 6 lbs/hr).
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 5 of 11
An attachment may be used for a large amount of information.
12. The type of process parametric
N/A
monitoring observed and the
associated value observed (e.g.,
Furnace 1 flux injection rate was
200 lbs/batch at 1/1/15, at 2:00 pm
- permit requires max rate at 225
lbs/batch).
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
An attachment may be used for a large amount of information.
13. If process equipment or parametric N/A monitoring equipment was not operating, state the reason by facility personnel why the equipment was not operating.
14. The type of air pollution control
Yes Waste gas generated from the decomposition
equipment, the process equipment it
of waste in the landfill is collected by a gas
is controlling, and the associated
collection and control system (GCCS). The
parametric monitoring value
waste gas is primarily sent to a third-party
observed (e.g., baghouse pressure
power generation facility. However, there is
drop, temperature, scrubber flow
an enclosed flare that is used as a backup for
rate, etc.).
the power generation facility's waste stream
and a utility/candlestick flare that is used as a
backup for the waste gas stream going to the
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 6 of 11
(For example - RTO 1 controlling furnace 1, 1,500 degrees F on 1/1/15, at 2:00 pm - permit requires 1,400 degree F or higher).
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
An attachment may be used for a large amount of information.
engines at the third-party power generation facility. At the time of the inspection, both flares were in operation. Due to the safety protocols for Covid-19, the EPA inspectors did not go into the control room to obtain operating parameters but did observe both flares using the infrared camera.
It should be noted that the facility is permitted for a third utility flare. However, the third flare was disconnected and removed from the GCCS in May 2016. It is still listed in the Title V permit but the facility would have to notify the Georgia EPD before connecting and operating the flare in the future.
15. Continuous emissions monitoring N/A devices and values observed. (e.g., CEMS, COMs, etc.).
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
An attachment may be used for a large amount of information.
16. If air pollution control equipment N/A was not operating, state the reason
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 7 of 11
by facility personnel why the equipment was not operating.
17. Capture and collection system
Yes Waste gas generated from the decomposition
(enclosures and hoods)
of waste in the landfill is collected by a gas
observations, if applicable (e.g., the
collection and control system (GCCS).
magnitude and duration of emission
During the inspection, there were recorded
escaping capture from the hood).
instances of leaks and emissions using both
the TVA and the infrared camera. See
Attachment A.
18. Ductwork transferring the
N/A
emissions to the air pollution
control device observations, if
applicable (e.g., the magnitude and
duration of emission escaping from
the ductwork, holes or deterioration
in ductwork, no deterioration
observed, etc.).
19. Any existing unpermitted emission No points, new unpermitted emission points, or non-permitted construction activities observed. (if yes, describe in the comments field).
20. Were any visible emissions observed? (if yes, identify the location and equipment).
No There were no emissions which were visible to the naked eye. However, the emissions that were observed were volatile organic emissions which are not normally detectable by sight but were observed using the TVA and/or the infrared camera.
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 8 of 11
21. Was a Method 9 reading
No
performed? (if yes, identify the
location and equipment).
22. Was the cause of the visible
N/A
emissions investigated and the
information documented?
23. Was a Method 22 performed for
N/A
visible emissions? (if yes, identify
the location and equipment).
24. Identify the cause of the visible
N/A
emissions as explained by facility
personnel, if applicable.
25. Was the infrared camera used? If so, attach the video log (which includes the equipment ID, and the date and time the video was recorded) and videos to this report.
Yes See Video Log Attachment B
26. Was the TVA used? If so, identify the equipment monitored and the results.
Yes See TVA Reading Log Attachment C
Provide the date and time the information was recorded by the inspector. Include actual instrument readings for each piece of equipment monitored above the
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 9 of 11
leak definition and/or where the infrared camera identified a release.
An attachment may be used for a large amount of information.
27. Was the PID used? If so, identify No how the PID was used and the results. Provide the date and time the information was recorded by the inspector.
An attachment may be used for a large amount of information.
Closing Meeting 28. Conducted a closing meeting.
29. Summarize any additional information needed, if applicable?
30. Accept a declaration of CBI, if applicable?
Yes EPA Region 4 inspectors conducted a closing meeting on July 8, 2021 at 3:49 pm EDT with the facility personnel and the participation of the Georgia EPD inspector. The close out meeting was conducted in the parking lot of the facility.
No No additional information was requested of the facility at the time of the inspection.
No Although the CBI procedures were explained in the opening meeting and at the start of the inspection. A CBI declaration was not made at the time of the inspection. The facility was advised that an inspection report and all recorded videos and pictures would be sent to them for a CBI review following the inspection.
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 10 of 11
31. Discussed observations.
Yes EPA inspectors discussed the observations made during the inspection. This included the specific areas of elevated TVA readings at the extraction well sites and leachate collection and clean out areas and the infrared video recordings of emissions at the extraction well sites and leachate collection and clean out areas and the South Leachate Tank.
32. Discussed next steps, if applicable? Yes The EPA inspectors stated that an inspection report and the submission of all recorded videos and pictures would be the next step in the process.
33. Date and time inspection concluded.
Yes The inspection concluded on July 8, 2021 at approximately 4:00 pm EDT.
Miscellaneous
34. Include any additional observations, N/A if applicable.
Digitally signed by KEVIN TAYLOR
EPA Investigator/Inspector Signature:____K_E_V_IN__T_A_Y_L_O_R__Dat_e:2_02_1.1_0.1_913_:37_:16_-0_4'0_0' _________
Digitally signed by TODD
TODD GROENDYKE GROENDYKE EPA Supervisor Signature & Title ___________________D_ate_: _20_21_.1_0._19_1_3:5_3_:34_-_04_'00_' _
___________________________________
Date Report Finalized:___________________________________
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 11 of 11
ATTACHMENTS
1. Attachment A: 2. Attachment B: 3. Attachment C:
Inspection Narrative Video and Photo Log TVA Recorded Readings Log
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
ATTACHMENT A
Inspection Narrative
The EPA inspectors, along with Kenneth Phillips of the Georgia EPD, began the inspection with a downwind reading from the TVA. The weather condition was cloudy, and the wind was from the West Northwest at approximately three (3) miles per hour (mph), with wind gusts up to 10 mph. The downwind reading was taken at 10:46 am around the gas conversion facility. The TVA recorded an organic vapor reading of 10 parts per million (ppm). While in the gas conversion facility area, the infrared camera was used to observe the enclosed flare and the candlestick/utility flare. At 11:10 am, an upwind reading from the TVA was taken around the landfill's Stage 2 landfill area and the TVA recorded a reading of 1.0 ppm. The inspection team then started the landfill monitoring survey with the perimeter well heads and leachate collection systems, starting with Stage 2.
Readings above 500 ppm were recorded for Well 91 (high 1070 ppm), Well 78 (high of 70,000 ppm), Well 12 (high of 13,000 ppm), and the east and west leachate collection system clean outs lines (high of 10,000 ppm). The inspection team concluded the perimeter monitoring and broke for lunch. Upon returning from lunch, the EPA inspection team decided to focus the infrared camera on the leachate collection points and the TVA on surface monitoring using a grid pattern across the landfill. For the grid monitoring, several issues were recorded at Well 194. TVA readings greater than 1000 ppm were measured on the vacuum side of Well 194 (not the extraction side). The air header and liquid header isolation valves around Well 194 recorded readings greater than 500 ppm. The gas header valve near Well 194 recorded readings as high as 2000 ppm. The access gas riser for the Well 194 header line (18-inch line) recorded TVA readings greater than 1000 ppm, with a peak reading of 3200 ppm. For the other areas surveyed, Well 195 had a peak reading of 7000 ppm on its vacuum side and 700 ppm on its extraction side. Surface erosion to the west of Well 195 recorded a ground reading of 512 ppm. The LC9 leachate collection cleanout line recorded a reading of 1900 ppm. In the Stage 9 area of the landfill, the leachate collection sump recorded readings of up to 60,000 ppm on the south line and readings more than 190,000 ppm on the north line. The liner edge marker to the north of the leachate collection area had a peak reading of 1700 ppm. For more information on the TVA readings and the exact location of the readings, see Attachment C of this report. Also, see Attachment B for the photographs and videos taken with the infrared camera.
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Video Log
Image File Name
Number
1
MOV_0975.mp4
2
MOV_0976.mp4
3
MOV_0977.mp4
4
MOV_0978.mp4
5
MOV_0979.mp4
6
MOV_0980.mp4
7
MOV_0981.mp4
8
MOV_0982.mp4
ATTACHMENT B Video and Photo Log
Date and Time (incl. time zone and DST) 7/8/2021 11:49 7/8/2021 11:52 7/8/2021 12:35
7/8/2021 13:30 7/8/2021 15:37 7/8/2021 16:06
Description of Image
Utility/Candlestick Flare Enclosed Flare with emissions Leachate Clean Out 2 - Flange leak - down from well 98 Extraction Well 78 South Leachate Tank - Leachate Collection Sump for Stage 9 - valve box - crack in ground - edge of liner
7/8/2021 16:17
Leachate Collection Sump for Stage 9 - South one - from ground under pipe
7/8/2021 16:24
Leachate Collection Sump for Stage 9 - North one - from ground under pipe
Photo Log
Image File Name
Number
1
DC_0983.jpg
2
DC_0984.jpg
3
DC_0985.jpg
4
DC_0986.jpg
Date and Time (incl. time zone and DST) 2021:07:08 15:37:29
2021:07:08 15:39:06 2021:07:08 15:39:21 2021:07:08 15:39:50
Description of Image
Leachate Collection Sump for Stage 9 - erosion
West Side Edge of Liner - erosion West Side Edge of Liner - erosion West Side Edge of Liner - erosion
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
# Reading Time
(ppm)
1
2
10:49
AM
2
10
10:30
AM
3
1
11:11
AM
4 1070 11:26
AM
5 70,000 11:34
(70%) AM
6 13,000 11:41
(1.3%) AM
7 10000 12:10
(1%)
PM
8 1500
n/a
9 780
n/a
10 2,000
n/a
11 3200
n/a
12 600
n/a
13 700
2:50
PM
14 550
2:56
PM
15 7,000 3:00
PM
16 600
3:05
PM
17 1,900 3:09
PM
ATTACHMENT C
TVA Recorded Readings Log
Location description LFGE, gas conversion area office, downwind
reading upwind reading
Well 91
Well EW 78
Well 12
leachate cleanout, downhill from Well
98 (east) W194
Isolation Valves at Liquid conveyances
Gas header
Access Riser
Stage 9 West Slope
Stage 9 West Slope
Stage 9 West Slope
Well 195
Stage 9 West Slope, crevice
Well LC09
GPS coordinates 3407.782, 08401.959
Notes
3407.274, 08402.537 3408.150, 08401.841 3408.177, 08401.867 3408.204, 08401.886 3408.308, 08402.042
3407.956, 08402.543 3407.952, 08402.546 3407.952, 08402.546 3407.952, 08402.546 3407.966, 08402.551 3407.960, 08402.555 3407.968, 08402.561 3407.972, 08402.572 3407.976, 08402.577 3407.982, 08402.582
range: 400-600 ppm distressed vegetation, range: 100,000-
200,000 ppm range: 3000-5000 ppm range at the ground: 3000-5000 ppm, max
at flange range: 500-600ppm 550 ppm at air conveyance range: 800-1000ppm range: 1,000-2,000 ppm
Range 1,000-2,000ppm
Range: 580-700ppm
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
18 37,000 3:16
Stage 9 Leachate
3407.967,
(3.7%) PM
Collection Riser
08402.617
19 191,600 3:18
Stage 9 Leachate
3407.966,
(19.16%) PM
Collection Riser
08402.615
20 61,800 3:20
Stage 9 Leachate
3407.964,
(6.18%) PM
SUMP
08402.614
21 19,400 3:26
Above Leachate
3407.966,
(1.94%) PM
SUMP
08402.612
22 300,000 3:28
Pump 3-67
3407.966,
(30.00 PM
08402.612
%)
23 4,500 3:30 Near Leachate SUMP 3407.963,
PM
08402.612
24 1,700 3:31
Liner Boundary
3407.962,
PM
08402.608
25 550
3:34
Liner Boundary
3407.952,
PM
08402.602
26 620
3:35
Liner Boundary
3407.955
PM
08402.595
Range: Above 10,000 1,000ppm on top of flange
Project Name: Richland Creek Road Sanitary Landfill ICIS/Project No.: GA0000001313500219-2021 Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019